HomeMy WebLinkAboutNarrative and Questions of The Planning Committee N.W.E. Riverside Substation Tower Addition (Site Plan)Supplemental Narrative and Questions of The Planning Committee NorthWestern Energy’s Conceptual Review Application for Installation of a Substation Tower for Communications NorthWestern Energy’s Bozeman Riverside Substation Supplemental Narrative This substation tower will be used by NorthWestern Energy for RF communications to and from our substation facility for NorthWestern’s private internal networks in support of Operations, Monitoring and Control of our Electrical Transmission and Distribution system. Future uses may include RF communications in support of Operations, Monitoring and Control of NorthWestern’s Natural Gas Transmission and Distribution System, our AMI (Automated Metering Infrastructure) project as well as other needs for Technology Support by our Company. This substation tower is an addition to the substation structures already in place. Given that this substation tower is physically inside the secured fenced substation property, NorthWestern cannot grant access for public or 3rd party carriers or mobile carriers (for co-location purposes) due to NorthWestern’s Physical and Cyber Security Policies. Compliance with both Federal Aviation Administration (FAA) and the Federal Communications Commission (FCC) requirements has been met. The substation tower does not require registration nor requires any obstruction lighting given the height. The microwave communications hop is licensed with the FCC. Questions The following constitute the questions (at this time) to the City of Bozeman Planning Commission by NorthWestern Energy in regards to our CONR application for a Substation Tower Addition at our Bozeman Riverside Substation: 1. Since the substation tower cannot be granted access by 3rd party carriers (as outlined above), can NorthWestern be granted an exemption to the permit process and proceed with erection of this substation tower? 2. Our current requirements for the installation of this tower and the microwave hop are the week of 07-November-2020. This is in support of the planned Energization of the Substation Transmission improvements project at this substation. Given this project schedule, which is contractor and resource limitation driven, can the application be fast tracked and granted construction to meet this deadline?