HomeMy WebLinkAbout025_Trinity Changemarks_ThinkOne Response
Changemarks Report
Project Name:
21469 Trinity Church Ph. 1 SP
Workflow Started:
12/02/2021 1:28 PM
Report Generated:
03/21/2022 02:03 PM
Grouping Cycle Ref # Complete? Status Department Snapshot File Markup Name Changemark
Subject Changemark Details Markup Date Updated By Applicant Response
Main Workflow 1 20 False Unresolved Planning
003_SD1.0 Site
Plan - Phase1.pdf
Jacob Miller PLNG - easements Please clarify these easements. Is it one 25'
easement or two separate easements? We will
need either one easement with signatures from
Trinity and Christ the King or two separate
easements . Coordinate with engineering
01/27/2022
3:01 PM
Jacob Miller There are two separate
Trail Easements. One
for Trinity Church and
one for Christ the King.
I have record of Trinity
Church’s Trail
Easement approved
agreement, however
Christ the King sent
their documents directly
to the City.
21 False Unresolved Planning
003_SD1.0 Site
Plan - Phase1.pdf
Jacob Miller PLNG - easements Please clarify these easements. Is it one 25'
easement or two separate easements? We will
need either one easement with signatures from
Trinity and Christ the King or two separate
easements . Coordinate with engineering
01/27/2022
3:01 PM
Jacob Miller Please see above.
18 False Unresolved Planning
001_Cover
Sheet.pdf
Jacob Miller PLNG - parking
calcs
Parking calcs do not match sheet SD1.0 01/27/2022
11:44 AM
Jacob Miller Parking Calculations
have been modified due
to Value Engineering.
Please see revised
parking calculations.
19 False Unresolved Planning
001_Cover
Sheet.pdf
Jacob Miller PLNG - usable
commercial open
space
Provide open space calculations per section
38.520.060.C.
"New developments with non-residential uses on
sites with a total site area greater than one acre
must provide open space"
01/27/2022
11:45 AM
Jacob Miller
Please see revised Site
Plans.
16 False Unresolved Planning
033_A2.0 Phase
1 Exterior
Elevations.pdf
Jacob Miller PLNG - Weather
protection
38.510.030.C - Landcaped block frontage
standards - weather protection.
Weather protection at least 3' deep must be
provided at all primary entrances
01/27/2022
11:33 AM
Jacob Miller Exterior Elevations
have been modified due
to Value Engineering.
Please see revised
Elevations.
17 False Unresolved Planning
033_A2.0 Phase
1 Exterior
Elevations.pdf
Jacob Miller PLNG - Location of
ground related
service areas and
mech. equip.
38.520.070.B.3. - The electrical equipment must
be screened with structural and landscaping
screening measures as described in subsection C
01/27/2022
11:33 AM
Jacob Miller Revised location of
Electrical Equipment
due to Value
Engineering revisions
and coordination with
Northwestern Energy.
Please see revised
Exterior Elevations and
Landscape Drawings.
West Elevation includes
structural screen wall
as well as landscape
screening per City
requirements.
Changemarks Report
14 False Unresolved Engineering
009_C1.1 Site
Plan.pdf
Eng 011222 APS Proposed
Crosswalk
The City will need to further discuss the crosswalk
with the school district, and get their input prior to
providing further guidance to the applicant. Taylor
Lonsdale, tlonsdale@BOZEMAN.NET, (406) 582-
2286 is the City’s Transportation Engineer and
main contact.
01/21/2022
11:41 AM
Alicia Paz-Solis Per conversations with
Bozeman School
District, they are in
support of a crosswalk
as designed, providing
safe access to
neighborhood schools
via the proposed
Northern Trail.
Please advise on what
documentation is
required from the
Bozeman School
District and/or City
Transportation
Engineer.
12 False Unresolved Engineering
005_Trinity
Church Informal
DRC_Design
Team
Responses.pdf
Eng 011222 APS Payback Please contact Marcy Yeykal,
myeykal@bozeman.net, (406)582-2273 for any
Payback related questions and provide geocode
of the property.
01/21/2022
12:03 PM
Alicia Paz-Solis Pay back fees have
been paid. Please see
receipt of payment in
Documents.
(017_Payback Fees
Receipt)
13 False Unresolved Engineering
005_Trinity
Church Informal
DRC_Design
Team
Responses.pdf
Eng 011222 APS Water Rights BMC 38.410.130 - The applicant must confirm
that they have contacted Griffin Nielsen with the
City Engineering Department to obtain a
determination of cash-in-lieu of water rights
(CILWR). CILWR must be paid prior to site plan
approval.
01/21/2022
12:03 PM
Alicia Paz-Solis Stahly Engineers (Zach
Lowe) has contacted
Griffin Nielsen about
the CILWR.
