HomeMy WebLinkAbout005 Phase 5 310 Permit �► Conservation Development September 7,2021 C 'Na E R V A.t'O N Self Government Morrison-Maierle, Inc. Attn: Christine Pearcy PO Box 1113 Bozeman, MT 59771 RE: 310 Application GD 29-21 PERENNIAL STREAM: West Gallatin Canal Dear Ms. Pearcy : The Gallatin Conservation District(GCD)received your 310 application on May 6, 2021. The purpose of the 310 application was to install a series of culverts and culvert extensions through irrigation ditches in order to provide safe crossing for vehicles and pedestrians while conveying irrigation water to downstream users. These culverts will be installed to accommodate the development of Phase 5 of the Bozeman Gateway project. Representatives from the GCD 310-team inspected the project site on May 11, 2021. After a discussion and a review of the 310-permit application on June 17,2021,the GCD Board of Supervisors approved the project as proposed,contingent upon receipt of revegetation plans. Those plans were received September 1,2021;reviewed and accepted by the inspection team. Enclosed are two copies of Form 273 (310 Permit).Keep one copy for your records.The District recommends that you retain all information for current and future reference.The second copy is for the job site.The contractor must maintain a copy of Form 273 and any pertinent design information in his equipment while conducting all fieldwork to ensure your project is implemented according to the permit. REQUIREMENTS • Form 273 (310 Permit): Please fill out and sign the bottom portion of one copy of the 310 Permit and return it to this office within 15 days.If we have not received the permit within that time,you will be in violation of the 310 Law and your permit will not be valid. • Please take pre- and post-photos of the project. • Completion Form:At the completion of the project,fill out the enclosed form,attach photos, and return to this office within 15 days of the completion of the project. Other permits may be needed for your project.A 310 Permit does not give an individual permission to do a project, only to do a project in a specific manner once all other permits are satisfied.This permit is only for the work specified above.If the scope of the work changes,you must apply for a new permit.All individuals undertaking activities specified in a 310 Permit are encouraged to obtain accurate cost estimates for projects and ensure water rights are in order before starting any work. If you have any questions or concerns,please contact me at 406-282-4350. Sincerely, Becky Clements District Administrator Gallatin Conservation District Enclosures Po sox 569 Manhattan,MT 59741 406-2824350 www.gailatinW.org Form 273(Rev.07/01/97) 310 PERMIT Decision Date Application Number STREAMED AND LAND PRESERVATION ACE(310 Law)Supervisors'Decision - --- 9!1/2021 GD 29.21 _ Note: Landowner permission,easements or other federal,state,or local permits,licenses,special use permits,or authorizations may be required before construction of the project. It is the duty of the holder of this permit to determine which are necessary and obtain them prior to construction of the project Name of _ — ------ - Applicant Business Name Address Mitchell Development & -- - Investments,LLC Huffine Lane I City State —� Zip Name of Perennial Stream Bozeman _ MT 59715 West Gallatin Canal Section _ Township Range ___pervisor's Decision -- 14 2S SE Approval asproposed Proposed Activity— - — -- rThe purpose of the proposed project is to install a series of culverts and culvert extensions through irrigation ditches in order to provide safe crossing for vehicles and pedestrians while conveying irrigation water to downstream users.These culverts will be installed to accommodate the development of Phase 5 of the Bozeman Gateway project. Work may not commence of a project for decision True Waiver of 15- False Recurrent r -- Permit Expiration Date Permit Transmittal Date day Waiting Permit unless district has checked the waiver x Period box. 911l2022 91712021 SUPERVISORS'SIGNATURES: a .................................. ..(cut here)............................................................. The applicant must agree to abide by the conditions of this permit by checking the appropriate box,signing below,and returning this form to the di Ict office within 15 days.GD 29.21 I hereby agree to proceed with the project in accordance with the approved application and will allow follow-up inspection. ❑ I understand the project as proposed has been denied,and I may resubmit my application with modifications. ❑ I hereby agree to proceed with the project in accordance with the modifications contained herein,and will allow follow-up inspection. If the applicant disagrees with the supervisors' decision and wishes to formally resolve the dispute, the applicant must check the box below, sign, and return this form to the district within 5 working days. ❑ I disagree with the supervisors'de ' and hereby request arbitr on. Signature of Applicant: _—__ Date: ./ 3 A — Form 273(Rev.07/01/97) 310 PERMIT Decision Date Application Number TREAMBED AND L_AND PRESER_VATION ACE(310 Law)Supervisors'Decision 9/1/2-021-- — - GD 29.21 Note: Landowner permission,easements or other federal,state,or local permits,licenses,special use permits,or authorizations may be required before construction of the project, It is the duty of the holder of this permit to determine which are necessary and obtain them prior to construction of the project Mitchell FNameA li antDevelopment & Business Name Address — — -- --- Investments,LLC Huffine Lane -- _ City — State —� ZIp — Name of Perennial Stream _ -- Bozeman MT 59715 West Gallatin Canal ----- -- Section : Township I Ran a Supervisor's Decision 14 2S L 5E_- 2 Approval as proposed roposed Activity The purpose of the proposed project is to install a series of culverts and culvert extensions through irrigation ditches in order to provide safe crossing for vehicles and pedestrians while conveying irrigation water to downstream users.These culverts will be installed to accommodate the development of Phase 5 of the Bozeman Gateway project. ---- Work may not commence on a project for True Waiver of 15- False Recurrent permit Expiration Date Permit Transmittal Date 15 days after receipt of this decision day Waiting Permit unless district has checked the waiver x Period 9/1/2022 917/2021 box. I ----- SUPERVISORS'SIGNATURES: �c ..........................