HomeMy WebLinkAbout018_C4.1 Drainage DetailsNOTESNOTESNOTESNOTESTYPICAL LANDSCAPEDRYWELL DETAILNOTESGENERAL STORMWATER SYSTEM NOTESNOTESRETENTION BASIN DETAILNOTESRETENTION BASIN OVERFLOW DETAIL1 10/13/2022 SITE PLAN SUBMITTAL ZWL CDP
2 10/31/2022 PRELIM. BID/PERMIT SET ZWL CDP PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESTRINITY CHURCH
MINISTRY CENTER
SITE PLAN
701 N FERGUSON AVE
BOZEMAN, MT 59718C4.1DRAINAGEDETAILS01.17.23 ADDENDUM #2