List of Relaxation Requests
Shady Glen Planned Unit Development
Planned Unit Development Preliminary Plan - PUDP
Based on direction received during
prior PUD applications and along in response to existing conditions, the Shady Glen PUD will look to
request the following relaxations. Justification and reasoning for each of these is provided below.
1. Section 38.400.010.A.8: A relaxation for the design of a dual (combined) use access for
pedestrians and emergency or other authorized vehicles.
2. Section 38.400.050.A: A relaxation from specific right-of-way and design standards for local
streets, for Shady Glen Lane.
3. Section 38.410.040.D: A relaxation from right-of-way standards, for a pedestrian access
doubling as an emergency vehicle access.
4. Section 38.410.100.A.2.c.4: A relaxation from watercourse setback and wetland buffer
requirements.
5. Section 38.410.100.A.2.d: A relaxation to allow placement of fill material, for non-exempt uses,
within the East Gallatin River’s 100-year floodplain.
6. Section 38.310.030, Table38.310.030.A: A relaxation to allow townhouses as a permitted use
within the R-1 zoning district in order to develop two deed-restricted affordable housing units.
1.Section 38.400.010.A.8, Dual-Use Access for Pedestrians and Emergency Vehicles:
As a second means of access, the Applicant is requesting relaxations to design standards, to provide an
emergency access in the form of a “dual-use” access restricted to pedestrians, bicycles and emergency
or other authorized vehicles. Relaxations are needed to provide safety for the non-motorized public
uses combined with the restricted access to motorized vehicles. Public access will be to the east through
The Links Condominiums as a proposed extension of their existing access drive. However, as stated in
06 Narrative, a second public vehicular access is not feasible due to physical constraints, so a “dual-use”
access is proposed to provide passage for emergency vehicles while also retaining public access along
this route for bicycles and pedestrians. The pedestrian/emergency access, as proposed, would utilize an
existing offsite easement from Shady Glen’s south boundary to Commercial Drive, and extend this
alignment north to Shady Glen Lane. The entire access would be paved with asphalt and designed to
meet the City’s emergency access standards.
To take advantage of a unique opportunity to significantly enhance pedestrian connectivity, the access is
proposed as a “dual-use” access combining a gated access (for emergency or other authorized vehicles)
with an ADA-accessible, bike-friendly pedestrian access; refer to (054) Ex. 11 - Emergency and
Pedestrian Access - Offsite Area. A locked gate would be available for authorized vehicular use, and a
separate 4-foot wide un-gated opening between steel bollards would allow free passage for pedestrians
and bicycles. In accordance with Fire Department requirements, the proposed vehicle gate is a swing
gate with 20-foot clear width and a Knox padlock to prevent unauthorized vehicle use. The dual-purpose
use would accomplish the following:
A new pedestrian pathway to Bridger Drive would create a significant connection to local
businesses and Story Mill Park, mid-way between existing trails on the East Gallatin River (west
end of Commercial Drive) and Birdie Drive. This would be a great amenity for all trail users,
Shady Glen PUD – List of Relaxation Requests
Planned Unit Development Preliminary Plat
Page 2
October 21, 2022
specifically, the large residential population north of Bridger Center Subdivision 081 Ex. 15 -
Trail Connections
The pedestrian pathway would be immediately adjacent to Shady Glen’s playground and picnic
area within Common Open Space 04.
The pedestrian pathway/emergency access would have a maximum slope of 5.0 percent,
meeting ADA standards; the “pass-through” pedestrian/bicycle opening, next to the locked gate,
would have a minimum opening width that also complies with ADA requirements.
The City of Bozeman will not be responsible for maintenance. The entire access, from Shady
Glen Lane to Commercial Drive, will be maintained for all-season access by a private-party
maintenance agreement set up by the Shady Glen Property Owner’s Association.
The “dual access” will normally function as a pedestrian and non-motorized access through the 4-foot
opening, using the asphalt paving designed for emergency vehicles. Authorized/emergency vehicular
traffic will enter through the larger, locked gate. An easement for pedestrian, bicycle and
authorized/emergency vehicle use will be provided from the Shady Glen Lane right-of-way to the
project’s south property line, where the existing 60’ easement begins. The City of Bozeman Fire
Department is in support of this approach; refer to (071) Fire Dept. Support. This approach will require a
relaxation for pedestrian right-of-way; refer to Section 07 (Relaxations).
The Applicant will establish a maintenance agreement between the HOA and adjacent property owners
along the easement to Commercial Drive to maintain the full length of the access year-round for
pedestrians and emergency vehicles, both within and outside the property boundary.
