Loading...
HomeMy WebLinkAbout015 A1.0 SITE PLANREFDWNELSON ROAD11 5SNOW STORAGESNOW STORAGE1' NO ACCESS STRIPLOT 9 & 10SHARED ACCESSEASEMENT30' PUBLIC ACCESS ANDUTILITY EASEMENT30'-0"435.90'S89°59'43W189.34'N00°00'04"E 189.50' S20°00'58"W OTHER BLOCK FRONTAGE TRASH ENCLOSURE W/8 CU. YD. DUMPSTERVISION TRIANGLEBIKE PARKING,SEE DETAIL 2/A1.185,115 S.F. BSBSOFFICE BUILDING 11089PATIO18'-0"7'-0"26'-0"HAMMER HEADPHASE 1PARKING CALCULATIONS PHASE 1OFFICE 5,115 S.F.(TOTAL OFFICE) 5,115 x .85 = 4347.8. / 250 = 18 spaces requiredTOTAL REQUIRED.............................18 spacesTOTAL PROVIDED.............................18 spacesBICYCLE PARKING CALCULATIONSREQ'D PARKINGREMARKS10% OF TOTAL PARKING2 SPACES REQUIRED2 SPACES PROVIDEDPHASE 1PHASE 2PHASE 1 PHASE 2 VAN ACCESSIBLEADA SPACESNOW STORAGEBENCH, SEEDETAIL 5/A1013'-0"SETBACK10'-0"EASEMENT3'-0" SETBACK 10'-0" EASEMENT 3'-0"SETBACK10'-0"EASEMENT 10'-0"SETBACK10'-0"EASEMENT1'-0"BLOCK 2, LOT 10NELSON MEADOWS1.88 ACRESMAILBOXESSLEEVE UNDER PARKINGFOR FUTURE PARKING LOTLIGHTING IF REQ'DGAS & ELECTRICALMETERSLANDSCAPE SCREENINGAT METERSEASEMENTPHASE 1PHASE 2PHASE 2 PHASE 1SNOW STORAGE4LOCATION OF FUTURE PHASE 2 TRASH ENCLOSURE1" = 20'SITE PLANAA2.04'-0"CLEAR