Loading...
HomeMy WebLinkAbout025 Traffic Study1 Mike G. Hickman From:Lance Lehigh <llehigh@BOZEMAN.NET> Sent:Tuesday, October 11, 2022 3:44 PM To:Mike G. Hickman Subject:RE: Shady Glen PUD (22293) and PrePlat (22294)  ***This message originated from an External Source.*** Please use proper judgment and caution when opening  attachments, clicking links, or responding to this email.    Hey Mike,     Thank you for the following information/traffic study waiver request; in regard to the Shady Glen Development. I have  reviewed your request for a Traffic Study wavier. In addition, I have also checked the ITE manual based on the proposed  zoning/usage and have confirmed the information you provided is accurate and sufficient.     ITE Generation Information  Avg Weekday Trips: 151 trips using the average rate, 187 using the fitted curve  PM Peak hour Trips: 15 trips using the average rate, 18 using the fitted curve.    Based on the information provided, the proposed ADT and Peak/Hr trips are below the requirements for a formal traffic  study. Therefore, the applicant does not need to complete a traffic study for the Shady Glen subdivision development.  Please provide this email as a formal Traffic Study waiver with the preliminary plat submittal. Please reach out if you  have any questions concerning the submittal process.     Thanks,     Lance     City of Bozeman MT  Lance Lehigh, PE, CFM | Interim City Engineer    From: Mike G. Hickman <mhickman@m‐m.net>   Sent: Monday, October 10, 2022 8:49 AM  To: Lance Lehigh <llehigh@BOZEMAN.NET>  Subject: Shady Glen PUD (22293) and PrePlat (22294)    CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the  sender and know the content is safe.  The proposed layout for the Shady Glen development has a total of 16 single-family lots which, at 10 trips per day per lot, equals 160 ADT. Based on our experience, this being less than 500 ADT, it would not typically require a traffic study. Please verify that a traffic study will not be required for the Shady Glen project. The previously submitted Preliminary Plat drawing is attached for reference. Thanks - 2   Mike G. Hickman, PE  Senior Civil Engineer, Morrison-Maierle  +14069226829 direct | +14065816806 mobile 2880 Technology Blvd W, Bozeman, MT 59718        City of Bozeman emails are subject to the Right to Know provisions of Montana’s Constitution (Art. II, Sect. 9) and may  be considered a “public record” pursuant to Title 2, Chpt. 6, Montana Code Annotated. As such, this email, its sender  and receiver, and the contents may be available for public disclosure and will be retained pursuant to the City’s record  retention policies. Emails that contain confidential information such as information related to individual privacy may be  protected from disclosure under law.