Loading...
HomeMy WebLinkAbout010_Stormwater Engineering ReportEngineering Report Stormwater Design 701 N. Ferguson Avenue February 2023 Submitted to: City of Bozeman Engineering Department 20 East Olive Bozeman, MT 59715 Prepared by: Stahly Engineering and Associates 851 Bridger Drive, Suite 1 Bozeman, MT 59715 (406) 522-9526 Stormwater Plan 1 2/17/2023 Engineering Report Table of Contents General Information and Design Criteria Existing Site Conditions Storm Drainage Plan Description Estimation of Runoff Retention Facilities Storm Event Analysis Pipe and Curb Conveyance Capacity Facilities Maintenance Figures and Tables Figure 1. Vicinity Map Figure 2. Stormwater Plan Table 1. Storm Runoff Calculations Table 2. Retention Basin Capacities Table 3. Enhanced Infiltration Capacities Table 4. Stormwater Runoff Rate Calculations Table 5. Pipe Conveyance Capacities Table 6. Curb and Gutter Conveyance Calculations Table 7. Bozeman Rainfall Analysis (1990-2020) Stormwater Plan 2 2/17/2023 General Information and Design Criteria The proposed Trinity Church Development is located northwest of the intersection of Durston Road and Ferguson Avenue. The proposed project consists of a 2-phase site plan to construct a church and related accessory facilities. Phase One includes initial construction of the church building and associated facilities; Phase 2 includes a large addition to the building and additional accessory facilities. The project is proposed on the currently undeveloped 8.818-acre Lot 1 of Diamond Estates Subdivision Number 2 Phase 1. The proposed two-phase Church building will consist of typical uses for a church of this size. Phase 1 will consist of 10,100 square feet of floor space containing a ministry center and offices for church staff. Phase 2 will include 30,565 square feet of floor space and will include classrooms, a nursery, and a large fellowship hall for worship services. Each phase will include associated parking, sidewalk, signage, landscaping, etc. to serve the function of the building. Stormwater mitigation is achieved by 5 traditional retention ponds in addition to using efficient stormwater management design utilizing Low Impact Design (LID) methodology to keep stormwater runoff to pre-development levels. The LID stormwater mitigation will be designed in accordance with City of Bozeman Design Standards and Specifications Policy for retention/infiltration facilities. Plans are provided showing proposed grading, drainage flow paths, and stormwater retention/infiltration details. The Owner’s contact information is: Gallatin Valley Presbyterian Church a/k/a “Trinity Church” 4720 Classical Way Bozeman, MT 59715 Stormwater Plan 3 2/17/2023 Figure 1: Vicinity Map, Bozeman, Montana Existing Site Conditions The Trinity Church project is located on the northwest quadrant of Durston Rd. and Ferguson Ave. intersection and is currently undeveloped. The site slopes slightly to the north but is generally flat within the project limits. Stormwater is currently unmitigated on this site and generally flows to a drainage ditch on the west side of the property. Storm Drainage Plan Description Due to high groundwater, the storm drainage plan for the Trinity Church consists of a combination of traditional stormwater retention ponds designed to infiltrate stormwater and replicate the natural hydrology of the site. The overall storm drainage plan for the Trinity Church is depicted on Figure 2, attached to this report. The plan shows proposed drainage flow paths, drainage basins, and retention ponds. With development, the site will be divided into 5 primary drainage basins. Basin 1 contains the far western portion of the site. Basin 2 contains west-central portion of the site. Basins 3 and 4 contains the north-central of the site. Basin 5 is located along the eastern boundary of the site. Stormwater Plan 4 2/17/2023 Storm runoff from each basin will be mitigated by detention/infiltration systems located on common open spaces. A 10-yr, 2-hr design storm is utilized for these basins. Estimation of Runoff Runoff