CILWR for Ministry
Center will be paid
upon request.
10 False Unresolved Engineering
005_Trinity
Church Informal
DRC_Design
Team
Responses.pdf
Eng 011222 APS Encroachment
Permit
The applicant will need to obtain an encroachment
permit for items that will be located within Diamos
Street ROW and in place prior to site plan
approval. Please fill out the permit form posted on
the website:
https://www.bozeman.net/government/engineering
01/21/2022
12:03 PM
Alicia Paz-Solis Access Easement
agreement outlines
terms of use. Please
refer to Document 007
for finalized agreement.
15 False Unresolved Engineering
005_Trinity
Church Informal
DRC_Design
Team
Responses.pdf
Eng 011222 APS SID Waiver Please find a SID Waiver template in the City
Documents and Staff Reports folder.
01/21/2022
12:03 PM
Alicia Paz-Solis Waiver of Right to
Protest has been filed
with Gallatin Co. Clerk
and Recorders office.
Please see copy of
record in Documents.
(016_Waiver of Right to
Protest_SID)
9 False Unresolved Engineering
008_Trinity Trail
Easement.pdf
Eng 011222 APS Public Access
Easement
BMC 38.410.060 - Engineering has reviewed the
provided easement and has no further comment.
The applicant must provide a final signed copy
(with wet signatures) prior to site plan approval.
01/12/2022
1:49 PM
Alicia Paz-Solis Trail Easement has
been approved by the
City and filed with the
Clerk & Recorder.
8 False Unresolved Engineering
007_Trinity
Access
Easement.pdf
Eng 011222 APS Access and Utility
Easement
BMC 38.410.060 - Engineering has reviewed the
provided easement and has no further comment.
The applicant must provide a final signed copy
(with wet signatures) prior to site plan approval.
01/12/2022
1:48 PM
Alicia Paz-Solis Access Easement has
been approved by the
City and filed with the
Clerk & Recorder.
7 False Unresolved Forestry Division
024_L302
Parking Lot
Landscape Plan-
East.pdf
Forestry
Comments - Tree
Spacing Issues
L302
Forestry Comment
4
Proposed tree conflicting with streetlight. Please
adjust spacing (no tree within 10' of utilities) or
remove tree.
01/05/2022
12:52 PM
Alex Nordquest Please see updated
Landscape Plan for
revised layout.
Changemarks Report
6 False Unresolved Forestry Division
022_L300 East
West Trail
Landscape
Plan.pdf
Forestry
Comments - Tree
Spacing Issues
L300
Forestry Comment
3
Proposed tree is not suitable for planting near
overhead power lines. Please substitute with
appropriate species (as per City of Bozeman
Street Tree Guide) or remove tree
01/05/2022
12:50 PM
Alex Nordquest Please see updated
Landscape Plan for
revised layout.
4 False Unresolved Forestry Division
023_L301
Boulevard
Landscape
Plans.pdf
Forestry
Comments - Tree
Spacing Issues
L301
Forestry Comment
1
Proposed tree within 10' of hydrant; please adjust
spacing or remove tree
01/05/2022
12:47 PM
Alex Nordquest Please see updated
Landscape Plan for
revised layout.
5 False Unresolved Forestry Division
023_L301
Boulevard
Landscape
Plans.pdf
Forestry
Comments - Tree
Spacing Issues
L301
Forestry Comment
2
Proposed tree conflicting with sidewalk, hydrant,
sewer line, and gas line; Please remove tree.
01/05/2022
12:47 PM
Alex Nordquest Please see updated
Landscape Plan for
revised layout.
3 False Unresolved Building Division
030_A1.0 Phase
One - Floor
Plan.pdf
Ben Abbey Kitchen Narrative Please provide narrative for the use of the
Kitchen.
01/05/2022
10:40 AM
Ben Abbey Please see Kitchen
Narrative in Documents
(018_Trinity Church
Kitchen Narrative)
1 False Unresolved Solid Waste
005_SD1.2 Site
Details.pdf
refuse enclosure Changemark note
#01
1. front of refuse enclosure needs to be at street
level no curbs or ramps.
12/23/2021
9:11 AM
Russell Ward Please see updated
Site Plan Details for
revised layout. Refer to
SD1.2.
2 False Unresolved Solid Waste
005_SD1.2 Site
Details.pdf
refuse enclosure Changemark note
#02
refuse enclosure doors need to swing open a
minimum of 180 degrees.
12/23/2021
9:11 AM
Russell Ward Refuse Enclosure doors
to swing open 180
degrees.
Please see updated
Site Plan Details for
revised layout. Refer to
SD1.2.