Loading...
HomeMy WebLinkAbout005 C1.1 Civil Site Plan - OverallBLOCK 14 ELECUGEUGEUGEUGEUGEUGEUGEUGE UGE 8''W 8''W 8''W 8''W 8''W1''W1''W4''SS 4''SS 1.5''W 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS SS 1''W1.5''W1.5''W4''SS4''SS4''SS4''SS4''SS1''W4''SS4''SS1.5''W1.5''W4''SS1''W1''W8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''W 8''W 8''W 8''W 8''W 8''W 8''W SS4''SS4''SS1''W4''SS4''SS4''SS1''W1''W4''SS4''SS1''W4''SS4''SS1''W4''SS 4''SS 1.5''W 1.5''W1''W4''SSBLDG #1 BLDG #2 BLDG #10BLDG #3 BLDG #4 BLDG #9 BLDG #8 BLDG #5 BLDG #6 BLDG #7 BLDG #35 BLDG #36 BLDG #34 BLDG #33 BLDG #37 BLDG #32 BLDG #31 BLDG #38 BLDG #39 BLDG #40 BLDG #41 BLDG #42 BLDG #43 BLDG #44 BLDG #45 BLDG #30 BLDG #29 BLDG #28 BLDG #27 BLDG #26 BLDG #23 BLDG #24 BLDG #25 BLDG #22 BLDG #20 BLDG #19 BLDG #18 BLDG #17 BLDG #16 BLDG #21 BLDG #15 BLDG #14 BLDG #11 BLDG #13 4''SS 4''SS OSWOSW OSW OSW OSW OSW OSW OSW OSW OSWOSWOSW OSW OSW OSW OSW OSW OSW OSW OSW OSW OSWOSWOSWOSWOSWOSWOSWOSWOSWOSWOSWOSWOSWOSWOSWOSWOSW OSW OSW CO OSW OSWCO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO W VW V OSW CO8''STBLDG #12 8''ST8''STOSWOSW OSW OSW CO CO CO W VW V W V W V 8''ST WBO OSW BLDG #46BLDG #47 8''STBLACKWOOD ROADCANTER AVENUEVICTORIA STREET N89° 54' 43"E 353.01'N0° 15' 03"E 449.76'S0° 15' 03"W 451.85'N89° 44' 57"W 353.00' 40' (TYP.) 10' (TYP.) 15' (TYP.) 37' LINEAR PARK (NOT IN SCOPE) 10' FRONT SETBACK 10' PRIVATE UTILITY EASEMENT 10' PRIVATE UTILITY EASEMENT 10' FRONT SETBACK 10' PRIVATE UTILITY EASEMENT 10' FRONT SETBACK 40' (TYP.) PROPOSED 30' PUBLIC ACCESS & UTILITY EASEMENT PROPOSED 30' PUBLIC ACCESS & UTILITY EASEMENT SHEETS C3.0, C4.0, C5.0 SHEETS C3.0, C4.0, C5.0SHEETS C3.0, C4.0, C5.0SHEETS C3.0, C4.0, C5.0SHEETS C3.1, C4.1, C5.1 SHEETS C3.1, C4.1, C5.1SHEETS C3.1, C4.1, C5.1SHEETS C3.1, C4.1, C5.1WINTERTHUR AVENUEPROPOSED 30' PUBLIC ACCESS & UTILITY EASEMENT ROLL OFF CONSTRUCTION DUMPSTER (LOCATION SUBJECT TO CHANGE) CONSTRUCTION STAGING AREA (LOCATION SUBJECT TO CHANGE) X XXXXXXXXXXXXX X X SOIL STOCKPILE AREA (LOCATION SUBJECT TO CHANGE) FUTURE FUTURE VISION TRIANGLE (TYP.) BENCHMARK HYDRANT ARROW BOLT ELEVATION: 5012.86 C1.1 PROJECT NO: DATE: ENGINEER: REVISIONS DATENO.DESC. SHEET OF 12 22002 January 6, 2023 ELCCOTTAGES AT BLACKWOOD GROVESBOZEMAN, MONTANABLOCK 14 CIVIL SITE PLANTAOMNNA RN GEO S EF SI NA LROP EINECOTE ETHAN L No. 60593PE ELICNES D01/06/2023 PLAN SET OVERVIEW, NOTES & LEGEND0 40 80 FEET N 