Loading...
HomeMy WebLinkAbout021_L001 Notes Legends Code ComplianceLANDSCAPE INSTALL NOTESGENERAL1.CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL UNDERGROUND UTILITIES PRIOR TO BEGINNINGWORK. CALL 811.2.PLACE TREES, SHRUBS, AND PLANT MATERIAL WITH LANDSCAPE ARCHITECT PRESENT. LANDSCAPE ARCHITECT TO BENOTIFIED 48 HOURS IN ADVANCE.3.PLACE ALL BOULDERS WITH LANDSCAPE ARCHITECT PRESENT.LANDSCAPE ARCHITECT TO BE NOTIFIED 48 HOURS INADVANCE.4.THE LOCATION OF ALL FLAGSTONE, STEPS, AND PATIO AREAS SHALL BE COORDINATED ON SITE WITH THE LANDSCAPEARCHITECT, WHEN APPLICABLE.5.ALL PLANT MATERIAL SHALL CONFORM TO THE CURRENT AMERICAN STANDARD FOR NURSERY STOCK.6.VERIFY ALL QUANTITIES. ILLUSTRATED PLAN SHALL DICTATE COUNT.7.NO SUBSTITUTIONS WILL BE ALLOWED WITHOUT THE WRITTEN CONSENT OF THE LANDSCAPE ARCHITECT. ALL REQUESTSSHOULD BE SUBMITTED TO DESIGN 5 LANDSCAPE ARCHITECTURE. 406-587-4873 OR TROY@DESIGN5LA.COM.8.LANDSCAPE ARCHITECT SHALL MEET WITH LANDSCAPE CONTRACTOR ON SITE, AT PREDETERMINED INTERVALS TODISCUSS PROGRESS, QUESTIONS, AND PRODUCT PLACEMENT.9.ALL EDGING SHALL BE 316" X 4" NATURAL STEEL ON STRAIGHT RUNS AND 18" X 4" NATURAL STEEL FOR CURVED RUNS (OR ASOTHERWISE SPECIFIED IN DETAILS). TAC WELD TO #4 REBAR DRIVEN A MINIMUM OF 18" DEEP.10.ALL AREAS ON SITE DISTURBED BY CONSTRUCTION ACTIVITIES NOT INDICATED ON LANDSCAPE PLAN ARE TO BERECLAIMED AND RE-ESTABLISHED TO PRE-DISTURBANCE CONDITION, VERIFY DISTURBANCE AREAS IN FIELD. CONTRACTORIS RESPONSIBLE FOR THE COST OF RESTORING ANY DISTURBANCE OUTSIDE OF THE AGREED UPON LIMIT OF WORKBOUNDARY INDICATED ON THE PLANS.SITE SOIL PREP11.ALL BACKFILLED AND DISTURBED AREAS TO BE RAKED SMOOTH. ALL ROCKS GREATER THAN 3" DIAMETER AND ALLCONSTRUCTION DEBRIS TO BE PICKED UP AND REMOVED FROM SITE BEFORE SOIL AMENDMENTS ARE ADDED.12.SEED AREAS(WHEN APPLICABLE)- LIGHTLY SCARIFY SURFACE OR LIGHTLY TILL AND RAKE SMOOTH PRIOR TO ADDING SOIL.-SEEDED AREA AMENDED TOPSOIL: MIX 1" COMPOST WITH MIN. 3" NEW TOPSOIL (COMBINED SETTLED DEPTH OF 4").HYDROSEED WITH *FLEXTERRA TACKIFIER*. ADD EROSION CONTROL MAT TO ALL AREAS WITH SLOPES STEEPER THAN 3:113. SOD AREAS(WHEN APPLICABLE) - LIGHTLY SCARIFY SURFACE OR LIGHTLY TILL AND RAKE SMOOTH PRIOR TO ADDINGSOIL.