Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
033_A2.0 Phase 1 Exterior Elevations
FIRST FLOOR 100' -0" FLAT ROOF BRG 111' -0" CUSTOM STEEL TRUSS FDC PRE-FINISHED METAL FASCIA - MATTE BLACK, TYP. B AEDCB.3IGHF MP-1 4 A3.0 1 A3.0 MRP-1 8" / 12"SV-1SV-1 3 A3.0 2 A3.0 SF.3 118B MP-1 8" x 48" CORDOVA STONE SILL W/ CHAMFER TOP, GROUND FACE, TYP. (ALABASTER) 2 A3.2 3 A3.2 TRUSS BEARING 112' -0" T.O. WALL 114' -0" A3.2 5 PRE-FINISHED METAL ROOF PANEL (MRP-1) PRE-FINISHED METAL WALL PANEL (MP-1) STONE VENEER (SV-1) 8" STEEL CHANNEL HEADER, PAINT A ABBAAAA SF.1 100A RE: ELECT.7' - 6"EQEQ EQEQ8" / 12"SV-1 MASONRY VENEER (M-2) MASONRY VENEER (M-1) PRE-FINISHED METAL GUTTER & DOWNSPOUT W/ CONCRETE SPLASH BLOCK, TYP. ROOF OVERFLOW OUTLET; RE: PLUMBING GAS CONNECTION; RE: MECHANICAL M-2 M-1 10" 12" ASPHALT ROOF SHINGLES CJ CJ CJ CJ CJ CJ CJ CJ CJ RE: LANDSCAPE FOR SCREENING MECHANCIAL DUCTS CENTER BETWEEN WINDOWS, RE: MECH. 133' - 10" FIRST FLOOR 100' -0" FLAT ROOF BRG 111' -0" BA EDCB.3 IGHF MRP-1 4 A3.0 1 A3.0 8" / 12"MP-1 3 A3.0 EQUIP PLATFORM 112' -0" 2 A3.0 SF.3 SF.4 2 A3.7 MP-1 M-1 M-2 8" CORDOVA STONE SILL W/ CHAMFER TOP, GROUND FACE, TYP. (ALABASTER) 2 A3.2 3 A3.2 TRUSS BEARING 112' -0" T.O. WALL 114' -0" 1' - 0"1' - 0" A 123B C 112B A A A PRE-FINISHED MECHANICAL LOUVER, RE: MECH.8" / 12"MECHANICAL SCREEN WALL (MP-1)RE: ELECTRICAL7' - 6"RE: ELECTRICAL7' - 6"EQEQ PRE-FINISHED METAL FASCIA -MATTE BLACK, TYP. PRE-FINISHED METAL WALL PANEL (MP-1) STONE VENEER (SV-1) 8" STEEL CHANNEL HEADER, PAINT ASPHALT ROOF SHINGLES PRE-FINISHED METAL GUTTER & DOWNSPOUT WITH CONCRETE SPLASH-BLOCK, TYP. MASONRY VENEER (M-2) MASONRY VENEER (M-1) PRE-FINISHED METAL ROOF PANEL (MRP-1) MP-1 ROOF OVERFLOW OUTLET; RE: PLUMBING STEEL CANOPY, PAINT, RE: STRUCTURAL CJ CJ CJ CJ CJ CJ 5' - 0" MECHANCIAL EXHAUST DUCTS; RE: MECHANCIAL MECHANCIAL EXHAUST DUCTS; RE: MECHANCIAL 133' - 10" WILLIAM A. HANSON 1898 FOETATS MONT A N AEMANZOB T A N ANOM A R C H IT ECTDES N ECIL COPYRIGHT 2019 11/9/2022 1:00:15 PMA2.0 BID/PERMIT SET 10.31.2022 1811TRINITY CHURCHMINISTRY CENTER701 North Ferguson Ave. Bozeman, MT 59718EXTERIOR ELEVATIONS1/8" = 1'-0"A2.0 1 01-NORTH ELEVATION 1/8" = 1'-0"A2.0 2 01-SOUTH ELEVATION ISSUE DATE DESCRIP.