Loading...
HomeMy WebLinkAbout000 Narrative for Pre-screen Corrections December 14, 2021 City of Bozeman Planning Division 20 E. Olive St. 1st Floor P.O. Box 1230 Bozeman, MT 59771 RE: Trinity Church – Ministry Center – Phase One Narrative for Pre-Screen Corrections Thank you for your pre-screening comments. Please see our responses to the six items below: · Incorrect Naming Protocol o All Drawings and Documents have been re-named without the date as requested. Additionally, a (3) number preface has been added in-lieu of (2) numbers. · Document Orientation o Documents 007 and 008 have been rotated. · Traffic Study o Per our Informal Review, we discussed the need for a formal Traffic Impact Study. Since the scale of this project is considerably smaller than the overall Phase 2 development, it was deemed unnecessary for Phase 1. In lieu of the Traffic Impact Study, Engineering requested a Phase 1 usage document explaining how many people are expected and at what times throughout the week. Please refer to Document 013 “Phase 1 Usage Estimate”. · Water Rights o Please refer to Document 011 “Water Engineering Report” – Pg. 5./Table 1 Estimated Sewer and Water Use and Demands for Phase One and Two. · General Civil Plan o Please refer to Drawing 009_C1.1 Site Plan for General Civil Plan. Detailed Civil Site Plans are shown on Drawings 010-012. · Utility Plan o Please refer to Drawings 013_C2.0 Water Plan and 015_C3.0 Sewer Plan for Utility Plans. We look forward to your review and are happy to discuss any questions or comments (406) 586-7020. Sincerely, Maryanne St. Sauver, ThinkOne