••• --(cut here)........................................................... The applicant must agree to abide by the conditions of this permit by checking the appropriate box,signing below,and returning this form to the district office within 15 days.GD 29-21 M !hereby agree to proceed with the project in accordance with the approved application and will allow follow-up inspection. ❑ I understand the project as proposed has been denied,and I may resubmit my application with modifications. ❑ I hereby agree to proceed with the project in accordance with the modifications contained herein,and will allow follow-up inspection. If the applicant disagrees with the supervisors'decision and wishes to formally resolve the dispute, the applicant must check the box below, sign, and return this form to the district within 5 working days. ❑ I disagree with the s s'decision and hereb reques rbitratio . Signature of Appli --_---Date: 310 Permit Work Completion Form 310 PERMIT INFORMATION 310 Permit#GD 29-21 Legal Description:Township: 2S, Range:5E, Section: 14 Landowner:Mitchell Development&Investments, LLC Applicant:same Agent: Morrison-Maierle, Inc Stream:West Gallatin Canal Approved Project: 9/1/2021 Permit Expiration Date: 9/1/2022 REQUIREMENTS • The Applicant/Landowner is required to return this form to the Gallatin Conservation District when work is completed or the permit expires. Include pre-and post-photos of the project. Date work completed Note:If work is not completed,provide explanation below Explanation Signature: Date: Contact Information (Required for Follow-up Inspection) Name• Address Phone/Cell#: Email• Gallatin Conservation District 120 S 5tn Street, PO Box 569 Manhattan MT 59741 406-282-4350 Email: becky@gallatincd.org ' SHORT-TERM WATER QUALITY STANDARD FOR TURBIDITY RELATED TO ,r Montana Department. of CONSTRUCTION ACTIVITY 11 �NMONMENTAL QUALITY (318 Authorization) Dear Applicant: This 318 authorization is the result of your romtC application for a 310 permit from your local Conservation District or a 124 permit from Montana knish,Wildlife and Parks.This authorization is valid for the time frame noted on your permit. This is not your 310 or l24 permit and no construction activity should occur until you have received.a valid310 or 124 permitas well as any other pertatlts that apply to this proposed construction activity. This authorization is the result ofen Operating Agreem=between the Montana Department of Environmenttal Quality (D8Q),and Montana Fish,Wildlife and Panes(FWP). The applicant agrees to the comply with the conditions statedd below,as well as other conditions listed in the 310 or 124 permit issued for this project. Signatures of the applicant and FWP are required to validate this authorization. 1. Conshw don activity in or near the watercourse are to be limited to the minimum area ateoessary,and conducted so as to minimize increases in suspehdod solids.and turbidity that could degrade water quality and adversely affect aquatic life outside the immediate area of operation. 2. The use of machinery in the watercourse shall be avoided unless absolutely necessary. 3. All disturbed stream banks and adjacent areas created by the construction activity shall be protected with erosion control measures during construction.These areas shall be-reclaimed with appropriate erasion control measures and revegetated to provide long-ter=erosion contrdl. 4. Any.excess material generated from this project must be disposed of above the ordinary high water marls,in an area not classified as a wetland,and in a position not to cause pollution of State.waters. S. Clearing of vegetation will be limited to that which is absolutely necessary for construction of the project. d. This authorization doers not authorize a point source surface water discharge. WDES permit is required for said discharge. 7. Open cut creek crossings will not be allowed in flowing water.Stream water must be diverted around the open out area(pump,flume etc.) ti S. The applicant must conduct all activities in full and complete compliance with all terms snd conditions of all permits required for this aodiiity issued pursuant to the Montana Natural Streambed and Land Preservation Act (310 permit),the Stream Protection Act(124 permit)the Federal Clean Water Act(404 Permit),any MPDES permits for dewateiing or storm water control in the construction area and any valid Memorandum of Agreement and Authorization(WAA)negotiated for this activity. 7be F1iVj6prewnUtive has determined that this project is within the.scope of the programmatic Environmental As p*pr!P*d by DBQ and SNP-for the issyance of narrative turbidity standards. `. _mot / ' Y' Y �.�r'f. ' !'•Data �/l� i :C�4 epresentat ve's Signature ' -Applicant's Sionature Nance and location of project: ?