-SOD AREA AMENDED SOIL: MIX 1" COMPOST WITH MIN. 5" NEW TOPSOIL (COMBINED SETTLED DEPTH OF 6"). TOPSOILSHALL BE DRUM ROLLED OR TRACK-PACKED AND GRADED SMOOTHLY AND EVENLY PRIOR TO LAYING SOD. RAKE SMOOTHTO MATCH FINAL GRADING PLAN.14. ALL PLANTING BEDS TO BE EXCAVATED 18" DEEP. SCARIFY SIDES AND BOTTOM TO REMOVE GLAZING.15. ALL PLANTING BEDS TO RECEIVE NEW, AMENDED SOIL: MIX 1" COMPOST WITH MIN. 17" NEW TOPSOIL(COMBINED SETTLEDDEPTH OF 18"). RAKE SMOOTH TO MATCH FINAL GRADING PLAN.IRRIGATION16. PERMANENT UNDERGROUND IRRIGATION SYSTEM TO BE INSTALLED AT TIME OF LANDSCAPE INSTALLATION. MAIN LINE, LATERAL LINE, AND SPRINKLERS NOT BURIED AT TIME OF PROJECT COMPLETION WILL NOT BEACCEPTED.17. IRRIGATION TO BE INSTALLED IN ACCORDANCE WITH ALL STATE AND LOCAL CODES AND ORDINANCES.8'8'TREESSHRUBSSYMBOLBOTANICAL NAMESIZETYPESPACINGQUANTITYCOMMON NAMEPLANT SCHEDULE - BUILDING & PARKING LOTPERENNIALS & GRASSES*** DROUGHT TOLERANT SPECIESMATUREHEIGHTMATURESPREADPOPULUS TREMULOIDESQUAKING ASPEN- SINGLE STEM1.5" CALB & BPER PLAN220' - 50'10' - 20'PHYSOCARPUS OPULIFOLIUS***NINEBARK5 GALPOTPER PLAN64' - 6'4' - 6'RIBES ALPINUM***ALPINE CURRANT5 GALPOTPER PLAN2410'3' - 6'SPIREA BETULIFOLIA 'TOR'***BIRCHLEAF SPIREA5 GALPOTPER PLAN583'-5'3'-5'OTHERTURF GRASS SEED MIX, SEE SEED SCHEDULE: SHEET L000SEED27,475 SFGLEDESTIA TRIACANTHOS INERMIS*** THORNLESS HONEYLOCUST1.5" CALB & BPER PLAN435'-45''10' - 30'AMELANCHIER X GRANDIFLORA 'PRINCESS DIANA'***PRINCESS DIANA APPLE SERVICEBERRY1.5" CALB & BPER PLAN915' - 20'12' - 15'ACER PLATANOIDES 'EMERALD QUEEN'***EMERALD QUEEN NORWAY MAPLE1.5" CALB & BPER PLAN1040' - 50'35' - 45'CALAMAGROSTIS X ACUTIFLORA 'EL DORADO'EL DORADO FEATHER REED GRASS1 GALPOTPER PLAN704'-5'2'ARTEMISIA LUDOVICIANA 'SILVER KING'***SILVER KING WHITE SAGE1 GALPOTPER PLAN262'-3'2' - 3'SPOROBOLUS HETEROLEPIS***PRAIRIE DROPSEED1 GALPOTPER PLAN432'-3'2' - 3'ECHINACEA PURPUREA***PURPLE CONEFLOWER1 GALPOTPER PLAN102'-5'2'SALVIA NEMOROSA 'CARADONNA'***CARADONNA PERENNIAL SAGE1 GALPOTPER PLAN241'-2'1'-2'NATIVE UPLAND SEED MIX, SEE SEED SCHEDULE: SHEET L000PER PLANPER PLAN42,527 SFBOUTELOUA GRACILIS 'BLONDE AMBITION'***BLONDE AMBITION BLUE GRAMA1 GALPOTPER PLAN373'3'TILIA CORDATA***LITTLELEAF LINDEN1.5" CALB & BPER PLAN660'-80'35'-40'ULMUS 'MORTON' ACCOLADE***ACCOLADE ELM1.5" CALB & BPER PLAN150'-60'35'-40'NATIVE WATERCOURSE SEED MIX, SEE SEEDSCHEDULE: SHEET L000PER PLAN13,084 SFSEEDSEEDBETULA NIGRARIVER BIRCH1.5" CALB & BPER PLAN310'-30'10' - 15'PICEA GLAUCA 'DENSATA'BLACK HILLS SPRUCE8'HEIGHTB & BPER PLAN120'-40'10' - 15'PICEA PUNGENS***COLORADO SPRUCE130'-80'10' - 20'8'HEIGHTB & BPER PLANSALIX GYERIANAGEYER WILLOW5 GALPOTPER PLAN36'-12'6'-8'CORNUS SERICEA***RED OSIER DOGWOOD5 GALPOTPER PLAN66'-9'6'-10'PRUNUS VIRGINIANA ***NATIVE