HomeMy WebLinkAbout006 C2.0 Civil Existing Conditions PlanBLOCK 14
5012
5013
5014
5015
501650175018
5019
5011
5019501850175016501550145013
5020 5021 5022
5
0
2
2502
1502050195018
5017501
650155014501350125011
50105010
5011
5012BLACKWOOD ROADCANTER AVENUEVICTORIA STREET
10' PRIVATE UTILITY EASEMENT
10' PRIVATE
UTILITY EASEMENT
10' PRIVATE
UTILITY EASEMENT
WINTERTHUR AVENUE10' PRIVATE UTILITY EASEMENT
37' LINEAR
PARK
(NOT IN
SCOPE)
PRIVATE UTILITIES (TYP.)
1.5" WATER SERVICE STUB W/ CURB STOP (TYP.)OSW OSWOSWOSW OSW OSW
OSW
OSW
OSW
OSW
OSW
OSWOSW
OSW OSWOSW35' STREET SECTION
1" WATER SERVICE STUB W/ CURB STOP (TYP.)
CURB INLET (TYP.)
6' SIDEWALK (TYP.)
ADA RAMP
CONCRETE SIDEWALK & BIKE PATH
35' STREET
SECTION
35' STREET
SECTION
49' STREET SECTION
4" SANITARY SEWER SERVICE STUB (TYP.)
FIRE HYDRANT
8" WATER MAIN STUB W/ CAP AND BLOW-OFF
8" SANITARY SEWER MAIN STUB
8" WATER MAIN STUB W/ CAP AND BLOW-OFF
8" SANITARY SEWER MAIN STUB
8" WATER MAIN STUB W/ CAP AND BLOW-OFF
8" WATER MAIN STUB W/ CAP AND BLOW-OFF
5017
5016
501
6
5
0
1
5
4" SANITARY SEWER SERVICE STUB (TYP.)
PROPOSED 30' PUBLIC ACCESS
AND UTILITY EASEMENT
PROPOSED 10' PEDESTRIAN
ACCESS EASEMENT PER PLAT
C2.0
PROJECT NO:
DATE:
ENGINEER:
REVISIONS
DATENO.DESC.
SHEET OF 12
22002
January 6, 2023
ELCCOTTAGES AT BLACKWOOD GROVESBOZEMAN, MONTANABLOCK 14 CIVIL SITE PLANTAOMNNA
RN GEO
S
EF
SI NA LROP EINECOTE
ETHAN L
No. 60593PE
ELICNES D01/06/2023
EXISTING CONDITIONS PLAN0 40'80'
SCALE 1" = 40'
N
3
NOTE: INSTALLATION OF SUBDIVISION INFRASTRUCTURE IN STREET
RIGHT-OF-WAYS ADJACENT TO THE PROJECT SITE WAS NOT COMPLETE AT
THE TIME OF PRODUCTION OF THIS PLAN SET. THEREFORE, ALL "EXISTING"
IMPROVEMENTS SHOWN HEREON ARE BASED ON THE APPROVED
BLACKWOOD GROVES INFRASTRUCTURE PLANS FOR PHASE 1 AND PHASE
2 OF THE SUBDIVISION, AND ARE NOT BASED ON A SURVEY OF THE
PROJECT SITE. (EXAMPLES OF THESE IMPROVEMENTS ARE: DRY UTILITIES
AND TRANSFORMERS WITHIN ADJACENT UTILITY EASEMENTS, BOULEVARD
SIDEWALKS, STREET LIGHTS, ETC.)
THE CONTRACTOR SHALL VERIFY THE LOCATION OF EXISTING UTILITIES
PRIOR TO CONSTRUCTION AND NOTIFY THE ENGINEER OF ANY
DISCREPANCIES.