As a benefit not required by subdivision code, the access will enhance Public Safety in the area by
serving not only the proposed Shady Glen development, but at the same time providing a currently
unavailable emergency access route to all of Bridger Center Subdivision and to the east end of The Links
Condominiums. This would greatly improve reliability of access to the Bridger Commercial Center in an
emergency.
The dual-use pedestrian/emergency access would provide a currently unavailable emergency “through”
route between the existing cul-de-sacs of Bridger Center Drive/Commercial Drive and Birdie Drive. It
cannot be emphasized enough that the proposed dual-use access would provide a second access for
numerous commercial/industrial business that use and store chemicals and petroleum products and, in
a fire, would be far more likely to produce toxic fumes or explosions than a residential neighborhood
would. This is a major benefit to the entire area!
2.Section 38.400.050.A, Local Street Right-of-way and Design Standards:
The Applicant is requesting relaxations to right-of-way width and construction standards on Shady Glen
Lane, from its connection to an existing privately maintained access drive within The Links condominium
development, through a public access and utility easement to the Shady Glen property, and through
Shady Glen itself to a cul-de-sac. The relaxations are needed to minimize impacts to existing wetlands
west of the street and adjacent lots, while providing adequate space for the street, pedestrian access,
snow storage and residential homesites. The requested relaxations partially eliminate the east sidewalk
Shady Glen PUD – List of Relaxation Requests
Planned Unit Development Preliminary Plat
Page 3
October 21, 2022
and east side parking lane; replace a crowned cross-section with a cross-slope; and reduce the public
right-of-way width accordingly. The street itself will meet all other City standards for a local street
including construction materials, slopes and horizontal alignment. Excluding the cul-de-sac area, the
requested relaxations provide all the required services within a 42-foot right-of-way. Refer to (50a),
(50b) and (50c) Typical Street Sections for proposed typical street sections. Each relaxation is described
below.
1.Excluding the cul-de-sac area, provide an attached 5’ sidewalk on the west side of Shady Glen
Lane, in lieu of the standard detached sidewalk and boulevard. Shady Glen Lane is proposed as
an extension of the existing access drive through The Links Condominiums, which has an
attached 5’ sidewalk on the south side. There are no residential lots on the east side of Shady
Glen Lane in this area. Snow will be removed and stored on the east side of the street, in a
7’ wide landscaped area extending from the curb to the property line. The street will be
privately maintained. To take the place of boulevard trees adjacent to residential lots, the
Development Guidelines will require trees to be planted on each residential lot near the
right-of-way line.
2.Excluding the cul-de-sac area, eliminate the sidewalk on the east side of Shady Glen Lane. This is
proposed for two reasons: in this area there are no lots fronting the east side of Shady Glen
Lane; and an existing, established pedestrian trail parallel to and less than 10 feet away from
Shady Glen Lane can accommodate pedestrian traffic along this side of the street. The 7’ wide
landscaped area between the back of curb and the property line will be used for snow storage,
so snow will not be pushed onto the attached west side sidewalk or onto the existing east side
trail.
3.Eliminate the east side parking lane. The purpose of the parking lane requirement on each side
of the street is to provide adequate parking for lots on each side. Since there are no residential
lots on the east side of the street, the east side parking lane is unnecessary and excessive.
Eliminating this parking addresses concerns of the adjacent Village Greens Townhouses by
reducing vehicular activity, including noise and headlights, immediately adjacent to the existing
trail and townhouses. The street elevation is generally below that of the existing trail; see
(57) Ex. 12 Shady Glen Lane Cross Sections. Eliminating the east parking lane also reduces
storm runoff by reducing impervious area where it is not needed. The unobstructed “through
lanes,” required for emergency access, are standard width and are not affected. “No Parking”
signage will be installed at regular intervals along the east side of the street.
4.Reduce Shady Glen Lane right-of-way width from 60 feet to 42 feet. The reduction in
right-of-way width is appropriate in combination with the above-requested relaxations: with an
attached sidewalk on one side and no sidewalk on the other side, in addition to prohibiting
parking on the east side of the street adjoining Village Greens, 42 feet is adequate to meet the
underlying reasons that justify the 60-foot right-of-way as a City standard. Driving lane widths
and the remaining parking lane width are consistent with City standards; they were not reduced
to accommodate the reduced right-of-way width. In addition, there is no possibility of increased
traffic on this street, so no possible need for widening it in the future. The east side right-of-way
extends 7 feet beyond the curb; this area will be used for snow storage and is wider than the
typical local street boulevard. Finally, the narrower ROW allows better protection of critical
wetlands and the existing aspen grove by shifting residential lots away from the wetlands.