2 LOT 2 PROPERTY LINE (TYP.) 10' FRONT SETBACK 10' PRIVATE UTILITY EASEMENT LEGEND SUBJECT PROPERTY BOUNDARY ADJACENT PROPERTY BOUNDARY SETBACK EASEMENT WATER MAIN W F WATER VALVE WATER CURB STOP WATER BLOW-OFF FIRE HYDRANT FIRE SERVICE LINE 8''W WATER SERVICE LINEW F 8''W 8''SS 4''SS SANITARY SEWER MAIN8''SS 4''SS ST SANITARY SEWER SERVICE SANITARY SEWER MANHOLE SANITARY SEWER CLEANOUT STORM SEWER MAIN STORM MANHOLE (SOLID COVER) ST GAS ELEC CURB INLET STORM CATCH BASIN GAS LINEGAS ELEC COMM UNDERGROUND ELECTRIC LINE COMM UNDERGROUND COMMUNICATIONS LINE ELECTRIC TRANSFORMER / JUNCTION CAN TELEPHONE BOX CATCH CURB AND GUTTER STORM POND / SWALE CONTOUR LINE SPOT ELEVATION EXISTING PROPOSED DESCRIPTION OSWOSW W VW V WBOWBO DYH HY DSSSS COCO STST TT [00.00](00.00) 44004400 FINISH FLOOR ELEVATION"FFE" TOP OF WALL"TOW" TOP BACK OF CURB"TBC" FLOW LINE"FL" EDGE OF ASPHALT"EA" SIDEWALK"SW" HIGH-POINT"HP" LOW POINT"LP" TRAFFIC DIRECTION ARROW (NOT A PAVEMENT MARKING) SNOW STORAGE AREA SPILL CURB DROP CURB AND GUTTER BENCHMARK HYDRANT ARROW BOLT ELEVATION = 5012.86 FT (NAVD88) (NW CORNER OF INTERSECTION OF VICTORIA STREET & WINTERTHUR AVENUE) DEVELOPMENT ADDRESS LOT 1, BLOCK 14 BLACKWOOD GROVES SUBDIVISION, PHASE 2 SW 1 4, SEC. 24, T2S, R5E OF P.M.M. (ADDRESSES TO BE DETERMINED) GENERAL NOTES 1.ALL WORK SHALL CONFORM TO THE APPROVED CONSTRUCTION PLANS, AND THE FOLLOWING SPECIFICATIONS, WHICH ARE HEREBY INCORPORATED BY REFERENCE: -MONTANA PUBLIC WORKS STANDARDS & SPECIFICATIONS (MPWSS), SEVENTH EDITION (APRIL 2021) -CITY OF BOZEMAN D.S.S.P. (MARCH 2020), -CITY OF BOZEMAN MODIFICATIONS TO MPWSS (AUGUST 2017) 2.NO CHANGE OR MODIFICATION TO THE APPROVED PLANS AND SPECIFICATIONS SHALL BE MADE WITHOUT THE PRIOR WRITTEN APPROVAL OF THE ENGINEER AND THE CITY OF BOZEMAN ENGINEER. 3.THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY OF ANY FIELD CONDITION NOT CONSISTENT WITH THE APPROVED CONSTRUCTION PLANS. 4.THE CONTRACTOR SHALL BE RESPONSIBLE FOR FOR ACQUIRING ANY NECESSARY PERMITS FOR THE CONSTRUCTION OF THE PROJECT (STREET CUT PERMIT, ETC.). THE ENGINEER WILL ASSIST WITH PREPARING THE STORMWATER DISCHARGE ASSOCIATED WITH CONSTRUCTION ACTIVITY PERMIT (SWPPP). IF CONSTRUCTION DEWATERING IS ANTICIPATED, THE CONTRACTOR SHALL NOTIFY THE ENGINEER, AND THE ENGINEER WILL ASSIST WITH PREPARING THIS PERMIT. 5.THE CITY OF BOZEMAN AND THE PROJECT ENGINEER SHALL BE NOTIFIED AT LEAST 48 HOURS PRIOR TO THE BEGINNING OF CONSTRUCTION. 