PRELIMINARY GEOTECHNICAL INVESTIGATION REPORT
TRACT 9 BURRUP ANNEX
EAST FRONTAGE ROAD
BOZEMAN, MONTANA
PREPARED FOR:
Mr. Rob Lateiner
Virga Capital
PO Box 1070
Bozeman, MT 59771
Rawhide Engineering,Inc. August 12,2019
RRawhide
E Engineering Inc.
August 12, 2019
Virga Capital
PO Box 1070
Bozeman, MT 59771
SUBJECT: Preliminary Geotechnical Investigation Report
Tract 9 Burrup Annex
East Frontage Road
Bozeman, Montana
Dear Mr. Lateiner:
This report presents the results of our preliminary geotechnical investigation for the Tract 9
Burrup Annex located on East Frontage Road in Bozeman, Montana. The site location and
boring locations are shown on the Vicinity/Site Map shown on Plate 1 at the end of this report.
This site is proposed to have future commercial property.
Our recommendations contained in this report are based on exploratory borings, laboratory
testing, engineering analysis and preparation of this report. The recommendations required to
design foundations, parking lot section design and construction, and utility installation are
contained in the attached report. These conclusions and recommendations, along with
restrictions and limitations on these conclusions, are discussed in the attached report.
We appreciate this opportunity to be of service to you, and look forward to future endeavors. If
you have any questions regarding this report or need additional information or services, please
feel free to call the undersigned. 'pNTA vl
Sincerely, •* ROBERTWAYNE '*
RAWHIDE ENGINEERING, INC. KUKES
0pk)
cis; •�C ...SEG����.•.
Jason A. Frank Flo �?NY1d.f4 esI P.E.
Principal Principal
Enclosures: Report (1 hard copy, 1 pdf)
Rawhide Engineering, Inc. August 12,2019
TABLE OF CONTENTS
PAGE
INTRODUCTION ...........................................................................................................................1
ProjectDescription..............................................................................................................1
Scopeof Service.................................................................................................................1
Authorization ......................................................................................................................1
Professional Statements and Limitations............................................................................1
PROPOSED CONSTRUCTION......................................................................................................2
FIELDINVESTIGATION .................................................................................................................2
LABORATORYTESTING ..............................................................................................................2
Moisture Content Tests........................................................................................................3
SoilClassification Tests.......................................................................................................3
Resistivityand pH Tests......................................................................................................4
SUBSURFACE SOILS AND GROUNDWATER............................................................................4
RECOMMENDATIONS...................................................................................................................4
Excavations ......................................................................................................................4
Material .................................................................................................................5
Placementand Compaction ....................................................................................5
FOUNDATIONS........................................................................................................................5
ShallowFoundations.................................................................................5
StructuralFill..................... ...........................................................................................6
Compaction Requirements...................................................................................................7
CONCRETESLAB-ON-GRADE.....................................................................................................7
SITEDRAINAGE ............................................................................................................................8
APPENDICES
A Plates
August 12,2019
PRELIMINARY GEOTECHNICAL INVESTIGATION REPORT
TRACT 9 BURRUP ANNEX
EAST FRONTAGE ROAD
BOZEMAN, MONTANA
INTRODUCTION
Project Description
This report is to determine the subsurface soils on this site and provide preliminary
recommendations for future development of commercial property. The project also includes
utilities and parking areas. The new buildings will be on East Frontage Road in Bozeman,
Montana as shown on the site map, Plate 1 at the end of this report.
Scope of Services
Our scope of services for this project consisted of the following:
1. Drilling 5 exploratory borings to a depth of 15 feet below existing site grades.
2. Laboratory testing to determine the characteristics of the site soils for use in
engineering design.
3. Engineering analysis to aid in the design of structure foundations and structural
pavement sections.
4. Provide information as to the existing groundwater conditions at the time of our
exploration.
5. Provide recommendations for earthwork and construction on the site.
This study did not include evaluations of site seismicity, liquefaction, faulting, or other potential
geologic or environmental hazards. This study did not include a groundwater study or the
design of a dewatering system.
