Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
018 A2.1 ROOF PLAN
REFDW 1 A300 2 A301 2 A300 1 A301 3 A600 2 A600SLOPE1/8" IN 12"SLOPE1/8" IN 12"SLOPE1/8" IN 12"SLOPE1/8" IN 12"SLOPE SLOPE SLOPE SLOPE 4 A600 STANDING SEAM METAL ROOF (BLACK) MECHANICAL SCREEN ON ROOF 24 GA. CORRUGATED METAL SIDING (BRONZE) ASPHALT SHINGLE ROOF (CHARCOAL) STANDING SEAM METAL ROOF (BLACK) METAL CANOPY (BLACK) T.S. PERGOLA (BLACK) METAL AWNING (BLACK) EPDM ROOF (WHITE) GUTTER & DOWNSPOUT GUTTER & DOWNSPOUT GUTTER & DOWNSPOUT GUTTER & DOWNSPOUT 6:12 6:12 3:1212:1212:1212:1212:121' - 0"A800 3 A800 2 A800 1 1 A600 33' - 5 7/8" A2.13 ROOF DRAIN, SEE DETAIL 2/A201 A800 4 1' - 0"1' - 0"1' - 0"1' - 0"1' - 0" A800 5 V A L L E Y VALLEY VAL L EYRIDGERIDGE SUBSTRATE FIRESTONE INSULATION1/2" MIN.(SEE NOTE #2) SUBSTRATE INSULATION 1/2" (13 mm) MIN.SEE NOTES (SEE NOTES) TPO MEMBRANE WATER DAM COMPRESSION RING STRAINER BASKET COMPRESSION RING STRAINER BASKET 12" SEE SLOPE LIMITS OVERFLOW ROOF DRAIN PRIMARY ROOF DRAIN CONTINUOUS BEAD OF FIRESTONE WATERBLOCK (SEE NOTE 4) APPROPRIATE FIRESTONE BONDING ADHESIVE (ADHERED SYSTEMS ONLY) 2'-0" MIN. NOTES: 1. REFER TO FIRESTONE WEBSITE FOR THE MOST CURRENT INFORMATION. 2. HOLE IN MEMBRANE SHOULD EXTEND A MINIMUM OF 1/2"(13mm) BEYOND CLAMPING RING AND SHOULD NOT BE SMALLER THAN THE DIAMETER OF THE LEADER PIPE. 3. INSULATION ADJACENT TO DRAIN TO BE APPROPRIATE FIRESTONE INSULATION WITH APPROPRIATE BONDING SURFACE. 4. FIRESTONE WATERBLOCK MIN. OF 1/2 OF 10 OZ (295ML) TUBE PER 4" DRAIN. USE ADDI9TIONAL WATERBLOCK FOR LARGER DRAINS. 5. IN REROOF APPLICATIONS: • REMOVE EXISTING FLASHING DOWN TO METAL BOWL. • REPAIR OR REPLACE BROKEN DRAIN COMPONENTS. • DRILL AND TAB BROKEN DRAIN BOLTS AND REPLACE IF NECESSARY. SUMP AREA FIELD SEAM REQUIREMENTS: A. IF SEAM EDGE IS WITHIN 9" (229MM) OF DRAIN COMPRESSION RING, EPDM TARGET PATCH REQUIRED. B. IF FIELD SEAM EDGE IS WITHIN 9" (229mm) TO 18" (457mm) OF DRAIN COMPRESSION RING, INSTALL A LAYER OF 5" QUICKSEAM FLASHING CENTERED OVER SEAM EDGE. 5" QUICKSEAM FLASHING SHALL EXTEND 3" (76mm) MIN. BEYOND EDGE OF SUMP. MEMBRAND SLOPE LIMITS: A. MAXIMUM SLOPE FOR MAX MEMBRANE SHALL BE 2" (51mm) -12" (305mm) REFER TO DETAIL D-4 WHEN SLOPE EXCEEDS LIMITATIONS. B. MAXIMUM SLOPE FOR STANDARD MEMBRANE SHALL BE 6" (162mm) -12" (305mm). CURB 6'-0" MAX. EQ EQ 1' - 9"1' - 9"3' - 6"1' - 0"1' - 7"60 MIL. EPDM 1/2" DENSDECK 6" MIN. TAPERED RIGID INSUL. ROOF DECKING, SEE STRUCT. EPDM BOOT TS 2"x2" POST (BLACK) CL CL CL 2"x2" ANGLE SUPPORT WELD TO T.S. POST SEE ROOF PLAN VERTICAL 2"x2" ANGLE SUPPORT WELD TO HORIZ. 2"x2" ANGLE SUPPORTS PROVIDE CAP & CORNERS AS REQ'D W/ SIDING 24 GA. CORRUGATED METAL SIDING (DARK GRAY) STATUS: JOB NO.: CHECKED: DRAWN: Copyright © 2022 04/12/2022 BLOCK 2, LOT 10, NELSON MEADOWS SUBDIVISION,BOZEMAN, MTMH JDS 20-046 BID SET A2.1BIG SKY BENEFITSOLUTIONSROOF PLAN 3/16" = 1'-0"A2.1 1 ROOF PLAN 6" = 1'-0"A2.1 2 ROOF DRAIN 1/2" = 1'-0"A2.1 3 RTU SCREEN REVISION SCHEDULENO:DESCRIPTION:DATE:BY:1C.O.B. REVISIONS07/13/22AS1 1