6.THE TYPE, SIZE, LOCATION, AND NUMBER OF ALL KNOWN UNDERGROUND UTILITIES IN THE PROJECT AREA HAVE BEEN SHOWN PER FIELD INVESTIGATION AND AVAILABLE UTILITY RECORDS, AND ARE APPROXIMATE ONLY. THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL UNDERGROUND UTILITIES PRIOR TO THE BEGINNING OF CONSTRUCTION. 7.PROPOSED DRY UTILITIES (ELECTRICAL, GAS, COMMUNICATIONS) SHOWN ARE SCHEMATIC. THE FINAL INSTALLED LOCATION OF DRY UTILITIES ARE TO BE COORDINATED WITH THE UTILITY SERVICE PROVIDER. 2.THE CONTRACTOR SHALL ASSUME SOLE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF PROJECT CONSTRUCTION, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY, AND ENSURING THE PROJECT MEETS OSHA REQUIREMENTS. 3.TRENCH BACKFILL SHALL BE TYPE A FOR ALL AREAS TO BE PAVED. 4.THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ANY NECESSARY TRAFFIC CONTROL FOR THE PROJECT. 5.THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING REGULAR CLEANING OF CONSTRUCTION MATERIAL THAT IS TRACKED ONTO CITY STREETS ADJACENT TO THE PROJECT SITE. GRADING NOTES 1.REFER TO ABBREVIATIONS IN LEGEND FOR SPOT GRADE DESCRIPTIONS. SPOT GRADES WITH NO ABBREVIATIONS ARE FINISH GRADE. 2.CURB AND GUTTER IS CATCH CURB UNLESS OTHERWISE INDICATED. THE ELEVATION DIFFERENCE FROM TOP BACK OF CATCH CURB TO CURB GUTTER FLOW LINE IS 0.45'. THE ELEVATION DIFFERENCE BETWEEN BACK OF DROP CURB AT PEDESTRIAN RAMPS AND GUTTER FLOW LINE IS 0.06'. THE ELEVATION DIFFERENCE BETWEEN TOP BACK OF SPILL CURB AND LIP OF CURB (EDGE OF ASPHALT) IS 0.57'. 3.PER INTERNATIONAL BUILDING CODE, FINISH GRADE SHALL SLOPE AWAY FROM BUILDINGS AT 5% MIN. SLOPE FOR 10'. IT IS UNDERSTOOD BY THE OWNER THAT THIS REQUIREMENT CANNOT BE MET IN ALL LOCATIONS ON THE PROJECT SITE DUE TO THE ORIENTATION OF THE PROPOSED BUILDINGS. IN LOCATIONS WHERE 5% SLOPE FOR 10' CANNOT BE ACHIEVED, STORM SWALES SHALL BE INSTALLED CENTERED BETWEEN THE BUILDINGS AS INDICATED IN THIS PLAN SET. PER INTERNATIONAL BUILDING CODE, THESE SWALES SHALL HAVE A MINIMUM SLOPE OF 2% WITHIN 10' OF THE BUILDINGS. 4.FINISH GRADE ALONG BUILDINGS SHALL BE 8" MIN. BELOW TOP OF FOUNDATION WALL IN LANDSCAPED AREAS. 5.ELEVATIONS OF CONCRETE WALKS AT BUILDING ENTRANCES TO BE WITHIN 1/8" OF FINISH FLOOR ELEVATIONS. 6.REFER TO ARCHITECTURAL PLANS FOR INTERIOR BUILDING ELEVATIONS. 