Authorization
Authorization to proceed with our work on this project was provided on July 18, 2019.
Professional Statements and Limitations
Recommendations presented in this report are governed by the physical properties of the soils
encountered in the exploratory borings, laboratory testing, current groundwater conditions, the
project layout and design data described in the following proposed construction section.
The recommendations presented in this report are based on exploratory boring locations shown
on the site map. Variations in soils may exist between the explored locations and the nature
and extent of soil variations may not be evident until construction occurs. If subsurface
conditions other than those described in this report are encountered and if project design and
layout is substantially altered from the information in this report, Rawhide Engineering should be
notified so that recommendations can be reviewed and amended, if necessary.
This report has been prepared for design purposes for our client and specifically for this project
in accordance with the generally accepted standards of practice at the time the report was
written. No warranty, either expressed or implied, are intended or made.
Other standards or documents referenced in any given standard cited in this report, or otherwise
relied upon by the authors of this report, are only mentioned in the given standard; they are not
incorporated into it or "included by reference," as that latter term is used relative to contracts or
other matters of law.
PROPOSED CONSTRUCTION
It is our understanding that this project will include future commercial development with utility
installation and parking lot construction. Structural loads and foundation type will be designed at
a later date if the project proceeds on this site.
FIELD INVESTIGATION
In order to determine and evaluate the subsurface conditions across the site, 5 exploratory
borings were completed using a drill rig equipped with hollow and solid stem augers provided by
Rawhide Engineering. Boring depths were 15 feet below the existing ground surface. The
location of the borings shown on the Vicinity/Site Map were dimensioned from property corners
with the site map provided. This location should be considered accurate only to the degree
implied by the method used.
The field investigation was under the direct control of an experienced member of our
geotechnical staff who logged the soil conditions for each boring. Samples were obtained from
bulk samples during the boring excavation. The bulk samples were examined by field
personnel, logged and sealed to prevent moisture loss prior to laboratory testing. After
completion, the groundwater level in the boring was recorded and the borings were backfilled
using the excavated material.
The boring logs included at the end of this report are labelled B-1 through B-5. A boring log
legend and a description of the Unified Soil Classification System used to identify the soils is
included with the boring logs.
LABORATORY TESTING
A laboratory testing program was utilized to provide the necessary data for engineering analysis
of this project. The testing was used to evaluate the index and engineering properties
specifically for the conditions encountered during our yield exploration. The following program
was used for this project.
Moisture Content Tests—ASTM D2216
Moisture content tests were conducted on selected samples obtained from the site. These tests
were used to aid in identifying the current soil conditions and aid in classifying the soils.
Moisture content tests are shown on the boring logs.
Soil Classification Tests—ASTM D422, D1140, D4318, D2487 and D2488
In order to classify the soils according to the Unified Classification System, soil gradations and
Atterberg Limits test were conducted on selected samples. The results of this testing is shown
below and on the boring logs.
Gradations and Atterberg Limits Tests
Percent Passing
Sieve Size B-3 @ 4.5-6.0'
3/8" 100
No. 4 98
No. 10 96
No. 20 90
No. 40 86
No. 80 78
No. 200 70
Plastic Index 12.7
Unified Lean Clay with
Classification Sand CL
SITE CONDITIONS
The site is located on the East Frontage Road in Bozeman, Montana. The site is bordered by
the East Frontage Road on the north, Interstate 90 on the south, and developed and
undeveloped commercial property on the remaining sides. The site is currently covered by
vegetation. This parcel slopes slightly to the north. Drainage consists of infiltration and runoff to
topographical low areas.
SUBSURFACE SOILS AND GROUNDWATER
The soil conditions encountered on the site generally consist of a layer of vegetated topsoil
which was 1.0 feet in depth and was underlain by a layer of lean clay with sand to depths
ranging from 7.5 to 8.5 feet. Beneath the lean clay with sand layer we encountered clayey
sand with small gravel to depths ranging from 7.5 to 11.5 feet below existing site grades.
