HomeMy WebLinkAbout21056 Staff Report Staff Report
NWE Substation Tower Addition
Site Plan Review Application 21056
June 16, 2021
Page 1 of 14
Application No. 21056 Type Site Plan
Project Name NWE Riverside Substation
Summary A Site Plan application to allow the construction of an additional internal communications
tower and a control house in an existing substation.
Zoning PLI Growth
Policy
Public lands and institutions Parcel Size 1 acres
Overlay District(s) NA
Street Address 195 Mossbridge Rd. Bozeman, MT
Legal Description Tract 1 of COS No. 4DE, S 26, T 1 S, R5 E, Gallatin County, MT
Owner NorthWestern Corporation, D/B/A NorthWestern Energy
Applicant NorthWestern Energy, 11 E. Park St. Butte MT, 59701
Representative Kirt Mayson, 11 E. Park Street, Butte, MT 59701
Staff Planner Jacob Miller Engineer Cody Flammond, Mikaela Shultz
Noticing Public Comment Period Site Posted Adjacent Owners
Newspaper Legal Ad
5/12/21 to 5/27/21 5/12/21 5/12/21 N/A
Advisory Boards Board Date
Recommendation
Development Review
Committee
3/31/21 Adequate
Recommendation Approval with conditions
Decision Authority Director of Community Development Date: 6/18/2021
Full application and file of record: Community Development Department, 20 E. Olive St., Bozeman, MT 59715
Staff Report
NWE Substation Tower Addition
Site Plan Review Application 21056
June 16, 2021
Page 2 of 14
FINDINGS OF FACT AND APPEAL PROVISIONS CERTIFICATE
A) PURSUANT to Chapter 38, Article 2, Bozeman Municipal Code (BMC), and other applicable sections of Ch.38, BMC, public
notice was given, opportunity to submit comment was provided to affected parties, and a review of the Site Plan described in
this report was conducted. The applicant proposed to the City a Site Plan (SP) to permit the construction an additional
tower and control house in an existing substation. The purposes of the Site Plan review were to consider all relevant
evidence relating to public health, safety, welfare, and the other purposes of Ch. 38, BMC; to evaluate the proposal against the
criteria of Sec. 38.230.100 BMC, and the standards of Ch. 38, BMC; and to determine whether the application should be
approved, conditionally approved, or denied.
B) It appeared to the Director that all parties and the public wishing to examine the proposed Site Plan and offer comment were
provided the opportunity to do so. After receiving the recommendation of the relevant advisory bodies established by Ch. 38,
Art. 210, BMC, and considering all matters of record presented with the application and during the public comment period
defined by Ch. 38, BMC, the Director has found that the proposed Site Plan would comply with the requirements of the BMC if
certain conditions were imposed. Therefore, being fully advised of all matters having come before them regarding this
application, the Director makes the following decision.
C) The Site Plan has been found to meet the criteria of Ch. 38, BMC, and is therefore approved, subject to the conditions listed
in this report and the correction of any elements not in conformance with the standards of the Title. The evidence contained in
the submittal materials, advisory body review, public testimony, and this report, justifies the conditions imposed on this
development to ensure that the Site Plan complies with all applicable regulations, and all applicable criteria of Ch. 38, BMC.
On this ______ day of ________________, 2021 Martin Matsen, Director of Community Development, approved with
conditions this Site Plan for and on behalf of the City of Bozeman as authorized by Sec. 38.200.010, BMC. The approval of
this Site Plan shall be effective for twelve (12) months from the date of Plan approval, which is the ______ day of
__________________, 2022. At the end of this period the Director may, at the request of the developer, extend the approval
in accordance with Ch. 38 Art.230, BMC.
D) This Director of Community Development’s project decision may be appealed by filing a documented appeal with and paying
an appeal fee to the Clerk of the Commission for the City of Bozeman within 10 working days after the date of the final decision
as evidenced by the Director’s signature, following the procedures of Sec. 38.250.030, BMC.
DIRECTOR OF COMMUNITY DEVELOPMENT
Staff Report
NWE Substation Tower Addition
Site Plan Review Application 21056
June 16, 2021
Page 3 of 14
CONDITIONS OF APPROVAL
Please note that these conditions are in addition to any required code provisions identified in this report. Additional conditions
of approval and code corrections are required and will be included with the final report provided to the Director of Community
Development
Recommended Conditions of Approval:
1. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as
conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the
Bozeman Municipal Code or state law.
Staff Report
NWE Substation Tower Addition
Site Plan Review Application 21056
June 16, 2021
Page 4 of 14
Figure 1: Current Land Use
Staff Report
NWE Substation Tower Addition
Site Plan Review Application 21056
June 16, 2021
Page 5 of 14
Figure 2: Growth Policy Designation
Staff Report
NWE Substation Tower Addition
Site Plan Review Application 21056
June 16, 2021
Page 6 of 14
Figure 3: Zoning
Staff Report
NWE Substation Tower Addition
Site Plan Review Application 21056
June 16, 2021
Page 7 of 14
Figure 4: Site Plan