Loading...
HomeMy WebLinkAboutC GroundwaterPreliminary Plat Application Saccoccia Subsequent Minor Sub 407C Groundwater A complete narrative in regards to the utilization of the existing stormwater detention pond that was built with the Saccoccia Minor Subdivision / LOWE’s HIW improvements in 2006 is included in the pre-application narrative in the Documents folder, Engineer Review, Karl Johnson, Application #21212 – Saccoccia Subsequent Minor Sub of 407CPA, Stormwater, #2. This proposed subsequent minor subdivision will be utilizing this existing detention pond and therefore, groundwater monitoring is not necessary.