Beneath this layer we encountered gravel with sand to the depths explored of 15 feet below
existing site grades. The lean clay with sand layer was soft to very soft and has a moderate
plastic index. The gravel with sand was dense and was granular non-plastic. Groundwater was
encountered in the borings at the depths ranging from 7.5 to 8.5 feet during our exploration in
July 2019. The groundwater levels rose in the borings to levels of 3.1 to 4.4 feet during drilling
operations.
RECOMMENDATIONS
Prior to construction, the topsoil with vegetation layer should be stripped and removed from the
site. It appears about 1.0 feet can be used as a reasonable estimate for average depth of
stripping. Prior to placing fill for the future building pads, the building pad area should
be scarified, moisture conditioned and compacted to 95% of ASTM D698. Excavations
resulting from removal operations should be cleaned of all loose material and widened as
necessary to permit access to compaction equipment.
Excavations
The contractor is ultimately responsible for the safety of workers and should strictly observe
federal and local OSHA requirements for excavation shoring and safety. All temporary slopes
should comply with OSHA requirements for Type A soils. During wet weather, runoff water
should be prevented from entering excavations.
It appears that excavation for footings and utility trenches can be readily made with either a
conventional backhoe or excavator in the native soil materials. We expect the walls of the
footing trenches in the near surface fine grained soils and lower gravel with sand to stand near
vertically without significant sloughing. If trenches are extended deeper than five feet or are
allowed to dry out, the excavations may become unstable and should be evaluated to verify
their stability prior to occupation by construction personnel. Shoring or sloping of any deep
trench walls may be necessary to protect personnel and provide temporary stability. All
excavations should comply with current OSHA safety requirements for Type A soils. (Federal
Register 29 CFR, Part 1926).
Backfills for trenches or other excavations within pavement areas should be compacted in six to
eight inch layers with mechanical tampers. Jetting and flooding should not be permitted. We
recommend all backfill be compacted to a minimum compaction of 97% of the maximum dry
density as determined by ASTM D698. The moisture content of compacted backfill soils should
be within 2% of the optimum. Poor compaction in utility trench backfill may cause excessive
settlements resulting in damage to the pavement structural section or other overlying
improvements. Compaction of trench backfill outside of improvement areas should be a
minimum of 90% relative compaction.
Material - Pipe bedding shall be defined as all material within six inches of the perimeter
of the pipe. Backfill shall be classified as all material within the remainder of the trench.
Material for use as bedding shall consist of clean, granular materials, and shall conform
to requirements for bedding material listed in the Standard Specifications.
Placement and Compaction- Pipe bedding shall be placed in thin layers not exceeding
eight inches in loose thickness, and conditioned to the proper moisture content for
compaction.
All other trench backfill shall be placed in thin layers not exceeding eight inches in loose
thickness, conditioned to the proper moisture content, and compacted as required for
adjacent fill. If not specified, backfill should be compacted to at least 97% relative
compaction in areas under structures, utilities, roadways, parking areas, concrete
flatwork, and to 90% relative compaction in undeveloped areas.
Foundations
At this time this is a preliminary report and the size and design of commercial buildings is not
known. The upper lean clay with sand soils are soft to very soft and any heavy commercial
building will have to be designed with deep foundations which extend down to the gravel with
sand layer. Drilled concrete piers, helical piers or micro piles will have to extend 12 to 15 feet
below existing site grades to provide adequate bearing for a commercial building. Structural
loads are not available for this project. Based on our exploration we would recommend an
allowable bearing capacity of 3,000 psf for the native gravel with sand layer. Settlements will be
calculated later when the type of building and structural loads are known.
Structural fill, if required, shall be placed in layers, moisture conditioned, and compacted to 98%
of ASTM D698. Exterior continuous footings should be 3.5 feet in depth to provide frost
protection. Interior column footings should be embedded 1 foot in depth for confinement. Wall
foundation dimensions should satisfy the requirements listed in the latest edition of the
International Commercial Code. Reinforcing steel requirements for foundations should be
provided by the design engineer.
The allowable bearing pressures, indicated above, are net values, therefore, the weight of the
foundation and backfill may be neglected when computing dead loads. Allowable bearing
pressures may be increased by one-third for short-term loading such as wind or seismic.
