HomeMy WebLinkAbout034_A2.1 Renderings & Transparency48" 48"
TRANSPARENCY CALCULATION:
- Total SF between 4'-0" and 8'-0" = 306 SF
- SF of Glazing between 4'-0" and 8'-0" = 86 SF
Required Transparency for Landscape Frontage: 25%
Percent Transparency Provided = 28.10%
LANDSCAPE BLOCK FRONTAGE
WILLIAM A.
HANSON
1898
FOETATS MONT
A
N
AEMANZOB
T A N ANOM
A R C H IT ECTDES
N
ECIL
COPYRIGHT 2019
11/9/2022 1:00:22 PMA2.2
BID/PERMIT SET
10.31.2022
1811TRINITY CHURCHMINISTRY CENTER701 North Ferguson Ave. Bozeman, MT 59718RENDERINGS & TRANSPARENCY1/8" = 1'-0"A2.2
3 01-EAST ELEVATION_PHASE 1_TRANSPARENCY
PHASE ONE
PHASE ONE: VIEW FROM NW
TOWARDS YOUTH CENTER
PHASE ONE: VIEW FROM NE
TOWARDS STAFF ENTRY
PHASE ONE: VIEW FROM
NORTH TOWARDS MAIN ENTRY
PERSPECTIVE VIEWS
PLEASE NOTE: RENDERINGS ARE TO SCHEMATIC. DESIGN HAS
EVOLVED SINCE COLORED RENDERINGS. PLEASE REFER TO
EXTERIOR ELEVATIONS AND PERSPECTIVES ON A2.3.
ISSUE DATE DESCRIP.