CHOKECHERRY5 GALPOTPER PLAN615'8'DESCHAMPSIA CESPITOSATUFTED HAIRGRASS1 GALPOTPER PLAN213'-4'2'-3'LONICERA XYLOSTEUM***DWARF HONEYSUCKLE5 GALPOTPER PLAN134' - 6'4' - 6'BOZEMAN, MONTANA CODE OF ORDINANCESSETBACK LANDSCAPING-REQUIRED AND PROVIDED: ALL FRONT, SIDE, AND REAR SETBACKS MUST BELANDSCAPEDDROUGHT TOLERANT SPECIES-REQUIRED: A LANDSCAPE PLAN MUST PROVIDE 75% OF GREATER OF THE PROPOSEDTREES AND SHRUBS AS DROUGHT TOLERANT SPECIES.-PROVIDED: THE OVERALL LANDSCAPE PLAN ON SHEET L300 PROVIDES 85% OF THEPROPOSED TREES AND SHRUBS AS DROUGHT TOLERANT SPECIES FOR PLANTINGSON SITE. SEE SHEET L001 FOR PLANT SCHEDULES THAT IDENTIFY ALL PROPOSEDDROUGHT TOLERANT TREES AND SHRUBS.STORMWATER POND LANDSCAPING-REQUIRED & PROVIDED: ALL STORMWATER RETENTION/DETENTION FACILITIES AREDESIGNED AS LANDSCAPE AMENITIES. AT LEAST 75% OF THE SURFACE AREAS ARECOVERED WITH LIVE VEGETATION AND GROUPINGS OF BOULDERS ARE INCLUDED TOCREATE A FUNCTIONAL, YET NATURAL SITE FEATURE.SERVICE ENCLOSURES LANDSCAPING-REQUIRED & PROVIDED: LANDSCAPE SCREENING IS PROVIDEDSTREET FRONTAGE LANDSCAPINGSTREET FRONTAGE FOR FERGUSON AVENUE: 555.00 LF (106.07 NEAR UTILITYINFRASTRUCTURE) = 9 TREESSTREET FRONTAGE FOR DURSTON ROAD: 537.74 LF (155.94 NEAR UTILITYINSTRASTRUCTURE = 8 TREESSTREET FRONTAGE FOR EAST/WEST PEDESTRIAN TRAIL: 1,240 LF = 25 TREES-REQUIRED: ONE LARGE CANOPY TREE FOR EACH 50 FEET OF TOTAL STREETFRONTAGE ROUNDED TO THE NEAREST WHOLE NUMBER.-PROVIDED:--10 TREES FOR FERGUSON AVENUE--8 TREES FOR DURSTON ROAD--25 TREES FOR EAST/WEST PEDESTRIAN TRAILPARKING LOT LANDSCAPING-REQUIRED AND PROVIDED:ALL PARKING LOTS LOCATED BETWEEN A PRINCIPALSTRUCTURE AND A PUBLIC STREET, MUST BE SCREENED FROM THE PUBLIC STREET.SCREENING MUST BE CONTINUOUS AND NOT LESS THAN FOUR FEET IN WIDTH.SCREENING MUST BE MAINTAINED AT A HEIGHT OF FOUR TO SIX FEET-REQUIRED:--A) ONE LARGE CANOPY TREE; OR B) ONE LARGE NON-CANOPY TREE AND ONESMALL TREE; OR C) THREE SMALL TREES FOR EACH NINE PARKING SPACESREQUIRED OR PROVIDED--TREES MUST BE IN OR WITHIN 20 FEET OF THE PARKING LOT--NO PARKING SPACE SHALL BE LOCATED MORE THAN 70 FEET FROM THE TRUNKOF A TREE--NO TREE SHALL BE PLANTED CLOSER THAN THREE FEET TO THE BACK OF THECURB OR EDGING EQUIVALENT2 DISABLED ACCESSIBLE PARKING SPACES + 50 PARKING SPACES =52 TOTAL PARKING SPACES IN PARKING LOT52 ÷ 9 = 6 OF A) B) AND / OR C) LISTED ABOVE-PROVIDED:--3 LARGE CANOPY TREES, 0 LARGE NON-CANOPY TREES AND 9 SMALL TREES IN /WITHIN 20 FEET OF THE PARKING LOT (10 OF A) B) AND / OR