Resistance to lateral loads in the upper lean clay with sand layer may be calculated using an
allowable passive equivalent fluid unit weight of 210 pounds per cubic foot and an allowable
coefficient of friction of 0.38 applied to vertical dead loads. Both passive and frictional
resistances may be assumed to act concurrently. An allowable active equivalent fluid pressure
of 40 pounds per cubic foot may be used.
The International Building Code (IBC) site class for this project is Class C.
This site will require a dewatering plan for utility installation. Designing a dewatering
plan was not part of our scope of services and should be designed by a competent
engineer with experience designing dewatering systems and their effects on adjacent
structures.
Structural Fill
Structural fill will be used beneath the footings and should consist of dense gravel with sand and
conforming to the following gradation and plastic index.
Sieve Size Percent Passing
3 Inch 100%
No. 4 25-65%
No. 200 <20%
Plastic Index 12 or less
All structural fill shall be placed in eight inch loose lifts and uniformly moisture conditioned to
within +/-2% of optimum moisture content. The contractor shall provide and use sufficient
equipment of a type and weight suitable for the conditions encountered in the field. The
equipment shall be capable of obtaining the required compaction in all areas, including those
that are inaccessible to ordinary rolling equipment.
Compaction Requirements
The following table lists the compaction requirements for structural fill, foundation backfill, utility
trench backfill and street subgrade preparation.
COMPACTION REQUIREMENTS
Structural Fill Beneath Foundations 98% of ASTM D698
Backfill Against Foundations 95% of ASTM D698
Utility Trench Backfill 97% of ASTM D698
Building Pad Construction 95% of ASTM D698
Concrete Slab-on-Grade Construction
Prior to constructing concrete slabs, the upper six inches of slab subgrade should be
scarified, moisture conditioned to within 2% of optimum, and uniformly compacted to at
least 95% of maximum dry density as determined by ASTM D698. The building pad may be
constructed using on site soils or imported fill and then covered by the base course.
Scarification and compaction will not be required if floor slabs are to be placed directly on
undisturbed compacted structural fill.
All concrete floor slabs should have a minimum thickness of six inches due to the equipment
loads on the slab. Slab thickness and structural reinforcing requirements within the slab should
be determined by the design engineer. At least eight inches of crushed base aggregate
should be placed beneath slab-on-grade floors to provide uniform support. The
aggregate base should be compacted to a minimum of 95% relative compaction.
In floor slab areas where moisture sensitive floor coverings are planned, an impermeable
membrane (e.g. 10-mil thick polyethylene) should be placed over the base course to reduce the
migration of moisture vapor through the concrete slabs. The impermeable membrane should be
installed as required by the flooring manufacturer. Current literature from the American
Concrete Institute and the Portland Cement Association recommend that the vapor barrier is
placed on top of the crushed base course and the concrete is placed directly on the vapor
barrier.
Site Drainage
Final elevations at the site should be planned so that drainage is directed away from all
foundations and concrete slabs. Parking areas should be designed to drain surface water off
the sight and away from structures. According to the International Commercial and Residential
Code, structures should be designed to have 6" of fall in the first 10 feet away from the
structure. If this cannot be attained, drainage swales need to be constructed to drain water
away from the structure and off of the site. Down spouts with 6 foot extensions should be used
for structures.
