Loading...
HomeMy WebLinkAbout032_A1.2 First Floor Plan - Phase1&2Range 270 SF SUPPORT 270 SF SUPPORT 2555 SF FELLOWSHIP 534 SF KITCHEN 492 SF NURSERY 586 SF TODDLER RM 161 SF STORAGE 183 SF RR 165 SF RR 106 SF JAN. 100 SF PANTRY 195 SF T&C STOR. 637 SF LARGE CLASSROOM 920 SF ADULT CLASSROOM 919 SF ADULT CLASSROOM 99 SF STOR. 398 SF CLASSROOM 427 SF CLASSROOM 427 SF CLASSROOM 430 SF CLASSROOM 430 SF CLASSROOM 398 SF CLASSROOM 114 SF STOR. 61 SF RR CHILD CHECK-IN COFFEE & TREATS 519 SF LARGE CLASSROOM 165 SF RR 167 SF RRUTILITY YARDFELLOWSHIP PATIO LANDSCAPE AREA MAIN ENTRY MAIN ENTRY CLASSROOM ENTRY A-3 1:20 NET 22 OCC. A-3 1:20 NET 22 OCC. A-3 1:20 NET 22 OCC. A-3 1:20 NET 22 OCC. A-3 1:20 NET 20 OCC. A-3 1:20 NET 20 OCC. A-3 1:20 NET 46 OCC. A-3 1:20 NET 46 OCC. A-3 1:20 NET 27 OCC. A-3 1:20 NET 32 OCC. A-3 1:15 NET 171 OCC. A-3 1:20 NET 30 OCC. A-3 1:20 NET 25 OCC. A-3 1 per 18" Pew Legth 648 OCC. 7915 SF SANCTUARY 2729 SF ENTRY FOYER 200 SF VEST. 200 SF VEST. 76 SF JAN. EMERGENCY EXIT EMERGENCY EXIT SECONDARY ENTRY SECURE DOOR FOR AFTERHOURS CLASSROOM "WING" USE CHURCH Parking Req. = 1 Stall per 6 people of Max. Occ. Load Main Assembly Space: 648 Occupants Fellowship Hall: 171 Occupants All Classrooms: 334 Occupants MAX OCCUPANT LOAD = 1,153 Occupants PHASE ONE MAIN ENTRY STAFF ENTRY Per UDO Section 38.350.050 Subsection D, places of public assembly in Churches may exceed height limitations provided that: 1.) The portion that exceeds the height limit is limited to 10% total footprint and 2.) For each 1'-0" by which the height of such building exceeds the maximum height (40'-0"), it's side and rear setbacks must be increased by an additional 1'-0". AREA ABOVE 40'-0" (OUTLINED IN RED) = 2,472 SF TOTAL BUILDING SF = 39,695 SF PERCENTAGE ABOVE 40'-0" = 6% COMMUNITY CENTER Area: 7,492 SF Gross Community Center Req'd Parking: 1:200 Required Stalls: 7,492/200 = 37.46 (38 Stalls) Area: 3,600 SF Gross Office Req'd Parking: 1:250 Required Stalls: 3,600/250 = 14.4 (15 Stalls) OFFICE BIKE RACKS WILLIAM A. HANSON 1898 FOETATS MONT A N AEMANZOB T A N ANOM A R C H IT ECTDES N ECIL COPYRIGHT 2019 12/2/2021 9:40:12 AMA1.2 Site Plan Review 12.2.21 1811TRINITY CHURCHMINISTRY CENTER701 North Ferguson Ave. Bozeman, MT 59718FIRST FLOOR PLAN_PHASE 1 & 2FIRST FLOOR PLAN - OVERALL (PHASE 1 & 2) 1/16" = 1'-0" ISSUE DATE DESCRIP.