HomeMy WebLinkAbout003_SD1.0 Site Plan - Phase1DI
DI
DI
DI
DI
~10:1
DIDI
MH
MH
MH
DI
5' WIDE
CONCRETE BOX
CULVERT
INV: 2772.81
5' WIDE
CONCRETE BOX
CULVERT
INV: 2772.89BRIDGER VIEW
CONNECTION TO EXISTING
TRAIL AT FLANDER'S MILL
PRE-MANUFACTURED
PEDESTRIAN BRIDGE;
RE: LANDSCAPE
SPANISH PEAKS VIEW10' WIDE ASPHALT
SHARED USE PATH
PAVED PEDESTRIAN BIKE TRAIL
(EXISTING)
BENCH;
RE: LANDSCAPE
CONNECTION TO TRAIL
FOR TRAIL MAINTANENCE
DURSTON ROAD FERGUSON AVEKimball AveFlander's Mill Subdivision
Christ the King
Lutheran Church ACCESS EASEMENT60' - 0"FULL
ACCESS
UTILITY EASEMENT
20' - 0"UTILITY EASEMENT20' - 0"9
11
6
8
VISION TRIANGLEUTILITY EASEMENT10' - 0"CTK TRAIL EASEMENT
15' - 0"
Heritage Christian School
EXISTING WATER MAIN
EXISTING GAS LINE
EXISTING COMM. FIBER LINE
EXISTING COMM. CABLE LINE
NEW 8" WATER LINE
NEW SANITARY SEWER
MANHOLE
BLOW-OFF FIRE
HYDRANT; RE:CIVIL
5 0 ' - 0 "
50 ' - 0 "
W AT E R CO UR SE SET B AC K
ELECTRICAL
TRANSFORMER;
RE: ELECT.
JUNCTION CAN; RE: ELECT.
80' - 8" ROLLDOWN CURB
5' - 0"
NEW CONCRETE SIDEWALK,
CONNECT TO EXISTING 5'
SIDEWALK; RE: CIVIL
8
SNOW | RETENTION
COLLECTOR // LANDSCAPE BLOCK FRONTAGEMINOR ARTERIAL // LANDSCAPE BLOCK FRONTAGE
EXISTING
STREET
LIGHTING
EXISTING
STREET
LIGHTINGEXISTING MANHOLE
AND TRAIL EASEMENT
10' - 0" UTILITY EASEMENT
TRAIL EASEMENT
25' - 0"
PROPOSED CROSSWALK CONNECTING TO
MEADOWLARK ELEMENTARY N-S SIDEWALK; RE: CIVIL
CL
ALIGN CL OF
ACCESS W/
DIAMOND
STREET
MONUMENT
SIGN
SITE LIGHTING;
RE: ELECT.
FIRE HYDRANT;
RE: CIVIL
LANDSCAPING EXTENTS OF PHASE 1
STORMWATER RETENTION; RE: CIVIL
SNOW RETENTIONSD1.2
1
IRRIGATION WELL;
RE: CIVIL
11
TOTAL: 53 STALLS
10' - 0"
BB COURT
GAGA
BALL
ROLL DOWN CURB46' - 6"15' - 0"CONCRETE PAD,
ELECTRICAL/UTILITIES 5' - 0"15' - 0"6' - 0"12' - 0"5' - 0"6' - 0"
15' - 0"
7' - 0"
5' - 0"7' - 0"14' - 0"(3) BIKE
RACKS
PARKING CALCULATION (Section 38.540.050)
CHURCH
Parking Requirement = 1 Stall per six persons of maximum
occupancy load (as identified in the IBC) for main assembly
hall, public assembly areas and classrooms.
Occupancy Load (See A0.1):
Ministry Center: 312 Occupants
Youth Center: 42 Occupants
Stage: 20 Occupants
Group Gathering: 26 Occupants
Kitchen: 2 Occupants
TOTAL: 402 Occupants
402 Occupants/6 = 67 Stalls Required
Request a 20% reduction in parking.
67 stalls *.8 = 53.6 Stalls (53 Stalls)
TOTAL PHASE ONE PARKING PROVIDED: 53 Stalls
SD1.3
2 Sim
GENERAL NOTES:
1. REFER TO CIVIL AND LANDSCAPE FOR ALL SITE
COORDINATION/CONSTRUCTION.
2. LANDSCAPE SHOWN ON ARCHITECTURAL SITE
PLAN IS DIAGRAMATIC ONLY. REFER TO LANDSCAPE.
STORMWATER RETENTION;
RE: CIVIL
SD1.2
8
ADA PARKING SIGN20' - 0"9' - 0"SETBACK10' - 0"TRAIL EASEMENT25' - 0"SPORTS COURT;
RE: LANDSCAPE
UTILITY SCREEN WALL
MAN HOLE;
RE: CIVIL
STORM MAN
HOLE; RE: CIVIL
GAGA BALL
ENCLOSURE, OFOI
DRY WELL; RE: CIVIL
BASKETBALL HOOP, CFCI
SD1.3
3
1
1
2
WILLIAM A.
HANSON
1898
FOETATS MONT
A
N
AEMANZOB
T A N ANOM
A R C H IT ECTDES
N
ECIL
COPYRIGHT 2019
2/8/2023 9:48:35 AMSD1.0
SITE PLAN REVIEW
02.08.2023
1811TRINITY CHURCHMINISTRY CENTER701 North Ferguson Ave. Bozeman, MT 59718SITE PLAN -OVERALL1" = 40'-0"SD1.0
1 SITE PLAN_OVERALL
NORTH
ISSUE DATE DESCRIP.
01.17.23 ADD. #2
02.08.23 SP Review