7.THIS PROJECT IS LOCATED IN AN AREA OF SEASONAL HIGH GROUNDWATER. IT IS UNDERSTOOD THAT FOUNDATION CRAWL SPACES WILL BE PARTIALLY BACKFILLED PER ARCHITECTURAL AND STRUCTURAL PLANS TO MITIGATE THE RISK OF GROUNDWATER INTRUSION. WATER NOTES 1.ALL WATER SERVICES LINES LESS THAN 4" IN DIAMETER ARE TO BE TYPE K ANNEALED COPPER PIPE CONFORMING TO AWWA SPECIFICATION C800. ALL WATER SERVICES 4" IN DIAMETER OR LARGER ARE TO BE DUCTILE IRON PIPE. ALL SERVICE LINES TO BE INSTALLED PER C.O.B. STD. DWG. NO. 02660-6. 2.INSTALL DETECTABLE WARNING TAPE OVER ALL WATER MAINS AND SERVICES PER CITY STANDARDS. 3.INSTALL TRACER WIRE ON WATER MAINS PER CITY STANDARDS. 4.A MINIMUM OF 6.5' OF COVER SHALL BE PROVIDED OVER ALL WATER SERVICES FROM FINISH GRADE TO THE TOP OF PIPE. INSULATION SHALL BE PROVIDED OVER ANY PORTION OF THE WATER SERVICE WITH LESS THAN 6.5' OF COVER. 5.TAPPING SLEEVES AND SADDLES FOR WATER SERVICE & MAIN TAPS ONTO CITY WATER MAINS SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR. THE WET TAP TO THE EXISTING MAIN WILL BE MADE BY THE CITY OF BOZEMAN WATER DEPARTMENT. SANITARY SEWER NOTES 1.INSTALL DETECTABLE WARNING TAPE OVER ALL SEWER MAINS AND SERVICES PER CITY STANDARDS. 2.UNLESS OTHERWISE NOTED, ALL SANITARY SEWER SERVICES ARE TO BE SDR 26 PVC INSTALLED AT 14" PER FOOT MIN. SLOPE PER C.O.B. STD. DWG. NO. 02730-02 3.SANITARY SEWER SERVICE CONNECTIONS TO EXISTING SEWER MAINS ARE TO BE MADE WITH INSERTA TEES. THE CITY OF BOZEMAN SEWER DEPARTMENT SHALL MAKE ALL TAPS FOR NEW SEWER SERVICES CONNECTED TO EXISTING MAINS. 4.A MINIMUM OF 5' OF COVER SHALL BE PROVIDED OVER ALL SANITARY SEWER SERVICES FROM FINISH GRADE TO THE TOP OF PIPE. INSULATION SHALL BE PROVIDED OVER ANY PORTION OF THE SEWER SERVICES WITH LESS THAN 5' OF COVER. SITE INFORMATION LOT SIZE: 4.5866 ACRES ZONING: REMU BUILDING SETBACKS:FRONT:10' MIN, 15' MAX SIDE: 5' REAR:10' ACKNOWLEDGEMENT OF ACCESS REQUIREMENTS UNDER FEDERAL AND STATE DISCRIMINATION LAWS (ARM 23.301.902) THIS ACKNOWLEDGES THAT THE FOLLOWING PROJECT WAS DESIGNED WITH FULL KNOWLEDGE THAT THE CITY OF BOZEMAN BUILDING DIVISION WILL NOT REVIEW FOR COMPLIANCE WITH, NOR IS RESPONSIBLE FOR ENFORCEMENT OF THE FEDERAL AMERICANS WITH DISABILITIES ACT OF 1990, THE REHABILITATION ACT OF 1973, THE FAIR HOUSING AMENDMENTS ACT OF 1988, TITLE 49, CHAPTER 2, COMMONLY KNOWN AS THE MONTANA HUMAN RIGHTS ACT, OR OTHER SIMILAR FEDERAL, STATE, OR LOCAL LAWS THAT MANDATE ACCESSIBILITY TO COMMERCIAL CONSTRUCTION OR MULTIFAMILY HOUSING. LOT 1 PROPERTY LINE (TYP.) FUTURE CURB LINE, SIDEWALK AND SNOW STORAGE FOR LOT 2 DEVELOPMENT