Loading...
HomeMy WebLinkAbout034_A2.1 Renderings & Transparency48" 48" TRANSPARENCY CALCULATION: - Total SF between 4'-0" and 8'-0" = 306 SF - SF of Glazing between 4'-0" and 8'-0" = 86 SF Required Transparency for Landscape Frontage: 25% Percent Transparency Provided = 28.10% LANDSCAPE BLOCK FRONTAGE WILLIAM A. HANSON 1898 FOETATS MONT A N AEMANZOB T A N ANOM A R C H IT ECTDES N ECIL COPYRIGHT 2019 11/9/2022 1:00:22 PMA2.2 BID/PERMIT SET 10.31.2022 1811TRINITY CHURCHMINISTRY CENTER701 North Ferguson Ave. Bozeman, MT 59718RENDERINGS & TRANSPARENCY1/8" = 1'-0"A2.2 3 01-EAST ELEVATION_PHASE 1_TRANSPARENCY PHASE ONE PHASE ONE: VIEW FROM NW TOWARDS YOUTH CENTER PHASE ONE: VIEW FROM NE TOWARDS STAFF ENTRY PHASE ONE: VIEW FROM NORTH TOWARDS MAIN ENTRY PERSPECTIVE VIEWS PLEASE NOTE: RENDERINGS ARE TO SCHEMATIC. DESIGN HAS EVOLVED SINCE COLORED RENDERINGS. PLEASE REFER TO EXTERIOR ELEVATIONS AND PERSPECTIVES ON A2.3. ISSUE DATE DESCRIP.