Loading...
HomeMy WebLinkAbout018 310Permit Esl. l9d9 Conservation G A L L AT I.N Development May 21 2019 C O N S E R VAT I ON Self Government Y f D I S T R I CT Steve Moore 3661 Jagar Lane Bozeman, MT 59718 RE: 310 Application GD 22-19 PERENNIAL STREAM: Unnamed tributary of E. Catron Creek Dear Mr. Moore: The Gallatin Conservation District(GCD)received your 310 application on April 30,2019. The purpose of the 310 application is: The city is requiring that the road be relocated to conform to the current street grid and that 2 additional pedestrian crossings be installed across the relocated creek. Requesting to remove the existing culvert and replace it with a 30'culvert for pedestrian crossing,to install 123'of culvert for a road crossing,in still a second 30'crossing for a pedestrian crossing,and to install a sewer line with temporary impacts. Representatives from the GCD 310-team inspected the project site on May 8,2019. After a discussion and a review of the 310-permit application on May 16,2019,the GCD Board of Supervisors approved the project with modifications. Modification include: Embed pipe minimum 6". Import backfill of stream material and/or 3"minus for all culverts. Use 42"arch size. Match grade upstream and down while considering embedment. • Please require/include culvert plan and profile for each site/location,only wetland impacts were submitted with application. • No fish resting box necessary. Enclosed are two copies of Form 273 (310 Permit). Keep one copy for your records. The District recommends that you retain all information for current and future reference. The second copy is for the job site.The contractor must maintain a copy of Form 273 and any pertinent design information in his equipment while conducting all fieldwork to ensure your project is implemented according to the permit. REQUIREMENTS • Form 273(310 Permit):Please fill out and sign the bottom portion of one copy of the 310 Permit and return it to this office within 15 days.If we have not received the permit within that time,you will be in violation of the 310 Law and your permit will not be valid. • Please take pre-and post-photos of the project. • Completion Form: At the completion of the project,fill out the enclosed form, attach photos,and return to this office within 15 days of the completion of the project. Other permits may be needed for your project.A 310 Permit does not give an individual permission to do a project,only to do a project in a specific manner once all other permits are satisfied.This permit is only for the work specified above. If the scope of the work changes,you must apply for a new permit. All individuals undertaking activities specified in a 310 Permit are encouraged to obtain accurate cost estimates for projects and ensure water rights are in order before starting any work. If you have any questions or concerns,please contact me at 406-282-4350. Sincerely, Becky Clements District Administrator Gallatin Conservation District Enclosures PO Box 569 Manhattan,MT 59741 406-282-4350 www.gallatincd.org 310 Permit Work Completion Form 310 PERMIT INFORMATION 310 Permit#GD 22-19 Legal Description:Township: 2S, Range: 5E, Section: 23 Landowner:Greg and Susan Gianforte, David and Susan Barbisan Applicant:Steve Moore Agent: Barbara Vaughn Stream: Unnamed Tributary of East Catron Creek Approved Project: May 16, 2019 Permit Expiration Date: May 16, 2020 REQUIREMENTS • The Applicant/Landowner is required to return this form to the Gallatin Conservation District when work is completed or the permit expires. • Include pre-and post-photos of the project. Date work completed Note:If work is not completed,provide explanation below Explanation Signature: _ _ Date: Contact Information (Required for Follow-up Inspection) Name: Address: Phone/Cell#:. Email: Gallatin Conservation District 120 S 5th Street, PO Box 569 Manhattan MT 59741 406-282-4350 Email: admin@gallatincd.org Faun)73(Rey,0710-11S7) 310 PERMIT Decision Date Application Number STREAMBED AND LAND PRESERVATION ACE(310 Law)Supervisors'Decision 5/1612019 GD 22-19 Note: Landowner permission,easements or other federal,state,or local permits,licenses,special use permits,or authorizations may be required before construction of the project. It is the duty of the holder of this permit to determine which are necessary and obtain them prior to construction of the project Name of Applicant Business Name Address Steve Moore J 3661 Jagar Lane City State Zio Name of Perennial Stream Bozeman MT 59718 Unnamed tributary of E.Catron Creek Section Township Range Supervisor's Decision r23 2S 5E Approval with modifications Pro osed Activity The city is requiring that the road be relocated to conform to the current street grid and that 2 additional pedestrian crossings be installed across the relocated creek. Modifications Embed minimum 6",import/backfill 6"of stream material and/or 3"for all culverts. Use arch,not 42". Match grade upstream and down, while considering embedment. Please require/include culvert plan and profile for each site/location,only wetland impacts were submitted with application. No fish resting box necessary. - - Work may not commence on a project for True Waiver of 15- False Recurrent Permit Expiration Date Permit Transmittal Date 15 days after receipt of this decision day Waiting Permit unless district has checked the waiver x Period 05/1612020 05/2112019 box. SUPERVISORS'SIGNATURES: r, j --------------------------------------(cut here)------ .-.