APPENDIX A
Plates
r
4•
4 _
® 5 o
Boring Log LOGGED BY: J. Frank
0 Vb. PROJECT: Tract 9- Burrup Annex DRILL METHOD: Hollow Stem
East Frontage Road DRILLER: R. Kukes
R Rawhide CLIENT: Rob Lateiner DATE: 7/30/19
E 11 Engineering Inc. LOCATION: Bozeman, Montana ELEVATION:
SAMPLES LABORATORY TESTIN
0
w Q c x p
BORING NUMBER: 1CZ
ca `" = MATERIAL DESCRIPTION AND COMMENTS 3 °-
Topsoil with Vegetation and Organics
1
2 CL Lean Clay with Sand - Dark Brown/Gray, Moist, Soft to
Very Soft, Moderate Plastic Index
3
4 — Final Groundwater Level at 3.5 Feet After 10 Minutes
5 2
2 So 1.0
6 2
7
8 Initial Groundwater Level at 8.0 Feet
9 SC Clayey Sand with Some Small Gravels - Dark Gray, Wet,
Loose/Medium Dense, Low Plastic Index
10 2
1 So 0.6
11 4
GP Gravel with Sand - Brown/Gray, Wet, Dense,
12 Granular Non-Plastic
13
14
15 Boring Ends at Approximately 15.0 Feet Depth
16 Groundwater was Encountered at 8.0 Feet
17
18
19
20
6871 King Ave. West, Suite G1K, Billings, MT 59106 (406) 969-5305 Fax:(406) 969-5307
Boring Log LOGGED BY: J. Frank
PROJECT: Tract 9 - Burrup Annex DRILL METHOD: Hollow Stem
R! East Frontage Road DRILLER: R. Kukes
ERawhide CLIENT: Rob Lateiner DATE: 7/30/19
Engineering Inc. LOCATION: Bozeman, Montana ELEVATION:
SAMPLES LABORATORY TESTIN
0
0
F BORING NUMBER: 2 7
(In _ o .. = .. x n. >
C
0cc
MATERIAL DESCRIPTION AND COMMENTS U 3 °-
Topsoil with Vegetation and Organics
1
2 CL Lean Clay with Sand - Dark Brown/Gray, Moist, Soft to
Very Soft, Moderate Plastic Index
3
4 Final Groundwater Level at 4.4 Feet After 10 Minutes
2
5 1 So 0.8
6 2
7
8 Initial Groundwater Level at 8.5 Feet
9 SC Clayey Sand with Some Small Gravels- Dark Gray, Wet,
10 2 Loose/Medium Dense, Low Plastic Index
1 L 0.3
11 1
12 GP Gravel with Sand - Brown/Gray, Wet, Dense,
13 Granular Non-Plastic
14
15 Boring Ends at Approximately 15.0 Feet Depth
16 Groundwater was Encountered at 8.5 Feet
17
18
19
20
6871 King Ave. West, Suite G1 K, Billings, MT 59106 (406) 969-5305 Fax:(406) 969-5307
Boring Log LOGGED BY: J. Frank
PROJECT: Tract 9 - Burrup Annex DRILL METHOD: Hollow Stem
East Frontage Road DRILLER: R. Kukes
R Rawhide CLIENT: Rob Lateiner DATE: 7/30/19
E Etigineering Inc. LOCATION: Bozeman, Montana ELEVATION:
SAMPLES LABORATORY TESTINC.
0
F BORING NUMBER: 3 o ..
� >
.= U o U o E O
L E o o UCa c =
n `n MATERIAL DESCRIPTION AND COMMENTS 3 c
Topsoil with Vegetation and Organics
1
2 CL Lean Clay with Sand - Dark Brown/Gray, Moist, Soft to
Very Soft, Moderate Plastic Index
3
4 / Final Groundwater Level at 4.1 Feet After 10 Minutes
5 3
2 So 22.4 12.7 70.3 1.4
6 2
7 Initial Groundwater Level at 7.5 Feet
8 SC Clayey Sand with Some Small Gravels- Dark Gray, Wet,
9 Loose/Medium Dense, Low Plastic Index
4
10
7 GP Gravel with Sand - Brown/Gray, Wet, Dense, D 0.4
1 1 9 Granular Non-Plastic
12
13
14
15 Boring Ends at Approximately 15.0 Feet Depth
16 Groundwater was Encountered at 7.5 Feet
