Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
015 A1.0 SITE PLAN
REFDWNELSON ROAD11 5SNOW STORAGESNOW STORAGE1' NO ACCESS STRIPLOT 9 & 10SHARED ACCESSEASEMENT30' PUBLIC ACCESS ANDUTILITY EASEMENT30'-0"435.90'S89°59'43W189.34'N00°00'04"E 189.50' S20°00'58"W OTHER BLOCK FRONTAGE TRASH ENCLOSURE W/8 CU. YD. DUMPSTERVISION TRIANGLEBIKE PARKING,SEE DETAIL 2/A1.185,115 S.F. BSBSOFFICE BUILDING 11089PATIO18'-0"7'-0"26'-0"HAMMER HEADPHASE 1PARKING CALCULATIONS PHASE 1OFFICE 5,115 S.F.(TOTAL OFFICE) 5,115 x .85 = 4347.8. / 250 = 18 spaces requiredTOTAL REQUIRED.............................18 spacesTOTAL PROVIDED.............................18 spacesBICYCLE PARKING CALCULATIONSREQ'D PARKINGREMARKS10% OF TOTAL PARKING2 SPACES REQUIRED2 SPACES PROVIDEDPHASE 1PHASE 2PHASE 1 PHASE 2 VAN ACCESSIBLEADA SPACESNOW STORAGEBENCH, SEEDETAIL 5/A1013'-0"SETBACK10'-0"EASEMENT3'-0" SETBACK 10'-0" EASEMENT 3'-0"SETBACK10'-0"EASEMENT 10'-0"SETBACK10'-0"EASEMENT1'-0"BLOCK 2, LOT 10NELSON MEADOWS1.88 ACRESMAILBOXESSLEEVE UNDER PARKINGFOR FUTURE PARKING LOTLIGHTING IF REQ'DGAS & ELECTRICALMETERSLANDSCAPE SCREENINGAT METERSEASEMENTPHASE 1PHASE 2PHASE 2 PHASE 1SNOW STORAGE4LOCATION OF FUTURE PHASE 2 TRASH ENCLOSURE1" = 20'SITE PLANAA2.04'-0"CLEAR