Loading...
HomeMy WebLinkAbout012_Construction Staging PlanTRAIL EASEMENT25' - 0"BRIDGER VIEW CONNECTION TO EXISTING TRAIL AT FLANDER'S MILL PRE-MANUFACTURED PEDESTRIAN BRIDGE; RE: LANDSCAPE SPANISH PEAKS VIEW10' WIDE ASPHALT SHARED USE PATH PAVED PEDESTRIAN BIKE TRAIL (EXISTING) BENCH CONNECTION TO TRAIL FOR TRAIL MAINTANENCE DURSTON ROAD FERGUSON AVEKimball AveFlander's Mill Subdivision Christ the King Lutheran Church ACCESS EASEMENT60' - 0"FLEXIBLE LAWN SPACE BB COURT SNOW | RETENTIONFULL ACCESS OFFICES MINISTRY CENTER UTILITY EASEMENT 20' - 0"UTILITY EASEMENT20' - 0"4 10 11 11 11 6 8 8 8 UTILITIES VISION TRIANGLEUTILITY EASEMENT10' - 0"CTK TRAIL EASEMENT 15' - 0" STAFF ENTRY MAIN ENTRY Heritage Christian School PARKING CALCULATIONS: PHASE TWO: A-3: CHURCH Parking Requirement = 1 Stall per 6 persons of Max. Occ. Load Main Assembly Space: 648 Occupants Fellowship Hall: 171 Occupants All Classrooms: 334 Occupants MAX OCCUPANT LOAD = 1,153 Occupants Required Phase Two Stalls: 1,153/6 = 192.1667 (193 Stalls) Phase 2 Required Parking per UDO: 193 Stalls Total Phase 2 Parking Provided: 191 Stalls (Additional Stalls provided in Phase 1) Masterplan Parking Required per UDO: 51 + 193 = 244 Stalls Total Masterplan Parking Provided: 86 + 191 = 277 Stalls EXISTING WATER MAIN EXISTING GAS LINE EXISTING COMM. FIBER LINE EXISTING COMM. CABLE LINE NEW 8" WATER LINE NEW SANITARY SEWER MANHOLE FIRE HYDRANT 50' - 0" 5 0 ' - 0 " WA TE RC O U R S E S E T B AC K 7' - 0"ELECTRICAL TRANSFORMER; RE: ELECT. JUNCTION CAN; RE: ELECT. 80' - 8" ROLLDOWN CURB 80' - 8" ROLLDOWN CURB 10' - 0" 5' - 0" NEW CONCRETE SIDEWALK, CONNECT TO EXISTING 5' SIDEWALK 26' - 0"42' - 0"26' - 0"TYP. UNO18' - 0"8' - 0" 72' - 0" 8' - 0" TYP. 26' - 0" 820' - 0"SNOW | RETENTION SNOW | RETENTIONSD1.2 4 COLLECTOR // LANDSCAPE BLOCK FRONTAGEMINOR ARTERIAL // LANDSCAPE BLOCK FRONTAGE EXISTING STREET LIGHTING EXISTING STREET LIGHTINGEXISTING MANHOLE AND TRAIL EASEMENT 10' - 0" UTILITY EASEMENT TRAIL EASEMENT 25' - 0" PROPOSED CROSSWALK CONNECTING TO MEADOWLARK ELEMENTARY N-S SIDEWALK; RE: CIVIL 9' - 0" TYP. 9' - 0" CL ALIGN CL OF ACCESS W/ DIAMOND STREET MONUMENT SIGN SITE LIGHTING; RE: ELECT. GAGA BALL (9) BIKE RACKS PHASE ONE: A-3: COMMUNITY CENTER Parking Requirement = 1 Stall per 200 SF Area: 7,492 SF Gross Required Stalls: 7,492/200 = 37.46 (38 Stalls) B: OFFICE Parking Requirement = 1 Stall per 250 SF Area: 3,600 SF Gross Required Stalls: 3,600/250 = 14.4 (15 Stalls) Phase 1 Parking Required per UDO: 53 Stalls Total Phase 1 Parking Provided: 85 Stalls FIRE HYDRANT50' - 0"30' - 0"42' - 0" LANDSCAPING EXTENTS OF PHASE 1 5 SD1.2 Sim STORMWATER RETENTION SNOW RETENTIONSD1.2 1 Sim WILLIAM A. HANSON 1898 FOETATS MONT A N AEMANZOB T A N ANOM A R C H IT ECTDES N ECIL COPYRIGHT 2019 12/1/2021 10:40:37 AMSD1.0 Site Plan Review 12.1.21 1811TRINITY CHURCHMINISTRY CENTER701 North Ferguson Ave. Bozeman, MT 59718SITE PLAN -PHASE 11" = 40'-0"SD1.0 1 SITE PLAN_Phase 1 Extents NORTH ISSUE DATE DESCRIP. Primary Construction Entrance/Exit - FODS track Pad Secondary Construction Entrance/Exit - FODS track Pad Construction Trailers 10x40 typical. Construction Dumpsters & Recycling Containers - 40 yard typ. Staging & Laydown Areas. Active Spring 2022 thru summer 2023. Areas to be phased according to construction activity. Construction Traffic will access the site via one of the two entrances from Ferguson Ave. Construction Traffic will exit the site via one of the two exits onto Ferguson Ave. Site Security Fencing