A. General Project Description
This report will give an overview of the proposed wastewater collection system for the
development of the Icon Apartment Homes at 2131 Graf multi-unit residential development Lot
2 of minor sub 235 located in S23, T20S, R05E P.M.M, located south of Stucky Road and north
of Graf Street in Bozeman, MT. The zoning for the 25.99 acre area is listed as R-4, residential
high density. The proposed apartment buildings are designed as three (3)-3 plex (Type A), nine
(9)-32 plex (Type B), and five (5)-32 plex (Type C) for a total of 457 units in the residential
development. The improvements for Phase 1 of the development are anticipated to be
constructed during the Fall of 2020.
Included in this report is a description of the proposed wastewater collection system and design
parameters. Once the wastewater system is constructed and approved, the system will become a
part of the City of Bozeman (C.O.B.) system. The following references were used in the
wastewater facilities design and capacity analysis:
a. COB Design Standards and Specifications Policy, 2017. Addendum #7
b. COB Modification to Montana Public Works Standard Specifications (MPWSS)
c. City adopted MPWSS and adopted Addenda
d. COB Wastewater Facility Plan, 2017
e. MDEQ Circular No. 2
f. City of Bozeman Zoning Map
The procedures and parameters outlined in the COB Design Standards and Specifications Guide
were used in the design of the sewer infrastructure for the proposed development.
B. Capacity Analysis
The proposed wastewater collection system consists of 2,714 linear feet (0.51 miles) of new 8”
sewer main and will provide service to the multi-unit residential development. The effluent
generated from the proposed apartment buildings will be collected by the wastewater collection
system and ultimately flow north to Lantern Lane and west to an existing COB SSMH.
The wastewater demands from the proposed subdivision were estimated based on a flow per capita
basis, which provided a more conservative flow than a per zoned acre basis. (COB Table V-1
specifies an average daily flow rate of 1,950 gal/ac-day for R-4 zoning, resulting in 49,901 gpd =
25.59ac x 1,950 gal/ac-day).
The proposed sewer mains have been sized to flow at no more than 75-percent of full capacity at
peak hour conditions of full build out, and a Manning coefficient of 0.013 was used for PVC pipe.
The average daily flow is based on the number of units, 2.11 residents per unit, and 89 gallons per
capita per day, the latter two values based on COB design standards:
൬457 units ∗ 2.11
residents
unit ∗ 89
gallons
capita/day ൰ = 85,820 gpd
An approximate population for the project at full build out is calculated as:
457 units ∗ 2.11
residents
unit = 964 persons
This is a more realistic population value compared to utilizing the 10.4 units per acre (Table V-1
from COB design standards) applied to 25.99 acres, which only results in 570 persons.
This equivalent population can be utilized to determine a peaking factor:
൬𝑄௫
𝑄௩
൰ =18 +𝑃.ହ
4 +𝑃.ହ =18 +.964
.ହ
4 +.964
.ହ = 3.81
(P = Population/thousands)
Based on a total population of 964 people, a peaking factor of 3.81 was calculated. The peak flow
rate anticipated from the development based on an average daily flow of 85,820 gallons per day
is:
Peak Flow Rate = (85,820 gpd x 3.81) = 326,974 gpd
= 227 gpm
= 0.51 cfs
Additionally, an infiltration flow of 3,839 gpd (150 gal/acre/day x 25.59 acres) has been added to
the flow, resulting in a total flow of 330,813 gpd (0.51 cfs).
The sewer main size for the development will be an 8-inch, based on minimum required pipe size
and designed at a 0.40% slope. An 8-inch PVC sewer main at 0.40% slope has a capacity of 0.64
cfs at ¾ pipe depth, which has adequate capacity for the proposed peak flow of 0.52 cfs effluent
generated from the site. Calculations are included in the end of this report.
In addition, two of the proposed buildings will utilize the existing 8” sewer main in Graf St. The
total number of units using this sewer is 64 units. The resultant flow rate is 12,019 gpd, or 0.02
cfs. The peak flow rate is 45,792 gpd, or 0.07 cfs.
C. Proposed Collection System
PVC pipe meeting COB specifications will be used for the sewer mains. The effluent from the
development will drain into a proposed 8-inch diameter sanitary sewer main via 4-inch or 6-inch
sewer services. The effluent in the 8-inch wastewater collection system will then flow north to
Lantern Drive and west to an existing manhole and existing 8” sewer main in Lantern Drive. The
maximum manhole spacing will be 400 feet for the 8-inch main. Manholes will be constructed
according to COB specifications. Sewer services will be 4-inch to 6-inch PVC installed at 2%
minimum grade. Sewer services will connect into the main with in-line gasketed wyes. The sewer
main will maintain a minimum separation of 10-feet horizontally and 18-inches vertically from
any proposed or existing public water mains.
D. Downstream Capacity Analysis
The sanitary sewer mains were designed in conformance with the City of Bozeman Wastewater
Improvement Plan. The sewer effluent from the proposed development will flow into the existing
Meadow Creek Trunk Sewer which was designed for this property. A capacity letter from a City
Engineer will be required prior to DEQ approval of the system.
E. Conclusion
As outlined above, a proposed 8-inch sanitary sewer collection system serving the residential
development has the capacity for the effluent generated from the subdivision. The wastewater
sewer collection system was designed on a conservative premise for future development. This
project will require the approval of the City of Bozeman Engineer and MDEQ.