Loading...
HomeMy WebLinkAbout008 Bozeman Schools Ok _______________________________________________________________________________________________________ September 28, 2020 Tom Murphy Bridger Center LLC 1450 Cherry Drive Bozeman, MT 59715 Via email: bridgercenterllc@gmail.com Subject: Bridger Meadows Subdivision Legal Description: S31, T01 S, R06 E, C.O.S. 885, TRACT NW4SE4 12AC Dear Mr. Murphy, Referencing your exhibit received September 28, 2020 concerning the evaluation of the subject subdivision: Bozeman Public Schools would expect that the creation of 17 additional residential lots could generate the following students. ¨ Pre-K to 5th 4 Students ¨ 6th to 8th 2 Students ¨ 9th to 12th 3 Students As of this date, the proposed development will be in the Hawthorne Elementary School, Chief Joseph Middle School and Bozeman High School attendance areas. Our elementary schools are nearing capacity, and the added enrolment for the proposed development may likely necessitate the need for Elementary #9. This need would be dependent on the successful passage of a future bond initiative for the design and construction for the needed school. The recent addition and expansion at Sacajawea Middle School will accommodate the proposed enrolment increase at the middle school level, as will the development of Gallatin High School, which is currently underway and scheduled to open prior to the start of school in the Fall of 2020. Population growth and demographic shifts in the future may necessitate boundary realignments to existing schools, which could modify the designated attending schools. Similarly, if a designated school attendance area’s student population exceeds the school’s capacity, attendance at an alternate school may be required. Infrastructure, such as sidewalks, should be constructed for the entire project irrespective of when actual homes are developed to provide a Safe Route to School pathway for students to safely traverse the proposed developed and existing roadways. Our existing bus system can accommodate the estimated number of additional students. Please let us know if there are any changes to the proposed development as this could modify the above student projections. Todd Swinehart, PE Director of Facilities (406) 522-6009 todd.swinehart@bsd7.org Bozeman Public Schools 404 West Main, PO Box 520 Bozeman, MT 59771-0520 www.bsd7.org Sincerely, Todd Swinehart, PE cc: Steve Johnson, Deputy Superintendent of Operations – Bozeman Public Schools Douglas Kellie, Transportation Coordinator – Bozeman Public Schools 10+00 11+00 12+ 0 0 1 3+ 0 0 14 + 00 1 5+ 00 16 +0 0 17 + 00 18+ 0 0 19+00 20+00 20+68 PC: 11+36.79 PT: 12 +8 3 . 68 PC : 17 + 33 . 62 PT: 18+80.84 SHADY GLEN LANE0+001+002+002+00PC: 0+35.94PT: 1+09.54-0+100+001+001+6110+00 11+00 12+ 0 0 1 3+ 0 0 14 + 00 1 5+ 00 16 +0 0 17 + 00 18+ 0 0 19+00 20+00 20+68 PC: 11+36.79 PT: 12 +8 3 . 68 PC : 17 + 33 . 62 PT: 18+80.84 -0+100+001+001+61SD SD SD GWGWGWGWGW GW GW GW GWSDSDSD 10+00 11+00 12+ 0 0 1 3+ 0 0 14 + 00 1 5+ 00 16 +0 0 17 + 00 18+ 0 0 19+00 20+00 20+68 PC: 11+36.79 PT: 12 +8 3 . 68 PC : 17 + 33 . 62 PT: 18+80.84 -0+100+001+001+61[] [][][] [][]GWGWGWGWGWGWGWGWGWGWGWGWGWGWGWGWGWGWGWBRIDGERMEADOWSWILDLIFEREFUGEFIGURE NUMBER©PROJECT NO.DRAWN BY:DSGN. BY:APPR. BY:DATE:COPYRIGHT MORRISON-MAIERLE, INC.,2020N:\5311\001.01 - PUD\ACAD\Exhibits\Exhibit-C.dwg Plotted by dean squires on Sep/9/2020engineers surveyors planners scientistsMorrisonMaierle2880 Technology Blvd WestBozeman, MT 59718406.587.0721www.m-m.net5311.001EX. CBRIDGER MEADOWS SUBDIVISIONBOZEMANMONTANAEXHIBIT C - PROPOSED SITE EXHIBITCJFMGHMGH06/20205010025500SCALE IN FEETLOT 1CURRENTLY PROPOSEDGRADING LIMITSWETLAND - 3IMPACT AREA = 0.060 AC.WETLAND - 4IMPACT AREA = 0.010 AC.NOTE: DELINEATION CONDUCTED 10/05/2018 AND 04/27/2019 BY TERRAQUATIC, LLC.100-YR FLOODWAYLEGEND100-YR FLOODPLAINEXISTING WETLANDSLOT 2LOT 3LOT 4LOT 5LOT 6LOT 7LOT 8LOT 9LOT 10LOT 11LOT 12LOT 13LOT 14LOT 15LOT 16LOT 17WATERCOURSESETBACKWATERCOURSESETBACKWATERCOURSESETBACKWETLANDS IMPACTSCURRENT GRADING LIMITSPREVIOUSLY PROPOSEDGRADING LIMITSCURRENTLY PROPOSEDGRADING LIMITSPREVIOUSLY PROPOSEDGRADING LIMITSPREVIOUS GRADING LIMITSWETLAND - 1IMPACT AREA = 0.008 AC.