17
18
19
20
6871 King Ave. West, Suite G1K, Billings, MT 59106 (406) 969-5305 Fax:(406) 969-5307
Boring Log LOGGED BY: J. Frank
PROJECT: Tract 9 - Burrup Annex DRILL METHOD: Hollow Stem
East Frontage Road DRILLER: R. Kukes
R Rawhitle CLIENT: Rob Lateiner DATE: 7/30/19
E 11Engineering Inc. LOCATION: Bozeman, Montana ELEVATION:
SAMPLES LABORATORY TESTIN
0
>,
a> x
0
F BORING NUMBER: 4 2 o
�. Uo � o
3 — U o
cc
�s
MATERIAL DESCRIPTION AND COMMENTS U 3 cc N
Topsoil with Vegetation and Organics
1
2 CL Lean Clay with Sand - Dark Brown, Moist, Soft to
Very Soft, Moderate Plastic Index
3 Final Groundwater Level at 3.1 Feet After 10 Minutes
4
2 5
1 So 1.1
6 2
7 Initial Groundwater Level at 7.5 Feet
8 SC Clayey Sand with Some Small Gravels- Dark Gray, Wet,
9 Loose/Medium Dense, Low Plastic Index
10 5
6 GP Gravel with Sand - Brown/Gray, Wet, Dense, D 0.6
11 8 Granular Non-Plastic
12
13
14
15 Boring Ends at Approximately 15.0 Feet Depth
16 Groundwater was Encountered at 7.5 Feet
17
18
19
20
6871 King Ave. West, Suite G1K, Billings, MT 59106 (406) 969-5305 Fax:(406) 969-5307
Boring Log LOGGED BY: J. Frank
PROJECT: Tract 9 - Burrup Annex DRILL METHOD: Hollow Stem
East Frontage Road DRILLER: R. Kukes
R Rawhide CLIENT: Rob Lateiner DATE: 7/30/19
E Engineering Inc. LOCATION: Bozeman, Montana ELEVATION:
SAMPLES LABORATORY TESTIN
BORING NUMBER: 5 N 5 .. Q
o a a
0 0 U
ZD MATERIAL DESCRIPTION AND COMMENTS 3 c
Topsoil with Vegetation and Organics
1
2 CL Lean Clay with Sand -Gray to Dark Brown, Moist, Soft to
Very Soft, Moderate Plastic Index
3
4 Final Groundwater Level at 3.9 Feet After 10 Minutes
5 1 So 1.3
1
6
7 Initial Groundwater Level at 7.0 Feet
SC Clayey Sand with Some Small Gravels - Dark Gray, Miost to
8 Wet, Loose/Medium Dense, Low Plastic Index
9 GP Gravel with Sand - Brown/Gray, Wet, Dense,
10 7 Granular Non-Plastic
7 D 0.2
11 9
12
13
14
15 Boring Ends at Approximately 15.0 Feet Depth
16 Groundwater was Encountered at 7.5 Feet
17
18
19
20
6871 King Ave. West, Suite G1K, Billings, MT 59106 (406) 969-5305 Fax:(406) 969-5307
BORING LOG LEGEND
MATERIAL DESCRIPTION
Soil Pattern USCS Symbol USCS Classification
FILL Artificial Fill
GP or GW Poorly/Well graded GRAVEL
GM Silty GRAVEL
GC Clayey GRAVEL
GP-GM Poorly graded GRAVEL with Silt
GP-GC Poorly graded GRAVEL with Clay
SP or SW Poorly/Well graded SAND
SM Silty SAND
SC Clayey SAND
SP-SM Poorly graded SAND with Silt
SP-SC Poorly graded SAND with Clay
SC-SM Silty Clayey SAND
ML SILT
MH Elastic SILT
CL-ML Silty CLAY
CL Lean CLAY
CH Fat CLAY
PCEM PARTIALLY CEMENTED
- CEM CEMENTED
BDR BEDROCK
CONSISTENCY
Cohesionless Soils Cohesive Soils Cementation
VL Very Loose So Soft MH Moderately Hard
L Loose F Firm H Hard
MD Medium Dense S Stiff VH Very Hard
D Dense VS Very Stiff
VD Very Dense
SAMPLING
SPT
Shelby Tube
NR No Recovery
Bulk Sample
Water Table
RRawhide
E Engiireerin, Inc.
