Loading...
HomeMy WebLinkAbout016 - PROJECT NARRATIVEPROJECT NARRATIVE 5th & Main| SPR SUBMITTAL 5th & Main | BOZEMAN, MT, 59715 11.02 SOUTH/WEST FACADE SOUTH/EAST FACADE NORTH/WEST FACADE 407 West Main Street east north west south PROJECT TIMEFRAM june 2022CONR|SUBMIT CONCEPT REVIEW TO THE CITY SPR|SUBMIT SITE PLAN REVIEW TO THE CITY BUILDING PERMIT REVIEW BUILDING PERMIT REVIEW END OF CONSTRUCTION june 2024july 2022august 2022SPR | APPROVAL With our building located between Bozeman’s Midtown and Historic Downtown our material palette pulls inspiration from both directions. Brick, steel and glass are utilized with contemporary detailing, providing timeless materials with a connection to Bozeman’s past, yet looking to the future in their permanence. We’ll be mixing the brick with metal canopes and railings for a historic nod with industrial touches and softening the approach with wood soffits, providing a connection to the traditional residential building materials. We are again looking for the link between an where Bozeman has come from and where it is headed. MATERIAL CONTEXT light brick dark brick fiber cement panel wood november 2022december 2022january 2023april 2023START OF CONSTRUCTIONoctober 2022september 2022