Shady Glen PUD – List of Relaxation Requests
Planned Unit Development Preliminary Plat
Page 4
October 21, 2022
5.Replace the standard crowned street cross-section with a cross-slope. A cross-sloped street
surface is proposed to promote better drainage than a crowned road would provide on this
narrower street; this will facilitate long-term street maintenance such as re-paving. Street
runoff will be collected exclusively in the west side curb and gutter. Maximum gutter flow depth
in a 25-year storm event will meet City standards and allow safe passage of emergency and
other vehicles during peak runoff. A cross slope of 3 percent is proposed and meets City
standards.
The above relaxations apply from the offsite connection to the west end of the existing access drive
within The Links Condominiums to the east side of the proposed cul-de-sac within the Shady Glen
development. The above relaxations represent a logical extension of the existing access drive within
The Links. The Links has a single attached sidewalk on the south side, and no sidewalk on the north side;
like Shady Glen, there are no residences on the north side and the existing trail provides pedestrian
access on that side. Smooth transitions will be provided between the three typical street sections;
proposed stationing (length and location) of these transitions are identified in (50a), (50b) and (50c)
Typical Street Sections.
Snow storage is proposed to be along the north side of Shady Glen Lane, within the 7-foot wide
landscaped area from the street curb to the property line. Under existing, undeveloped conditions, the
eastern 40 to 50 feet of the Shady Glen property drains east to the existing Story Mill spur trail and the
Village Greens Townhouses. In contrast, following development, the width of direct runoff to the east
would be reduced to the 7-foot snow storage area that generally slopes toward the west (the street)
and away from the trail and townhouses. Therefore, snowmelt from stored snow would for the most
part drain to the west, and there would be a net reduction in runoff, including snowmelt, to offsite
areas. Refer to Exhibit 12 showing several cross-sections through this area.
3. Section 38.410.040.D, Pedestrian Right-of-Way Standards:
The Applicant is requesting relaxations to the pedestrian walk setback requirement and sidewalk design
standards, for a mid-block pedestrian walk that is proposed as a “dual-use” pathway for emergency
vehicular access as well as for pedestrian and bicycle access.
The proposed dual use is described in detail above under Relaxation #1. The pedestrian walk is
proposed as a 20-foot wide walk rather than a 10-foot wide walk, to accommodate its other use as an
emergency vehicle access. These two distinct uses are compatible by the use of a locked vehicle gate to
eliminate unauthorized vehicular traffic.
A relaxation is requested to allow a 7.5-foot setback on each side of the 20-foot wide pedestrian walk,
rather than the standard minimum 10-foot setback. Because the 20-foot width is a requirement for the
emergency access and a single-use pedestrian walk could meet the standards at a 10-foot width, the
widening of a 10-foot walk to 20 feet is required only due to the unique, dual-use nature of the
pedestrian walk. The proposed widening would result in a pedestrian “corridor” (walkway plus
setbacks) of 35 feet which exceeds the standards, in terms of total width including setbacks, by 5 feet.
This relaxation would allow the benefits of providing essential emergency services while also providing
much improved connectivity between existing trails, neighborhoods, businesses and parks.
A relaxation is requested to allow the pedestrian walk to be asphalt-paved. This request is also driven
by the pedestrian walk’s other use as a “restricted access” vehicular route. Asphalt paving is the typical
Shady Glen PUD – List of Relaxation Requests
Planned Unit Development Preliminary Plat
Page 5
October 21, 2022
surfacing material for an emergency access, and the intent is to build the pedestrian walk/emergency
access in conformance with City design standards for an emergency access. The City of Bozeman will
not be responsible for maintenance. The entire access, from Shady Glen Lane to Commercial Drive, will
be maintained for all-season access by a private-party maintenance agreement set up by the Shady Glen
Property Owner’s Association.
4. Section 38.410.100.A.2.c.4, Watercourse Setback and Wetland Buffer Requirements:
The Applicant is requesting a relaxation to the inclusion of immediately adjacent wetlands and a
reduction to the 50-foot wetland buffer width, as described below. The existing and proposed
watercourse setbacks and wetland buffers are shown on (58) Ex. 13 - Watercourse Setback.
Watercourse Setback:
Per City code, the watercourse setback must extend to the edge of the 100-year floodplain and must
include immediately adjacent wetlands.
