Loading...
HomeMy WebLinkAbout003_SD1.0 Site Plan - Phase1DI DI DI DI DI ~10:1 DIDI MH MH MH DI 5' WIDE CONCRETE BOX CULVERT INV: 2772.81 5' WIDE CONCRETE BOX CULVERT INV: 2772.89BRIDGER VIEW CONNECTION TO EXISTING TRAIL AT FLANDER'S MILL PRE-MANUFACTURED PEDESTRIAN BRIDGE; RE: LANDSCAPE SPANISH PEAKS VIEW10' WIDE ASPHALT SHARED USE PATH PAVED PEDESTRIAN BIKE TRAIL (EXISTING) BENCH; RE: LANDSCAPE CONNECTION TO TRAIL FOR TRAIL MAINTANENCE DURSTON ROAD FERGUSON AVEKimball AveFlander's Mill Subdivision Christ the King Lutheran Church ACCESS EASEMENT60' - 0"FULL ACCESS UTILITY EASEMENT 20' - 0"UTILITY EASEMENT20' - 0"9 11 6 8 VISION TRIANGLEUTILITY EASEMENT10' - 0"CTK TRAIL EASEMENT 15' - 0" Heritage Christian School EXISTING WATER MAIN EXISTING GAS LINE EXISTING COMM. FIBER LINE EXISTING COMM. CABLE LINE NEW 8" WATER LINE NEW SANITARY SEWER MANHOLE BLOW-OFF FIRE HYDRANT; RE:CIVIL 5 0 ' - 0 " 50 ' - 0 " W AT E R CO UR SE SET B AC K ELECTRICAL TRANSFORMER; RE: ELECT. JUNCTION CAN; RE: ELECT. 80' - 8" ROLLDOWN CURB 5' - 0" NEW CONCRETE SIDEWALK, CONNECT TO EXISTING 5' SIDEWALK; RE: CIVIL 8 SNOW | RETENTION COLLECTOR // LANDSCAPE BLOCK FRONTAGEMINOR ARTERIAL // LANDSCAPE BLOCK FRONTAGE EXISTING STREET LIGHTING EXISTING STREET LIGHTINGEXISTING MANHOLE AND TRAIL EASEMENT 10' - 0" UTILITY EASEMENT TRAIL EASEMENT 25' - 0" PROPOSED CROSSWALK CONNECTING TO MEADOWLARK ELEMENTARY N-S SIDEWALK; RE: CIVIL CL ALIGN CL OF ACCESS W/ DIAMOND STREET MONUMENT SIGN SITE LIGHTING; RE: ELECT. FIRE HYDRANT; RE: CIVIL LANDSCAPING EXTENTS OF PHASE 1 STORMWATER RETENTION; RE: CIVIL SNOW RETENTIONSD1.2 1 IRRIGATION WELL; RE: CIVIL 11 TOTAL: 53 STALLS 10' - 0" BB COURT GAGA BALL ROLL DOWN CURB46' - 6"15' - 0"CONCRETE PAD, ELECTRICAL/UTILITIES 5' - 0"15' - 0"6' - 0"12' - 0"5' - 0"6' - 0" 15' - 0" 7' - 0" 5' - 0"7' - 0"14' - 0"(3) BIKE RACKS PARKING CALCULATION (Section 38.540.050) CHURCH Parking Requirement = 1 Stall per six persons of maximum occupancy load (as identified in the IBC) for main assembly hall, public assembly areas and classrooms. Occupancy Load (See A0.1): Ministry Center: 312 Occupants Youth Center: 42 Occupants Stage: 20 Occupants Group Gathering: 26 Occupants Kitchen: 2 Occupants TOTAL: 402 Occupants 402 Occupants/6 = 67 Stalls Required Request a 20% reduction in parking. 67 stalls *.8 = 53.6 Stalls (53 Stalls) TOTAL PHASE ONE PARKING PROVIDED: 53 Stalls SD1.3 2 Sim GENERAL NOTES: 1. REFER TO CIVIL AND LANDSCAPE FOR ALL SITE COORDINATION/CONSTRUCTION. 2. LANDSCAPE SHOWN ON ARCHITECTURAL SITE PLAN IS DIAGRAMATIC ONLY. REFER TO LANDSCAPE. STORMWATER RETENTION; RE: CIVIL SD1.2 8 ADA PARKING SIGN20' - 0"9' - 0"SETBACK10' - 0"TRAIL EASEMENT25' - 0"SPORTS COURT; RE: LANDSCAPE UTILITY SCREEN WALL MAN HOLE; RE: CIVIL STORM MAN HOLE; RE: CIVIL GAGA BALL ENCLOSURE, OFOI DRY WELL; RE: CIVIL BASKETBALL HOOP, CFCI SD1.3 3 1 1 2 WILLIAM A. HANSON 1898 FOETATS MONT A N AEMANZOB T A N ANOM A R C H IT ECTDES N ECIL COPYRIGHT 2019 2/8/2023 9:48:35 AMSD1.0 SITE PLAN REVIEW 02.08.2023 1811TRINITY CHURCHMINISTRY CENTER701 North Ferguson Ave. Bozeman, MT 59718SITE PLAN -OVERALL1" = 40'-0"SD1.0 1 SITE PLAN_OVERALL NORTH ISSUE DATE DESCRIP. 01.17.23 ADD. #2 02.08.23 SP Review