estimates were obtained for each drainage basin using City of Bozeman standards. For the stormwater detention calculations, the design storm is a 10- year, 2-hour storm. The Bozeman IDF (Intensity, Duration, and Frequency) curves show a rainfall intensity of 0.41 in/hour for the 10-year, 2-hour storm, totaling a 0.81-inch storm event. For the purposes of sizing conveyance facilities, the design storm is a 25-year event at a time of concentration of 5 minutes. This storm has an intensity of 3.826 in/hour, but due to its short duration, only represents a 0.32-inch event. Table 1 shows the storm runoff calculations for the 5 drainage sub-basins. Specifically, the design uses the volume of the 10-year, 2-hour storm (for retention calculations), and the flow rate from the 25-year event (for conveyance calculations). Table 1 – Storm Runoff Calculations Basin Characteristics Basin 1 Basin 2 Basin 3 Basin 4 Basin 5 Area (ft²) 96,665 164,777 48,044 30,455 40,790 Area (acre) 2.22 3.78 1.10 0.70 0.94 Pervious Area (ft^2) 19333 49433 9609 6091 8158 Impervious Area (ft^2) 77332 115344 38435 24364 32632 Pervious ( C ) 0.2 0.2 0.2 0.2 0.2 Impervious ( C ) 0.9 0.9 0.9 0.9 0.9 Weighted ( C ) 0.76 0.69 0.76 0.76 0.76 Runoff Volume (cf) 10-yr 2- hr storm 5020 7769 2495 1582 2118 Flow Rate Q (cfs) 25-yr 5- min Storm 6.453 9.986 3.207 2.033 2.723 Retention Facilities The site contains 5 retention facilities for stormwater management. Table 2 describes the characteristics of each retention basin and total site storage. Stormwater Plan 5 2/17/2023 Table 2 – Retention Basin Capacities Drainage Area 2 1 3 4 5 Retention Basin ID 1 1B 2 3 4 Mitigation Type Retention Retention Retention Retention Retention Ponding Depth (ft) 1.5 1.5 1.5 1.5 1.5 Pond Bottom Area (ft^2) 4335 2959 3003 1340 1023 Pond Top Area (ft^2) 6680 4923 6074 2914 2122 Average Ponding Area (ft²) 5508 3941 4539 2127 1573 Total Ponding Storage (ft^3) 8261 5912 6808 3191 2359 Rain Event Captured (in) 1.35 1.35 0.72 1.05 1.22 Total System Storage Capacity (ft3) 25,107 In addition to providing adequate ponding storage, the retention facilities feature enhanced infiltration to provide further stormwater mitigation. Approximately 50% of the surface area of the bottom of each retention basin will have a strip of gravel that extends to native gravel to facilitate infiltration. This design provides superior infiltration as compared to a typical retention basin. The effects of enhanced infiltration have not been included in design values, so it is possible for these basins to provide greater mitigation performance than indicated in this design report. Detention Basin 1B is designated as a Phase 2 improvement. This will allow adequate facilities to service higher runoff rates following Phase-2 development. The other four basins are each proposed as Phase-1 improvements. Table 3 – Enhanced Infiltration Calculations Detention Basin ID 1 1B 2 3 4 Total Storage Capacity (cf) 8261 5912 6808 3191 2359 Gravel Strip Surface Area (ft^2) 2168 1480 1502 670 512 Gravel Infiltration Rate (in/hr) 1.67 1.67 1.67 1.67 1.67 Time for Complete Infiltration (hr) 27.4 28.7 32.6 34.2 33.1 As shown in Table 3, all basins will drain completely in under 48 hours following the design storm event. Conveyance Capacity Stormwater runoff in each sub-basin will be collected into a storm sewer system for conveyance to retention areas. The pipe network was designed to provide adequate conveyance capacity for the 25-year, 5-minute design storm event. Stormwater Plan 6 2/17/2023 Table 4 shows the storm runoff calculations for the 5 drainage sub-basins, specifically, the design uses the volume of the 10-year, 2-hour storm (for retention calculations), and the flow rate from the 25-year event (for conveyance calculations). Table 4 – Storm Runoff Rate Calculations Basin Characteristics Basin 1 Basin 2 Basin 3 Basin 3 Basin 5 Area (ft^2) 96,665 164,777 48,044 30,455 40,790 Area (acre) 2.22 3.78 1.10 0.70 0.94 Weighted C 0.76 0.69 0.76 0.76 0.76 10-yr,2-hr Q (cfs) 0.69 1.07 0.34 0.22 0.29 25-yr,5-min Q(cfs) 6.45 9.99 