The Applicant is requesting a relaxation of this requirement and proposes to excavate and place fill
within the shallow 100-year floodplain fringe (i.e., outside the FEMA-defined 100-year floodway),
which includes immediately adjacent wetlands, on the west side of Lots 3, 4, 5, 8, 9, 10 and 11 of the
proposed development. This change to the 100-year floodplain limits would allow arrangement of
residential lots to meet the minimum net density required in R-1 zoning, reasonably sized building
envelopes, and to keep the floodplain outside of lot boundaries as requested by the City Floodplain
Administrator.
The proposed floodplain limits would become the watercourse setback line and would include all
immediately adjacent wetlands, upon final approval of the floodplain cut and fill by FEMA and the
City of Bozeman Floodplain Administrator. A separate relaxation, presented below as Relaxation
No. 5, is requested to allow placement of fill materials for non-exempt uses.
Wetland Buffer:
A relaxation of the 50-foot buffer width to 35 feet is requested to allow for reasonable building
envelopes and to achieve minimum net density required in R-1 zoning. The residential lots have
been arranged to ensure that all building envelopes would be outside of the proposed 35 ft
wetland buffer. The existing 50-foot wetland buffer and the proposed 35-foot wetland buffer
are shown in (58) Ex. 13 - Watercourse Setback.
In support of the proposed wetland buffer width reduction, the following measures are proposed,
incorporated into the project’s Design Guidelines, and will be enforced by the Shady Glen HOA:
1. The Building Design Guidelines will include a requirement, applicable to all lots within the
wetland buffer and backing up to existing wetlands, for these lot owners (Lots 3 through 14)
to route their roof drainage to rain barrels or on-property infiltration facilities, or to surface
drain the runoff to the front side of the lot where it will collect in the street and drain into
the underground storage and treatment facility located between Lots 6 and 7. This will
greatly reduce the volume of direct runoff toward the wetlands and will ensure effective
sediment removal. The underground storage and treatment facility will also greatly reduce
Shady Glen PUD – List of Relaxation Requests
Planned Unit Development Preliminary Plat
Page 6
October 21, 2022
peak runoff from most storm events, resulting in a slow release that will further protect
existing vegetation downstream of the pipe outfall.
2. The back yard areas of lots near the wetlands will be filled close to street level as part of the
infrastructure (street and utility) construction and before lots are developed. This will
create a fill slope at the back lot lines in the 20’ rear setback area. The slope will be planted
with native grasses that will remain in place during and after lot development and will be
protected by lot restrictions in the Building Design Guidelines. Storm runoff from top of
slope areas likely to be planted with lawn and other non-native plantings will drain as sheet
flow over the slope. The 15 to 30 feet or more of native vegetation will intercept, filter and
infiltrate the small amount of runoff from the highly pervious back yards, making for an
effective buffer to protect the undeveloped floodplain and wetland areas from sediment
and nutrients.
3. The HOA rules and regulations require homeowners to use phosphorous-free fertilizers in
their backyards and to not dispose of trash, grass clippings or yard waste within the wetland
buffer. Signage will be posted noting the restrictions of pets from the wildlife refuge,
playground area and pond viewing locations. The covenants will also include a requirement
for lot owners to install and maintain continuous fencing along the wildlife preserve.
4. Construction-related sediment will be intercepted during and after fill placement in
accordance with MPDES stormwater discharge requirements. This will include silt fence,
wattles or other filtration measures. The treatment measures will be closely monitored and
inspected after storm events and repaired immediately as needed to prevent sediment
transport into the wetlands.
The above measures are designed to offset the reduced buffer width by increasing protection of
wetlands by other, more effective means. Many of the above-proposed efforts are not typically
applied to a 50-foot buffer under standard subdivision code, so protection of wetlands will be equal
or greater than could be accomplished with a standard 50-foot wetland buffer minus the additional
requirements. The proposed reduction in wetland buffer width is preferable to additional impacts
and off-site mitigation in a wetland bank. It maximizes retention of existing wetlands in the area,
while protecting them with an adequate buffer combined with other measures as described above.
The US Army Corps of Engineers has issued a wetland fill permit coinciding with the proposed areas
of wetland impacts. The total impacts are less than 0.10 acres; therefore, wetland mitigation is not
required, and is not proposed. However, in an effort to provide conditions conducive to natural
enhancement and regeneration of wetland species, vegetation and sod mats will be carefully
removed prior to fill placement and re-planted within the floodplain excavation area noted in
Relaxation No. 5 below. This is a voluntary effort to reduce wetland impacts to zero and, over time,
might even result in a net increase in wetlands acreage on the site.
