Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
003 Subdivision Preliminary Plat (PP) Table of Contents
Subdivision Preliminary Plat Application - Table of Contents Page 1 4515Valley Commons Drive, Suite 201, Bozeman Montana 59718 406.585.4161 406.585.6919 fax www.bechtlearchitects.com Shady Glen Subdivision Subdivision Preliminary Plat Application (PP) Table of Contents 10.22.2022 Section Description Documents 00 Notification Letter PP 01 Cover Page 02 Cover Letter 03 Table of Contents 04 Form PP 05 Project Team Outline 06 Shady Glen Narrative 07 Proposed Relaxations 08 Bozeman School Okay 09 Affordable Housing R-1 Townhome Example 10 Covenants, Conditions, and Restrictions (CCR’s) 11 Bylaws 12 Articles of Incorporation 12a Articles of Incorporation Cert Letter 13a-b Wetlands Review and Wetlands Delineation Memo 14a-e Phase I Environmental Site Assessment Report 15 Project Phasing Plan and Schedule 16 Noxious Weed Management Plan 17 Form N1 17a Form N1 Address of Adjacent Owners 18 Project Objective 19 City Floodplain Permit App 19a City Floodplain Address of Adjacent Owners 20 Parkland Outline 20a Parkland COB Resolution 4784 21 Supplements Narrative 22 Current Conditions and Proposed Remediation 23 Wildlife Habitat Narrative 24 Subdivision Signage 25 Traffic Study 26a-b Ground Water Dev., Water Rights & MT Well Logs Report 27a-b Storm Drainage Report and Storm Water Maintenance Plan 28 Design Regulations and Guidelines Draft 29 Fish Wildlife Park FWP - Statement Email 30 Road Maintenance Agreement the Links 31 Bridger Center 404 Permit_404 App_401 Cert 2021 Subdivision Preliminary Plat Application - Table of Contents Page 2 4515Valley Commons Drive, Suite 201, Bozeman Montana 59718 406.585.4161 406.585.6919 fax www.bechtlearchitects.com 32 Response to PA Engineering Comments 33-48 (moved to “drawings”) 49 Links Access Easement 10 ft 50-58 (moved to “drawings”) 59 Utility Easement to Boylan 60-61 (intentionally left open) 62 CLOMR approval and Community Acknowledgment Form 63 City floodplain permit app 64 Water rights on property 65 Bridger Center 404 Permit_404 App_401 Cert 2021 66-67 (moved to “drawings”) 68a (moved to “drawings”) 68b Exhibit 2A -Abandonment of Easement 69 Net Density Calculation 70 Shady Glen Subdivision Title Report 2022 71 Fire Department Support 72 Response to 06/24/22 Naiad wetlands comments 73 Shady Glen Water Report 74 Shady Glen Sewer Report Drawings 33a Site Plan 1 – Lot Layout 33b Site Plan 2 – Site and Utility Plan 34 C-1 Site Grading Plan and Drainage 35a Preliminary Plat - Certificate of Dedication 35b Preliminary Plat – Plan 35c Preliminary Plat – Easements) 36 Exhibit 7 Water Course Zones 37 Intentionally Left Open 38 Ex. 1 USGS Topo 39 Ex. 3 Existing Trails 40 Ex. 5 Land Uses 41 Ex. 4 Existing Utilities 41a-d Proposed Streets and Utilities 42 (intentionally left open) 43 Ex. 8 Const. Traffic 44 (intentionally left open) 45 Green Plan 46 Ex. 6 Affordable Home Location 47 (intentionally left open) 48a-b Parks and Trails 50a Fig. 1 Typ Street Section, The Links 50b Fig. 2 Typ Street Section, 42' ROW Shady Glen Lane 50c Fig. 3 Typ Street Section, 60' ROW Shady Glen Lane 51 Tract A1 Amended Plat J-200k 52a-h Shady Glen Preliminary PUD Landscape Plans 53 Ex. 9 (FEMA Map) 53a Ex. 10 (Floodplain Elevations) 54 Ex. 11 Emergency and Pedestrian Access – Offsite Area 55a Ex. A - Aquatic Resources Delineation Map 55b Ex. B Aquatic Resources Impact Subdivision Preliminary Plat Application - Table of Contents Page 3 4515Valley Commons Drive, Suite 201, Bozeman Montana 59718 406.585.4161 406.585.6919 fax www.bechtlearchitects.com 55c Ex. C Proposed Site Exhibit 56 Shady Glen - Boylan Road Existing System Wastewater Capacity 57 Ex. 12 Shady Glen Lane Cross Sections 58 Ex. 13 Watercourse Setback 59 (moved to “documents”) 60-61 (intentionally left open) 62-65 (moved to “documents”) 66-67 (Remove Ex. 1-1 & Ex. 1-2 from application) 68a Exhibit 2 Roadway Easement 69 (moved to “documents”) 71-79 (Remove Appendix A from application) 80 Ex. 14 - Offsite Access Improvements 81 Ex. 15 - Trail Connections