HomeMy WebLinkAbout01 Project Narrative
2304 N. 7TH AVENUE | SUITE L | BOZEMAN, MT 59715 | (406) 587-2781
Professional Consulting Engineers and Land Surveyors
Equal Opportunity Employer | www.hyaliteeng.com
October 14, 2020
City of Bozeman- Community Development Department
PO Box 1230
Bozeman, MT 59771
Attn: Danielle Garber, Associate Planner
RE: East Frontage Commercial Development
Site Plan Application – Pad Ready Site
Dear Danielle,
The purpose of this submittal is to provide you with the site plan application for the above referenced
project, which is a vacant lot located on the Frontage Road just east of I-90 in Bozeman. The intent of the
site plan is to create a “pad-ready” site that is more favorable for potential buyers/developers, while still
incorporating the wetland impacts as well as the stormwater components.
An MDT approach will be constructed provide access to the lot for the future development. The exact use
of the proposed building is not yet known, though the approach will be designed to meet the demands of
an office-use development and will accommodate a WB-40 intermediate semi-trailer. A 24” CMP culvert
will be installed under the approach for stormwater conveyance down the existing roadside ditch. An MDT
approach permit has been applied for as well, to coincide with this application, but no official
determination from MDT has been received as of the date of this letter.
Concept Review Comments:
The following are responses to City staff comments dated September 30, 2019 during the Concept Review
phase of this project.
Planning:
1. See attached site plan application for the property within M-1 zoning.
2. There will be no architectural design submitted with this application. The use of the proposed
building is not yet known. The preliminary site design and landscape drawings are attached with
this submittal.
3. Crosswalks will be installed when the site is paved.
4. The exact location of the trash enclosure and utility meters are not yet known as those will be
developed with the final site plan application.
5. As stated above, the use of the building is unknown and architectural drawings have not been
created yet.
6. Parking lot and street frontage landscaping are detailed in the attached landscape drawings.
Details are provided in the civil drawings showing the proposed detention pond cross section, as
well as the typical cross section for the biofiltration swales.
7. A photometric plan will not be provided at this time, as the parking/building area will only be built
up with gravel to provide a potential buyer a “pad-ready” site.
8. A wetland delineation map has been included with this submittal. The map illustrates the entire
wetland area and the wetland area that will be impacted with the construction of the pad-ready
site.
Letter to City of Bozeman
Re: East Frontage Road – Site Plan Application
Bozeman, MT
October 14, 2020
Page 2 of 4
L:\193190\_Site Plan Application\City Cover Letter.doc
Engineering:
1. All wetland information/mapping is included with this submittal, see the ‘5.0_Wetland &
Watercourse Adherence’ document.
2. The wetland delineation map, report & City municode referenced responses are provided with this
application.
3. The median striping on the Frontage Road restricts us from moving the proposed approach any
further west. Coordination with MDT is still on-going as to where the final approach location will
be, so once more is known on the MDT side of things, final approach approval/deviation with the
City will be supplied.
4. The geotechnical report is included, showing the in-situ soils on site as well as the depth to
groundwater. We have also been monitoring the groundwater levels on-site using the 6 monitoring
wells on site installed with the geotechnical borings, see the also included groundwater monitoring
data. No underground stormwater facilities are anticipated.
5. As the building use is not yet known, an accurate sewer demand rate cannot be estimated.
Therefore, at this time, a sewer service will not be constructed but will be accounted for with any
future site plan submittal.
6. The sewer main on the east side of the lot is within the property boundary. A 20’ utility easement
was granted for the construction of the sewer main, see the as-built plans of SID 615.
7. Curb and gutter will be installed around the parking lot perimeter, once a final site plan layout is
developed.
8. Estimated peak hour traffic demands are not included with this application, due to a use/land plan
not being known at this time. Once a use is determined, those numbers will be submitted with the
future site plan application to determine if a TIS is necessary.
Project Narrative:
1. General Information
1.1 Project Owner/Developer
The existing property is owned by Frontage Road LLC. Owner contact information is below:
Frontage Road LLC
PO Box 1070
Bozeman, MT 59771
Project Team:
Civil
Hyalite Engineers
2304 N. 7th Avenue, Suite L
Bozeman, MT 59715
Landscape Architect
Red Barn Montana
3084 Thorpe Road
Belgrade, MT 59714
Letter to City of Bozeman
Re: East Frontage Road – Site Plan Application
Bozeman, MT
October 14, 2020
Page 3 of 4
L:\193190\_Site Plan Application\City Cover Letter.doc
1.2 Project Location
The project is located just east of the I-90 interchange on the Frontage Road. There is currently no
approach or public access to the vacant lot. A vicinity map of the project site is included on the cover
sheet of the Development Review drawings.
1.3 Project Schedule
The construction for the “pad-ready” site is anticipated to commence in the spring of 2021, with
completion slated for fall of 2021. The timeline for the building construction is not yet known, as the
exact use and building footprint has not been decided.
2. General Site Information
2.1 Legal Description:
A parcel of land in the SE ¼, SE ¼ of Section 8, Township 2 South, Range 6 East, Principal Meridian
Montana, Gallatin County, Montana.
2.2 Site acreage is 4.39 acres.
2.3 The site along with adjoining properties to the east and west are zoned M-1 (Light Manufacturing).
2.4 There are no existing structures on the property.
3. Site Access
3.1 Currently there are no access points to the site.
3.2 An MDT approach application has been submitted and coordination with MDT will commence to
construct a single approach onto the site.
3.3 Location and extent of the street vision triangles for the proposed approach are shown on the
preliminary Entry Detail design drawing (C5.0).
4. Site Design
4.1 The site will be built up to create a property that is ready for building construction. A portion of the
wetlands near the western property boundary will be undisturbed and will remain in its current state.
Preserving a continuous area of wetlands will provide the site with a natural aesthetic (see the included
Wetland & Watercourse document).
4.2 The site grading is designed such that if the building were to be constructed and parking area paved,
the stormwater infrastructure will provide the necessary capacity/conveyance to appropriately control all
site runoff.
4.3 A low-impact stormwater design was used to tie the entire site into the wetland area that will be
preserved. All runoff from the parking area will be routed toward curb cuts that discharge into
biofiltrations swales, with the runoff ultimately ending up in a detention pond that utilizes the existing
wetland topography & treatment.
Letter to City of Bozeman
Re: East Frontage Road – Site Plan Application
Bozeman, MT
October 14, 2020
Page 4 of 4
L:\193190\_Site Plan Application\City Cover Letter.doc
4.4 Per the landscape plans prepared by Red Barn Montana, the parking lot will be screened from both I-90
to the south and the Frontage Road to the north. Landscaping around the building and within curb islands
is subject to change according to the future use of the constructed building and accompanying parking
spaces needed.
I hope that the enclosed information allows you to provide comment on this project. If for any reason you
have any questions, or need any additional information during the review of this project, please feel free
to give me a call at 587-2781 or send an email to bmegaard@hyaliteeng.com.
Sincerely,
______________________________
Brett Megaard, PE
Project Manager
Cc: File: 193190
Owner