C) LISTED ABOVE)--ALL PARKING SPACES ARE LOCATED WITHIN 70 FEET OF THE TRUNK OF A TREE-REQUIRED: ANY PARKING LOT PROVIDING 15 OR MORE PARKING SPACES MUST HAVE AMINIMUM OF 20 SQUARE FEET OF LANDSCAPE AREA WITHIN THE PARKING LOT FOREACH OFF-STREET PARKING SPACE IN THE LOT52 X 20 = 1,040 SQUARE FEET OF LANDSCAPE AREA WITHIN THE PARKING LOT-PROVIDED: 2,506 FT² OF LANDSCAPING WITHIN THE PARKING LOT PROVIDEDBICYCLE PARKING-REQUIRED: MINIMUM OF 10% BIKE PARKING TO BE PROVIDED FOR AMOUNT OFVEHICLE PARKING STALLS (52 VEHICLE STALLS X 10% = 5 PARKING SPACES)-PROVIDED: 3 BICYCLE RACKS = 6 BICYCLE PARKING SPOTSUTILITY METERS LANDSCAPING-REQUIRED AND PROVIDED: IF SUCH ELEMENTS ARE MOUNTED IN A LOCATION VISIBLEFROM THE STREET, PEDESTRIAN PATHWAY, SHARED OPEN SPACE, OR SHARED AUTOCOURTYARDS, THEY MUST BE SCREENED WITH VEGETATION AND / OR INTEGRATEDINTO THE BUILDING'S ARCHITECTURECOMMERICAL OPEN SPACE-REQUIRED AND PROVIDED: PROJECT IS EXEMPT FROM ALL COMMERCIAL OPEN SPACEREQUIREMENTS.WATERCOURSE SETBACK LANDSCAPING-REQUIRED & PROVIDED ZONE 1: ZONE 1 MUST BE PLANTED WITH NEW OR EXISTINGNATIVE MATERIALS. ONE HUNDRED PERCENT OF THE DISTURBED AREAS OF ZONE 1MUST BE PLANTED WITH A GROUND COVER OF NATIVE RIPARIAN SEDGES, FORBS ANDGRASSES SUITED FOR THE AREA. IN ADDITION, A MINIMUM OF ONE SHRUB FOR EVERYTEN LINEAR FEET AND ONE TREE FOR EVERY 30 LINEAR FEET OF THE WATERCOURSEIS REQUIRED.--TOTAL LINEAR FEET OF ZONE 1 WATERCOURSE SETBACK = 25.07 LF--REQUIRED & PROVIDED: 3 TOTAL SHRUBS, 1 TOTAL TREES-REQUIRED & PROVIDED ZONE 2: DISTURBED AREAS OF ZONE 2 MUST BE PLANTEDWITH NEW OR EXISTING NATIVE GRASSES SUITED FOR THE AREA.SYMBOLDESCRIPTIONPRODUCTQUANTITYASPHALTTRAIL10' WIDTH ASPHALT MULTI-USETRAIL, SEE SHEET L501: DETAIL 112,360 SFSITE MATERIAL SCHEDULECONCRETESIDEWALKSEE CIVILBYCIVILLANDSCAPEROCK1 12" ALL ROUND OR APPROVEDEQUAL AT 3" - 4" DEPTH; AVAILABLEFROM SCENIC CITY TRUCKING &LANDSCAPING, BELGRADE, MT406-388-77715,515 SFLANDSCAPEBOULDERS3'-5' DIAMETER FLATWILLOW ORPIPESTONE LANDSCAPEBOULDERS, SEE SHEET L500:DETAIL 918SYMBOLDESCRIPTIONPRODUCTQUANTITYASPHALTTRAIL10' WIDTH ASPHALT MULTI-USETRAIL, SEE SHEET L501: DETAIL 112,360 SFSITE MATERIAL SCHEDULECONCRETESIDEWALKSEE CIVILBYCIVILLANDSCAPEROCK1 12" ALL ROUND OR APPROVEDEQUAL AT 3" - 4" DEPTH; AVAILABLEFROM SCENIC CITY TRUCKING &LANDSCAPING, BELGRADE, MT406-388-77715,515 SFLANDSCAPEBOULDERS3'-5' DIAMETER FLATWILLOW ORPIPESTONE LANDSCAPEBOULDERS, SEE SHEET L500:DETAIL 918SYMBOLDESCRIPTIONCONTACTPRODUCTQUANTITY6' BENCHURBANSCAPE - MODEL DE1113C, 6'CAMDEN BENCH, SURFACE MOUNTWITH HORIZONTAL SLATS;POWDERCOAT COLOR TO BESMOKE; SEE SHEET L501: DETAIL 51URBANSCAPE/WABASH VALLEY1-800-253-8619www.wabashvalley.comSITE AMENITY SCHEDULEWAYFINDINGTOTEMDIRECTIONAL TOTEM TO DISPLAYTRAIL DIRECTIONS ANDDISTANCES; SIGNAGE TO COMPLYWITH CITY OF BOZEMANWAYFINDING STANDARDS; SEESHEET L501: DETAIL 22BY OWNERPEDESTRIANBRIDGEPREFABRICATED PEDESTRIANTRUSS BRIDGE; 8' WIDTH X 20'LENGTH WITH 42" RAILING;WEATHERING STEEL TRUSS &CONCRETE DECK; DESIGN TOCOMPLY WITH CITY OF BOZEMANUNIFIED DEVELOPMENT CODE; SEESHEET L501: DETAIL 620' SPAN8' WIDTH(OR APPROVED EQUAL)TRUE NORTH STEELBO DERHEIMMISSOULA, MT406-532-7103bo.derheim@truenorthsteel.comASPHALTBASKETBALL& GAGA BALLCOURT80'x42' ASPHALT SURFACING ANDWHITE STRIPING; SEE SHEETL501: DETAIL 33,360SFBY CONTRACTORBIKERACKBIKE RIB 2.0 POWDER COATEDBLACK FINISH, SURFACE MOUNTED;SEE SHEET L501: DETAIL 43BIKERACK.COM1.520.322.9626www.bikerack.comLANDSCAPEEDGING316" X 4" ALUMINUM EDGING;SEE SHEET L500: DETAIL 6496 LFBY CONTRACTORPERPLANSYMBOLDESCRIPTIONCONTACTPRODUCTQUANTITY6' BENCHURBANSCAPE - MODEL DE1113C, 6'CAMDEN BENCH, SURFACE MOUNTWITH HORIZONTAL SLATS;POWDERCOAT COLOR TO BESMOKE; SEE SHEET L501: DETAIL 51URBANSCAPE/WABASH VALLEY1-800-253-8619www.wabashvalley.comSITE AMENITY SCHEDULEWAYFINDINGTOTEMDIRECTIONAL TOTEM TO DISPLAYTRAIL DIRECTIONS ANDDISTANCES; SIGNAGE TO COMPLYWITH CITY OF BOZEMANWAYFINDING STANDARDS; SEESHEET L501: DETAIL 22BY OWNERPEDESTRIANBRIDGEPREFABRICATED PEDESTRIANTRUSS BRIDGE; 8' WIDTH X 20'LENGTH WITH 42" RAILING;WEATHERING STEEL TRUSS &CONCRETE DECK; DESIGN TOCOMPLY WITH CITY OF BOZEMANUNIFIED DEVELOPMENT CODE; SEESHEET L501: DETAIL 620' SPAN8' WIDTH(OR APPROVED EQUAL)TRUE NORTH STEELBO DERHEIMMISSOULA, MT406-532-7103bo.derheim@truenorthsteel.comASPHALTBASKETBALL& GAGA BALLCOURT80'x42' ASPHALT SURFACING ANDWHITE STRIPING; SEE SHEETL501: DETAIL 33,360SFBY CONTRACTORBIKERACKBIKE RIB 2.0 POWDER COATEDBLACK FINISH, SURFACE MOUNTED;SEE SHEET L501: DETAIL 43BIKERACK.COM1.520.322.9626www.bikerack.comLANDSCAPEEDGING316" X 4" ALUMINUM EDGING;SEE SHEET L500: DETAIL 6496 LFBY CONTRACTORPERPLANdesign5la.com406.587.4873dateissuedrawn by:checked by:filename:z:\trinity church\autocad\01_sheets\l000_trinity-church_d5_landscape.dwg Trinity Church Ministry Center Bozeman, Montana KHM/HU TMS 06/16/21COB InformalReview12/01/21SP106/10/22310/404 Permit10/18/22Draft Bid/Permit Set10/31/22Bid/Permit SetNotes, Legends,& CodeComplianceL 001110/18/22