September 7,2021 C 'Na
E R V A.t'O N Self Government
Morrison-Maierle, Inc.
Attn: Christine Pearcy
PO Box 1113
Bozeman, MT 59771
RE: 310 Application GD 29-21 PERENNIAL STREAM: West Gallatin Canal
Dear Ms. Pearcy :
The Gallatin Conservation District(GCD)received your 310 application on May 6, 2021. The purpose of
the 310 application was to install a series of culverts and culvert extensions through irrigation ditches in order to
provide safe crossing for vehicles and pedestrians while conveying irrigation water to downstream users. These
culverts will be installed to accommodate the development of Phase 5 of the Bozeman Gateway project.
Representatives from the GCD 310-team inspected the project site on May 11, 2021.
After a discussion and a review of the 310-permit application on June 17,2021,the GCD Board of
Supervisors approved the project as proposed,contingent upon receipt of revegetation plans. Those plans were
received September 1,2021;reviewed and accepted by the inspection team.
Enclosed are two copies of Form 273 (310 Permit).Keep one copy for your records.The District recommends that
you retain all information for current and future reference.The second copy is for the job site.The contractor must
maintain a copy of Form 273 and any pertinent design information in his equipment while conducting all fieldwork
to ensure your project is implemented according to the permit.
REQUIREMENTS
• Form 273 (310 Permit): Please fill out and sign the bottom portion of one copy of the 310 Permit and
return it to this office within 15 days.If we have not received the permit within that time,you will be in
violation of the 310 Law and your permit will not be valid.
• Please take pre- and post-photos of the project.
• Completion Form:At the completion of the project,fill out the enclosed form,attach photos, and
return to this office within 15 days of the completion of the project.
Other permits may be needed for your project.A 310 Permit does not give an individual permission to do a project,
only to do a project in a specific manner once all other permits are satisfied.This permit is only for the work
specified above.If the scope of the work changes,you must apply for a new permit.All individuals undertaking
activities specified in a 310 Permit are encouraged to obtain accurate cost estimates for projects and ensure water
rights are in order before starting any work.
If you have any questions or concerns,please contact me at 406-282-4350.
Sincerely,
Becky Clements
District Administrator
Gallatin Conservation District
Enclosures Po sox 569
Manhattan,MT 59741
406-2824350
www.gailatinW.org
Form 273(Rev.07/01/97)
310 PERMIT Decision Date Application Number
STREAMED AND LAND PRESERVATION ACE(310 Law)Supervisors'Decision -
--- 9!1/2021 GD 29.21 _
Note: Landowner permission,easements or other federal,state,or local permits,licenses,special use permits,or authorizations may be required before construction
of the project. It is the duty of the holder of this permit to determine which are necessary and obtain them prior to construction of the project
Name of _ — ------ -
Applicant Business Name Address
Mitchell Development & -- -
Investments,LLC
Huffine Lane
I City
State —� Zip Name of Perennial Stream
Bozeman _ MT 59715 West Gallatin Canal
Section _ Township Range ___pervisor's Decision --
14 2S SE Approval asproposed
Proposed Activity—
- — --
rThe purpose of the proposed project is to install a series of culverts and culvert extensions through irrigation ditches in order to provide
safe crossing for vehicles and pedestrians while conveying irrigation water to downstream users.These culverts will be installed to
accommodate the development of Phase 5 of the Bozeman Gateway project.
Work may
not commence
of a project for
decision True Waiver of 15- False Recurrent r --
Permit Expiration Date Permit Transmittal Date
day Waiting Permit
unless district has checked the waiver x Period box. 911l2022 91712021
SUPERVISORS'SIGNATURES:
a .................................. ..(cut here).............................................................
The applicant must agree to abide by the conditions of this permit by checking the appropriate box,signing below,and returning this form
to the di Ict office within 15 days.GD 29.21
I hereby agree to proceed with the project in accordance with the approved application and will allow follow-up inspection.
❑ I understand the project as proposed has been denied,and I may resubmit my application with modifications.
❑ I hereby agree to proceed with the project in accordance with the modifications contained herein,and will allow follow-up inspection.
If the applicant disagrees with the supervisors' decision and wishes to formally resolve the dispute, the applicant must check the box below, sign,
and return this form to the district within 5 working days.
❑ I disagree with the supervisors'de ' and hereby request arbitr on.
Signature of Applicant: _—__ Date: ./ 3 A —
Form 273(Rev.07/01/97)
310 PERMIT Decision Date Application Number
TREAMBED AND L_AND PRESER_VATION ACE(310 Law)Supervisors'Decision 9/1/2-021-- — -
GD 29.21
Note: Landowner permission,easements or other federal,state,or local permits,licenses,special use permits,or authorizations may be required before construction
of the project, It is the duty of the holder of this permit to determine which are necessary and obtain them prior to construction of the project
Mitchell FNameA li antDevelopment & Business Name Address — —
-- ---
Investments,LLC Huffine Lane
-- _
City — State —� ZIp — Name of Perennial Stream
_ --
Bozeman MT 59715 West Gallatin Canal
----- --
Section : Township I Ran a Supervisor's Decision
14 2S L 5E_- 2 Approval as proposed
roposed Activity
The purpose of the proposed project is to install a series of culverts and culvert extensions through irrigation ditches in order to provide
safe crossing for vehicles and pedestrians while conveying irrigation water to downstream users.These culverts will be installed to
accommodate the development of Phase 5 of the Bozeman Gateway project.
