HomeMy WebLinkAbout038_E1.3 Master Electrical Site PlanRangeS1
S1
S1
S1
S2
S2
S3
S3
S3
S3
S4
S4
S3 S3
S5
S5
S6
S7
S7
S7
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
W1W1
W1W1
MSWB
W2
W2
W1W1W1
W1
W2
W2
W2
W2
W1W1
W1
W3 W3 W3
W3W3W3
W2
W2
W1
W1W1
W2
W2
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1C1C1C1
UTILITY
TRANSFORMER
1
ACE JOB 21BZ539412 N. BROADWAYSECOND FLOORBELGRADE, MT 59714406-388-3320COPYRIGHT 2019
11/29/2021 1:49:24 PME1.3
SITE PLAN REVIEW
1811TRINITY CHURCH MASTER ELECTRICAL SITE PLANN
1" = 30'-0"E1.3
1 MASTER ELECTRICAL SITE PLAN
ELECTRICAL KEYNOTES
1 PROVIDE CONNECTION TO BACK-LIT MONUMENT SIGN.
ELECTRICAL SITE GENERAL NOTES
A NOT ALL UTILITIES AND SITE BASED ITEMS ARE SHOWN ON THE DRAWING. EC SHALL
REVIEW A FULL SET OF THE CONSTRUCTION DOCUMENTS, WHICH INCLUDES CIVIL FOR
ADDITIONAL SITE BASED ITEMS THAT MAY IMPACT EC WORK.
B ELECTRICAL CONTRACTOR SHALL COORDINATE WITH CIVIL AND GENERAL
CONTRACTORS FOR ROUTING AND TRENCHING
ISSUE DATE DESCRIP.MINISTRY CENTER701 North Ferguson Ave. Bozeman, MT 59718