Loading...
HomeMy WebLinkAbout02 Fire Marshall - Trinity Church PH 1 SP 2-27-2023 February 27, 2023 Maryanne St. Sauver Thinkone 101 E Main St-STE A Bozeman, MT 59715 RE: Concurrent Construction for project 21469 Trinity Church PH1 SP. Dear Maryanne, Per ProjectDox documents and drawings reviewed on 2/27/2023, I approve concurrent construction for Trinity Church PH1 SP Project. The following requirements must be met for this approval to be binding. 1. 365/24/7 access to working hydrants and acceptable, approved water source 2. Staging plan for location of construction materials, temporary work trailer, and any additional combustible materials 3. Ingress and egress routes for emergency services 4. All weather site access 5. Knox locks for fenced or gated areas Scott Mueller Deputy Chief Fire Marshal 406.582.2353 smueller@bozeman.net CC: Ross Knapper, Danielle Garber, Alicia Paz-Solis