3.21 2.03 2.72 Table 5 – Pipe Conveyance Calculations The hydraulic capacity of the site storm drains was analyzed to determine the required pipe size to convey the 25-year, 5-minute storm event. The maximum 25-year event for any of the basins produces approximately 1.92 cfs of runoff. Analysis was performed at a minimum slope of 0.5%. The capacity of a 15” storm drain at 0.5% slope at 90% flow is 4.87 cfs which satisfies the required conveyance capacity in all cases. Manual Input Parameters pipe diameter (in)15 depth in culvert (in)13.50 coefficient of roughness (n)0.013 slope (ft/ft)0.0050 Calculated Input Parameters radius (in)7.50 radius (ft)0.63 depth of flow (ft)1.13 wetted perimeter 3.12 area of flow (ft2)1.16 hydraulic radius 0.37 Avg. Velocity (ft/sec)4.2 Max Velocity (ft/sec)6.3 Calculated Operating Parameters Flowrate culvert (cfs)4.87 Stormwater Plan 7 2/17/2023 Table 6 – Curb and Gutter Conveyance Calculations Curb and Gutter Capacity Calcs Max Curb Conveyance Req'd (ft^3/sec) 1.45 Right-side Slope X:1 0.06 Left-side Slope X:1 33.00 Channel Bottom Width (ft) 0 Flow Depth (ft) 0.350 Flow Area (ft^2) 2.025 Wetted Perimeter (ft) 11.906 Width 0.044 Hydraulic Radius (ft) 0.170 Manning's Roughness 0.013 Slope (ft/ft) 0.005 Average Velocity (ft/sec) 2.49 Flow (ft^3/sec) 5.04 Curb and gutter & chases are primarily used on the site to direct runoff into the storm sewer network. To ensure the standard curb design will provide adequate conveyance capacity for peak flows, the length of curb with the greatest flow was identified and analyzed for conveyance capacity. The critical curb required to convey the maximum flow was identified as the approximately 100’ length of curb channeling runoff to Retention Basin 2, serving a catchment area of approximately 21,774 sf. This catchment area produces a peak flow of 1.45 cfs for the 25-year design storm. As shown in Table 6 above, At the minimum slope of 0.5%, the curb on site has a conveyance capacity of 5.04 cfs. Storm Event Analysis To get a sense of how the site stormwater facilities would have performed in past storm events, a storm event analysis was conducted to determine the percentile storm events in the City of Bozeman. The exercise analyzed 30 years of recorded 24-hour rainfall events using precipitation data collected at MSU rain gauge Station USC00241044. The analysis excluded snow fall events and 24- hour rainfall events that accumulated less than 0.1-inches. The table below summarizes the percentile storm events produced by the analysis. As indicated by the table below, the site’s stormwater system will retain the 97th percentile of storms on site. Stormwater Plan 8 2/17/2023 Table 7 – Bozeman Rainfall Analysis (1990-2020) Percentile Storm Event Volume (in) 80th 0.41 85th 0.49 90th 0.57 95th 0.74 99th 1.2 100th 2.29 Facilities Maintenance The proposed stormwater mitigation systems are located within public rights-of- ways and common open spaces and will be operated and maintained by the owners’ association. A detailed operations and maintenance plan will be developed and will be included in the final covenants. At a minimum, the owners’ association is responsible for quarterly inspection and annual maintenance of all stormwater facilities. The inspection and maintenance responsibilities include, but are not limited to, general housekeeping responsibilities, visual inspection for performance, removal of sediment from mitigation facilities, vegetative maintenance, as well as any necessary repairs to the facilities themselves. >>>>>>> > > >>>>>>4780477747764775477447734 7 7 2 4 771 477 0 47694768 4767 47664769477047714772 UGE UGE UGE[][][][][][][][][][] [] [] [] [] [] [] [] SS WW PHASE 1PHASE 2SSSSSSWWWWWUPSD[][][]>>>>BASIN:16.32 acBASIN: 21.10 acBASIN: 30.88 acBASIN: 40.51 ac1 10/13/2022 SITE PLAN SUBMITTAL ZWL CDP 2 10/31/2022 PRELIM. BID/PERMIT SET ZWL CDP 3 2/17/2023 INFRASTRUCTURE SUBMITTAL ZWL CDP PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESTRINITY CHURCHMINISTRY CENTERSITE PLAN 701 N FERGUSON AVEBOZEMAN, MT 59718FIGURE 2STORMWATERPLAN