------------- .............. .. ................... The applicant must agree to abide by the conditions of this permit by checking the appropriate box,signing below,and returning this form to the district office within 15 days.GD 06.19 ❑ I hereby agree to proceed with the project in accordance with the approved application and will allow follow-up inspection. ❑ I understand the project as proposed has been denied,and I may resubmit my application with modifications. ❑ I hereby agree to proceed with the project in accordance with the modifications contained herein, and will allow follow-up inspection. If the applicant disagrees with the supervisors' decision and wishes to formally resolve the dispute, the applicant must check the box below, sign, and return this form to the district within 5 working days. ❑ I disagree with the supervisors'decision and hereby request arbitration. Signature of Applicant:___ Date: Fc;ni Zia(R,(-1v.W/101/9/) 310 PERMIT Decision Date Application Number STREAMBED AND LAND PRESERVATION ACE(310 Law)Supervisors' Decision 5116/2019 1 GD 22-19 Note: Landowner permission,easements or other federal,state,or local permits,licenses,special use permits,or authorizations may be required before construction of the project. It is the duty of the holder of this permit to determine which are necessary and obtain them prior to construction of the project Name of Applicant Business Name Address Steve Moore T 3661 Jagar Lane , Ci State zipName of Perennial Stream Bozeman EE� MT 59718 Unnamed tributary of E.Catron Creek Section Tow Ran a Su rvisor's Decision 23 2S 5E Appro,yal with modifications Proposed Activity The city is requiring that the road be relocated to conform to the current street grid and that 2 additional pedestrian crossings be installed across the relocated creek. Modifications Embed minimum 6", import/backfill6"of stream material and/or 3"for all culverts. Use arch,not 42". Match grade upstream and down, while considering embedment. Please require/include culvert plan and profile for each site/location,only wetland impacts were submitted with application. No fish resting box necessary. Work may not commence on a project for True Waiver of 15- False Recurrent Permit Expiration Date Permit Transmittal Date 15 days after receipt of this decision day Waiting Permit unless district has checked the waiver X Period 05/16/2020 05/21/2019 box. SUPERVISORS'SIGNATURES: /� --� r' --------------------------------------(cut here).......................... .. . .. .... ... .. ....... ...... ..... . The applicant must agree to abide by the conditions of this permit by checking the appropriate box,signing below,and returning this form to the district office within 15 days.GD 06.19 ❑ I hereby agree to proceed with the project in accordance with the approved application and will allow follow-up inspection. ❑ I understand the project as proposed has been denied, and I may resubmit my application with modifications. ❑ I hereby agree to proceed with the project in accordance with the modifications contained herein,and will allow follow-up inspection. If the applicant disagrees with the supervisors' decision and wishes to formally resolve the dispute, the applicant must check the box below, sign, and return this form to the district within 5 working days. ❑ I disagree with the supervisors'decision and hereby request arbitration. Signature of Applicant: Date: .. w� SHORT-TERM WATER QUALITY STANDARD FOR TURBIDITY RELATED TO To- Montana Department of CONSTRUCTION ACTIVITY -ENVIRONMENTAL QUALITY (318Authorization) Dear Applicant: This 318 authorization is the result of your recent application for a 310 permit from your local Conservation District or a 124 permit from Montana Fish,Wildlife and Parks. This authorization is valid for the time frame noted on your permit. This is not your 310 or 124 permit and no construction activity should occur until you have received a valid 310 or 124 permit as well as any other permits that apply to this proposed construction activity. This authorization is the result of an Operating Agreement between the Montana Department of Environmental Quality (DEQ), and Montana Fish,Wildlife and Parks (FWP). The applicant agrees to the comply with the conditions stated below, as well as other conditions listed in the 310 or 124 permit issued for this project. Signatures of the applicant and FWP are required to validate this authorization. 1. Construction activity in or near the watercourse are to be limited to the minimum area necessary,and conducted so as to minimize increases in suspended solids and turbidity that could degrade water quality and adversely affect aquatic life outside the immediate area of operation. 2. The use of machinery in the watercourse shall,be avoided unless absolutely necessary. 3. All disturbed stream banks and adjacent areas created by the construction activity shall be protected with erosion control measures during construction.These areas shall be reclaimed with appropriate erosion control measures and revegetated to provide long-term erosion control. 4. Any excess material generated from this project must be disposed of above the ordinary high water mark, in an area not classified as a wetland, and in a position not to cause pollution of State waters. 5. Clearing of vegetation will be limited to that which is absolutely necessary for construction of the project. 6. This authorization does not authorize a point source surface water discharge. MPDES permit is required for said discharge. 7. Open cut creek crossings will not be allowed in flowing water. Stream water must be diverted around the open cut area(pump, flume etc.) 8. The applicant must conduct all activities in full and complete compliance with all terms and conditions of all permits required for this activity issued pursuant to the Montana Natural Streambed and Land Preservation Act (310 permit),the Stream Protection Act(124 permit)the Federal Clean Water Act(404 Permit), any MPDES permits for dewatering or storm water control in the construction area and any valid Memorandum of Agreement and Authorization(MAA)negotiated for this activity. The FWP representative has determined that this project is within the scope of the programmatic Environmental Assessment prepared by DEQ and FWP for the issuanceof narrative turbidity standards. Date:_51111 r FWP Representative's Signature Applicant's Signature Name and location of project: /, 1 D l� C`^1''Zr C r1" J- l