HomeMy WebLinkAbout016 - PROJECT NARRATIVEPROJECT NARRATIVE 5th & Main|
SPR SUBMITTAL
5th & Main | BOZEMAN, MT, 59715
11.02
SOUTH/WEST FACADE
SOUTH/EAST FACADE
NORTH/WEST FACADE
407 West Main Street
east north west south
PROJECT TIMEFRAM
june 2022CONR|SUBMIT CONCEPT
REVIEW TO THE CITY
SPR|SUBMIT SITE PLAN
REVIEW TO THE CITY
BUILDING PERMIT
REVIEW
BUILDING PERMIT
REVIEW
END OF
CONSTRUCTION
june 2024july 2022august 2022SPR | APPROVAL
With our building located between Bozeman’s Midtown and Historic Downtown our material palette pulls inspiration from both directions. Brick, steel and glass are utilized with contemporary detailing, providing timeless materials with a connection to Bozeman’s past, yet looking to the future in their permanence. We’ll be mixing the brick with metal canopes and railings for a historic nod with industrial touches and softening the approach with wood soffits, providing a connection to the traditional residential building materials. We are again looking for the link between an where Bozeman has come from and where it is headed.
MATERIAL CONTEXT
light brick dark brick fiber cement panel wood
november 2022december 2022january 2023april 2023START OF
CONSTRUCTIONoctober 2022september 2022