----
Work may not commence on a project for True Waiver of 15- False Recurrent permit Expiration Date Permit Transmittal Date
15 days after receipt of this decision day Waiting Permit
unless district has checked the waiver x Period 9/1/2022 917/2021
box. I -----
SUPERVISORS'SIGNATURES:
�c ..........................••• --(cut here)...........................................................
The applicant must agree to abide by the conditions of this permit by checking the appropriate box,signing below,and returning this form
to the district office within 15 days.GD 29-21
M !hereby agree to proceed with the project in accordance with the approved application and will allow follow-up inspection.
❑ I understand the project as proposed has been denied,and I may resubmit my application with modifications.
❑ I hereby agree to proceed with the project in accordance with the modifications contained herein,and will allow follow-up inspection.
If the applicant disagrees with the supervisors'decision and wishes to formally resolve the dispute, the applicant must check the box below, sign,
and return this form to the district within 5 working days.
❑ I disagree with the s s'decision and hereb reques rbitratio .
Signature of Appli --_---Date:
310 Permit Work Completion Form
310 PERMIT INFORMATION
310 Permit#GD 29-21
Legal Description:Township: 2S, Range:5E, Section: 14
Landowner:Mitchell Development&Investments, LLC
Applicant:same
Agent: Morrison-Maierle, Inc
Stream:West Gallatin Canal
Approved Project: 9/1/2021
Permit Expiration Date: 9/1/2022
REQUIREMENTS
• The Applicant/Landowner is required to return this form to the Gallatin Conservation District
when work is completed or the permit expires.
Include pre-and post-photos of the project.
Date work completed
Note:If work is not completed,provide explanation below
Explanation
Signature: Date:
Contact Information (Required for Follow-up Inspection)
Name•
Address
Phone/Cell#:
Email•
Gallatin Conservation District
120 S 5tn Street, PO Box 569
Manhattan MT 59741
406-282-4350
Email: becky@gallatincd.org
' SHORT-TERM WATER QUALITY STANDARD
FOR TURBIDITY RELATED TO
,r Montana Department. of CONSTRUCTION ACTIVITY
11 �NMONMENTAL QUALITY (318 Authorization)
Dear Applicant:
This 318 authorization is the result of your romtC application for a 310 permit from your local Conservation District or a
124 permit from Montana knish,Wildlife and Parks.This authorization is valid for the time frame noted on your permit.
This is not your 310 or l24 permit and no construction activity should occur until you have received.a valid310 or
124 permitas well as any other pertatlts that apply to this proposed construction activity.
This authorization is the result ofen Operating Agreem=between the Montana Department of Environmenttal Quality
(D8Q),and Montana Fish,Wildlife and Panes(FWP).
The applicant agrees to the comply with the conditions statedd below,as well as other conditions listed in the 310 or
124 permit issued for this project. Signatures of the applicant and FWP are required to validate this authorization.
1. Conshw don activity in or near the watercourse are to be limited to the minimum area ateoessary,and conducted
so as to minimize increases in suspehdod solids.and turbidity that could degrade water quality and adversely affect
aquatic life outside the immediate area of operation.
2. The use of machinery in the watercourse shall be avoided unless absolutely necessary.
3. All disturbed stream banks and adjacent areas created by the construction activity shall be protected with erosion
control measures during construction.These areas shall be-reclaimed with appropriate erasion control measures
and revegetated to provide long-ter=erosion contrdl.
4. Any.excess material generated from this project must be disposed of above the ordinary high water marls,in an
area not classified as a wetland,and in a position not to cause pollution of State.waters.
S. Clearing of vegetation will be limited to that which is absolutely necessary for construction of the project.
d. This authorization doers not authorize a point source surface water discharge.
WDES permit is required for said discharge.
7. Open cut creek crossings will not be allowed in flowing water.Stream water must be diverted around the open out
area(pump,flume etc.)
ti
S. The applicant must conduct all activities in full and complete compliance with all terms snd conditions of all
permits required for this aodiiity issued pursuant to the Montana Natural Streambed and Land Preservation Act
(310 permit),the Stream Protection Act(124 permit)the Federal Clean Water Act(404 Permit),any MPDES
permits for dewateiing or storm water control in the construction area and any valid Memorandum of Agreement
and Authorization(WAA)negotiated for this activity.
7be F1iVj6prewnUtive has determined that this project is within the.scope of the programmatic Environmental
As p*pr!P*d by DBQ and SNP-for the issyance of narrative turbidity standards.
`. _mot
/ ' Y' Y �.�r'f. ' !'•Data �/l�
i :C�4
epresentat ve's Signature ' -Applicant's Sionature
Nance and location of project: ?