Grouping Cycle Ref # Permit Type Group Name Comment Type Category Type Reviewer Comment Applicant Response Status Updated By Last Updated Completed? Date
Completed
Main Workflow
1 BIC Planning CD Technician Prescreen Prescreen Review Incorrect Naming Protocol
All drawings and
documents have been re-
labeled.
Resolved Renata
Munfrada
12/14/2021 4:23
PM True 12/14/2021
4:23 PM
2 BIC Planning CD Technician Prescreen Prescreen Review Document Orientation Documents have been
rotated to be right side up. Resolved Renata
Munfrada
12/14/2021 4:23
PM True 12/14/2021
4:23 PM
3 BIC Planning CD Technician Prescreen Prescreen Review Traffic Study
Please refer to our Pre-
Screen Narrative
(Document 000)
Resolved Renata
Munfrada
12/14/2021 4:23
PM True 12/14/2021
4:23 PM
4 BIC Planning CD Technician Prescreen Prescreen Review Water Rights
Please refer to our Pre-
Screen Narrative
(Document 000)
Resolved Renata
Munfrada
12/14/2021 4:23
PM True 12/14/2021
4:23 PM
5 BIC Planning CD Technician Prescreen Prescreen Review General Civil Plan
Please refer to our Pre-
Screen Narrative
(Document 000)
Resolved Renata
Munfrada
12/14/2021 4:23
PM True 12/14/2021
4:23 PM
6 BIC Planning CD Technician Prescreen Prescreen Review Utility Plan
Please refer to our Pre-
Screen Narrative
(Document 000)
Resolved Renata
Munfrada
12/14/2021 4:23
PM True 12/14/2021
4:23 PM
1 7 BIC Planning Engineering General Department
Review
CORROSION (DI MAINS) -
The applicant is advised that
due to the known high
groundwater and soil conditions
within the proposed area of
development an increased rate
of corrosion has been observed
with ductile iron water mains,
thus decreasing the longevity of
publicly owned and maintained
infrastructure. The applicant
must provide corrosion
protection for all future water
mains within the development
and identify how the mains will
be protected with future
infrastructure submittal.
Acceptable protection methods
include zinc coated ductile iron
or v-bio enhanced polyethylene
encasement of the main.
Corrosion protection can be
waived, if the applicant can
demonstrate that corrosion
protection is not applicable for
the proposed development.
Typically, in order for a waiver
to be granted, the applicant
must consult the latest
American Water Works
Association and Ductile Iron
According to
Geotechnical Report, the
DIPRA recommendation
is to use standard DIP pip
(with standard shop coat);
no poly wrap is required.
(Pg. 25 of 106)
Please see Geotechnical
Report for further
information.
Unresolved Alicia Paz-Solis 01/12/2022 3:04
PM False 01/12/2022
3:04 PM
Checklist Comments Report
Pipe Research Association
(DIRPA) documentation for
testing\evaluation procedures
and provide an analysis
demonstrating that corrosion
protection is not needed
throughout the entire
development.
8 BIC Planning Engineering General Department
Review
CONDITIONS OF APPROVAL-
The applicant must provide and
file with the County Clerk and
Recorder's office executed
Waivers of Right to Protest
Creation of Special
Improvement Districts (SIDs) or
special districts for the
following, if not already
filed:a.Street improvements to
Durston Road including
lighting, signalization, paving,
curb/gutter, sidewalk, and
storm drainage.b.Street
improvements to North
Ferguson Ave including
lighting, signalization, paving,
curb/gutter, sidewalk, and
storm drainage.c.Intersection
improvements at Durston Road
and North Ferguson Avenue
including lighting, signalization,
paving, curb/gutter, sidewalk,
and storm
drainage.d.Intersection
improvements at Durston Road
and Flanders Mill Road
including lighting, signalization,
paving, curb/gutter, sidewalk,
and storm
drainage.e.Intersection
improvements at Flanders Mill
Road and West Oak Street
including lighting, signalization,
paving, curb/gutter, sidewalk,
and storm
drainage.f.Intersection
improvements at Ferguson Ave
and West Oak Street including
lighting, signalization, paving,
curb/gutter, sidewalk, and
storm drainage.The document
filed must specify that in the
event an SID is not utilized for
the completion of these
improvements, the developer
agrees to participate in an
alternate financing method for
the completion of said
improvements on a fair share,
proportionate basis as
determined by square footage
of property, taxable valuation of
Trinity Church’s Waiver of
Right to Protest (SID) has
been filed with the Clerk
and Recorder’s office.
Please see copy of record
in Documents
(016_Waiver of Right to
Protest_SID).
Unresolved Alicia Paz-Solis 01/12/2022 3:05
PM False 01/12/2022
3:05 PM
Checklist Comments Report
the property, traffic contribution
from the development, or a
combination thereof. The
applicant must provide a copy
of the filed SID waiver prior to
site plan approval.
9 BIC Planning Engineering General Department
Review
INFRASTRUCTURE
SUBMITTALS - DSSP Plans
and Specifications Review
Policy A. -Plans, specifications,
and submittals for public
infrastructure improvements
must be submitted to the City
Engineering Department
(engsubmittals@bozeman.net)
for infrastructure review.
Please see revised Civil
Plans and Details. Unresolved Alicia Paz-Solis 01/12/2022 4:43
PM False 01/12/2022
4:43 PM
10 BIC Planning Engineering General Department
Review
FIRE SERVICE LINES - DSSP
Section V.A (6.b) - Plans for all
4-inch diameter and larger
service lines must be submitted
to the City Engineering
Department
(engsubmittals@bozeman.net)
for infrastructure review. Water
service pipe shall be ductile
iron for services 4-inch and
larger.
Please see revised Civil
Plans and Details. Unresolved Alicia Paz-Solis 01/12/2022 4:44
PM False 01/12/2022
4:44 PM
11 BIC Planning Planning
Art. 2 - Permits,
Legislative
Actions and
Procedures
Department
Review
BMC 38.230.020 -
Classification of plans. This
development meets the criteria
for requiring a master site plan.
Please submit a MSP at your
earliest convenience to be
reviewed concurrently with the
SP
Please see document:
(020_Request for
Mastersite Plan). Per
Danielle Garber’s email,
we are submitting
“Ministry Center” only at
this time.
Unresolved Jacob Miller 01/27/2022 11:56
AM False 01/27/2022