UNIFIED SOIL CLASSIFICATION SYSTEM
Crltwb for AssignnIng Group Syrnbolls and Grp ftnm Usftg y TOSW Sop CtssaHk adon
syn" Group None
Coam G shed Soft Gravels Cloth Gravels Cu a 4 and 1 f Cc t r GW N1aDVedod graver
More pare 50% "'RIP ell Motu Cyn 50%of eeeto Use than 5%&Me Cu c 4 and/or 1>CC>r GP Poorly Waded Waver
6ad1on nita6ro0 on
an No.200 slow No,4 slow Gravels sah Fbnss Ftnes classify as ML or W4 GM Silly grswr"
Moro stun 12%rhos` F6en ctustly as CL or CH Gc Clayey graver"
Sands Ckmn Sands Cu a 5 and 1 s Cc s 34 Sw we0•graded sand'
50%or morn of nears Less than 5%&we Cu<6 arrd1w 1>Cc>3` SP Poorly Graded send
dove Sands vAh Rhea Flnoa dusgy as ML at MH SM Silly same-
Mom Moro am 12%linos° Hrm iffy as CL or CH SC Orley sand`^'
Fln G d Solls Sam and Clays Incrpttre PI>7 and plots on or above A'&W CL Lean ctoy""
50%or more passes ft U*Al&n1t less ttlen 50 PI<4 or plots below A lino' MIL SarAm
No.2W sign
orgaNe UOenw ttm5-oven drled <0.75 OL dsy,,L"
Uqutd Bel-not dried Organic dft*A—
sftwwctmI norganlc PI plots on or aDove'A-line CH Far day""
UVA Sb Burt SO or more PI plats below A-Orm MH Baft Sc r"
oroark LIQW b*-Oven Mo0 <0.75 OH Omank drtlap
LkILM Itrrdt-not&W Organic citf+"
HV*orglu to soft Prlrrurlly organic martar.dark In colony,and organic odor PT Post
At3ased an the mefertal paastnp the 34n.(7 mm)slaw NN rhea are organic,add IMM organic flaw'to amp name.
elf field sample contatlod cobbloa or boukk ns,or both.add'Wth cobblos n N*0 contelns 215%gravel,add'*M graver Io group name.
or boy k%m or boor'to group name. tf Atlerborg LY&plot In shaded area,toll Is a CL-ML.s ft day.
cRrs mm as to 12%rye.rwpdm Aml reyenhn1r AW4W wrAosided K ff*w oont hu 151s 29%pk a No.20o.add ti le+send-or' m
gravel vdM sip.GW-GC wellVaded gravel wfA day.GP-04 poorly WavW. vrfid~Is prodwrinant.
gra0od gravel wkh sk GP-GC Poorly Ws0ed gravel with day L tf 3W ooraahn 2 30%plus W 2W pre0orntnan2y sand.add
°sands wM 5 to 12%Ones requite dual symbols: SW3M we&Wvd%I -may to group name,
sand vAM sip.SWSC wetlgadad sand wHh day.SP•SM Poorly graded r If soli oontstrss 2 30%phrs No.200.predondrawAly gravel,
sand vetch sift.SP-=poorly graded sand vAb day add*gravet:y'b group name.
acki O 080rchm CC O .( ;.f "M 2 4 and plots on or above A thee.
Dw x Do o PI<4 or plots below'A'Ono.
r If soa conbdu x 15%a".add V tQe sand'to group name. PPI plots an or above A line.
ON!Yeas dassly as CL-MtL use dual syrrrboi GC-GM,or SC SM. o PI plots bebw'A'fine.
so
For ctasstficatlon of Rao-gratned
sods end 4ne•grahwd fracCon
50 of eoa>rse•prahfOd sous
Elm d-A-•bw -*v
HodtontY al P1.410 LL.2e 5
40 thou P6&73 01.20)
horn0 1 v•tea �.
Vor5a1 a LL.1e to PIo7.
30 man pu"(LL•a)
20 ,
MH or OH
10
7 --
4 - r NL or OL
0
0 10 >s 20 30 40 5o eo 70 80 ao 1p0 110
UCHAD LIMIT(I-L)
--.L
Rip Rawhide
`� Engineering lnc