5. Section 38.410.100.A.2.d, Fill Placement for Non-Exempt Uses:
A relaxation is requested to allow placement of fill material, for non-exempt uses, within the East
Gallatin River’s 100-year floodplain. The proposed relaxation would be to place a small amount of
fill within the shallow floodplain fringe in two areas, to bring the western edges of Lots 3, 4, 8, 9, 10
and 11 out of the floodplain. The fill material would be excavated from an upland area west of Lot 5
Shady Glen PUD – List of Relaxation Requests
Planned Unit Development Preliminary Plat
Page 7
October 21, 2022
that is surrounded by floodplain, that is to say, an upland “peninsula” extending approximately
250 feet into the surrounding floodplain. The proposed excavation and fill are described below.
Excavation (West of Lot 5):
Excavate and remove existing soil from an upland area surrounded on three sides by a
“backwater” portion of the existing floodplain. The material being removed is an historic
artificial fill from an old railroad bed; this fill was placed prior to the current FEMA floodplain
mapping and report. The excavated area will be below the 100-year floodplain elevation,
creating additional flood storage capacity and a more naturally shaped floodplain boundary.
The area will then be planted with wetland vegetation (see Fill Placement below), becoming a
new part of the 100-year floodplain.
Fill Placement (West of Lots 3, 4, 8, 9, 10 and 11):
Existing wetland vegetation and seed beds will be carefully removed from all impacted site
wetlands (0.091 acres) and re-planted in the 1.3-acre excavation area west of Lot 5 along with
supplemental planting of additional wetland vegetation to fill the area. This is a voluntary
activity not required by the approved 404 wetlands permit (not mitigation). Following this, a
small sliver of fill will be placed along the east edge of the existing floodplain fringe.
Areas of fill placement are identified on (34) C-1 Site Grading Plan and Drainage. The combined fill
volume below the 100-year flood elevation (i.e., loss of flood storage capacity) will be less than the
excavation volume below the 100-year flood elevation west of Lot 5 (i.e., gain in flood storage
capacity). In other words, the proposed grading actually increases flood storage volume as
compared to existing conditions. This is a rare occurrence for this type of relaxation/variance
request in that the proposed plan to place fill within the floodplain would not negatively impact
flood conveyance or storage capacity.
A CLOMR permit for earth moving within the floodplain has been obtained from the Federal
Emergency Management Agency (FEMA) and is attached as Appendix D. A City floodplain permit
has been prepared and is attached as Appendix D. A wetlands delineation and 404 permit have
been completed and approved by the U.S. Army Corp of Engineers for the affected wetlands. The
delineation is included in this application as (55a) Aquatic Resources Delineation Map, and the
approved permit is included as Bridger Center 404 Permit.
6 Section 38.310.030, Table 38.310.030.A, Authorized Uses - Residential Zoning Districts:
The Applicant is requesting a relaxation to the authorized uses in R-1 zoning districts to allow
townhouses as a permitted use within the R-1 zoning district in order to develop two
deed-restricted affordable housing units. The units are proposed to be located on residential lots
15 and 16, as affordable home lots.
Although recent legislative action eliminated the City’s affordable housing requirement, the
Applicant wishes to voluntarily provide such housing as part of the Shady Glen PUD. The intent is
to meet the City’s requirement for affordable housing that was in effect prior to the 2021 change in
state law, by providing two (2) affordable units in response to the 1.6 units previously required per
Section 38.380.060 of the UDC.
In fact, Table 38.310.030.A in the version of the code in effect for this project states in a footnote
that two attached townhouse units are allowed in R-1 zoning when utilized to satisfy the
requirements of Section 38.380 (Affordable Housing). Unfortunately, the removal of this footnote
Shady Glen PUD – List of Relaxation Requests
Planned Unit Development Preliminary Plat
Page 8
October 21, 2022
(and Section 38.380) to meet state law works directly against an important City goal. The proposed
voluntary inclusion of affordable housing is a way for us to help achieve the City’s stated goal of
increasing affordable homes, and to create an even more exceptional neighborhood of benefit to
all.
The two townhouses are expected to be three-bedroom units similar in size and style to the single-
family residential units anticipated for the development, and similar to the existing condominiums
at The Links. The proposed lots are immediately adjacent to The Links, so will provide a seamless
and gradual transition between the two developments. The townhome concept is expected to be
aligned in character, massing, and quality to the adjacent structures in The Links as well as the
single-family homes of Shady Glen.