Loading...
HomeMy WebLinkAboutNWX Master Site Plan MOD 22200 Approved10/11/22 22200 NWX MSP MOD 10/11/22 22200 NWX MSP MOD NWX MSP 19440 MOD request Revised 09-07-2022 Summary The purpose of this modification request is to update the initial NWX Master Site Plan, Park Master Plan to reflect changes that have occurred in more detailed site design and planning efforts within each phase of NWX since the initial approval of the Master Site Plan as noted below: • Reflect B2-M zoning to include residential uses within Phase 1 and as part of the NWX Icon Apartments project. B2-M lands are now included in the parkland dedication and tracking table. Additional parkland has been added to Park P3 West to help offset the development of the B2-M lands as a residential use. • As allowed by the Park Master Plan and City code, Cash-in-Lieu (CIL) is being requested for the additional dedication required by the addition of the B2-M lots. With NWX already providing a significant amount of open space within Homestead Park, supplemented by smaller parks within individual phases, the use of the CIL can provide a larger community benefit by utilizing those funds to help support completion of the nearby Bozeman Sports Park. Additional Improvements-in-Lieu will be applied within Homestead Park, enhancing the quality of materials, available amenities and user experiences within the Park. • Further define phasing of public park lands within NWX to provide City staff a better means for reviewing individual applications for each development phase for compliance with the Park Master Plan. Revised estimated phasing locations are indicated on revised drawings along with parkland in Parks P1, P2, and P3 to be developed with each phase. • Reflect updated overall densities for projecting parkland dedication requirements. Original net densities were estimated based on overall site area. More refined net densities are now known within each phase allowing a more accurate estimate of required dedication. Updated densities are included in the revised parkland dedication and tracking tables. • Address loss of parkland in Park P2 to storm detention pond by re-designing developed area in Park P2 East, adding additional parkland in Park P2 West. Revised information includes: • Revisions to sheet MSP 1-04 • New sheet MSP 1-04a • Revisions to sheet MSP 1-05 • Revised calculations for parkland dedication requirement (see sheets MSP 1-04 and 1-04a) • Park P2 Mitigation Exhibit 10/11/22 22200 NWX MSP MOD NWX MSP Park Maintenance Plan 05-16-22 General All public park lands within NWX shall be maintained by the City of Bozeman per City standard maintenance practices. Maintenance shall be completed for all areas dedicated as public parks to include traditional developed parks, riparian and wetland corridors in within Parks P1, P2 and P3 and any future parks that contain watercourse corridors. Stormwater ponds within public park lands to be maintained per City standard requirements. Recommendations for specific components of the naturalized corridors are included below. Any future parks located along Baxter Creek shall also follow park maintenance recommendations outlined in this document. Weed Control Weed control to be completed to within 3 feet of the top of bank along the watercourse setback. Any noxious weeds on site should be identified once park dedication is complete. Noxious weeds to be managed as recommended in the 2017 Montana Noxious Weed Management Plan, or as dictated by other local codes. https://agr.mt.gov/_docs/NWTF-docs/MT-Noxious-Weed-Management-Plan--Update-2017.pdf Pre-Construction Weed Control The existing onsite weed population should be treated before earthwork and construction begins. During Construction Weed Control & Best Management Practices • Earthmoving equipment will be washed to remove mud and seeds PRIOR to arriving onsite. • All disturbed areas and stockpiles will be managed to prevent weeds from going to seed. • The amount of bare ground and length of time ground is bare will be minimized. • Only certified weed-free material is used for erosion BMPs (fiber roll barriers, sediment logs, straw bales, erosion blankets, etc.). Schedule Weed monitoring and control within naturalized park areas should be completed two times per year during the growing season. Trash Removal Seasonal trash removal (quarterly) is recommended within all watercourse setback areas and naturalized park edge buffers. Trash control prior to seasonal mowing operations is recommended in order to avoid un-desirable materials and chemicals from entering the water channel and soil. Pollinator Habitat Seasonal mowing practices to be scheduled to allow full bloom time for native plant species within the watercourse setback and other naturalized planting areas in order to minimize negative impacts to pollinator habitat and connectivity. If mowing is required it should be completed after seeding of 75% of plant species is complete. Mowing height should be 6 inches or greater in order to facilitate establishment of native plants. General All public park lands within NWX shall be maintained by the City of Bozeman per City standard maintenance practices. Maintenance shall be completed for all areas dedicated as public parks to include traditional developed parks, riparian and wetland corridors in within Parks P1, P2 and P3 and any future parks that contain watercourse corridors. Stormwater ponds within public park lands to be maintained by HOA (s). Recommendations for specific components of the naturalized corridors are included below. Any future parks located along Baxter Creek shall also follow park maintenance recommendations outlined in this document. 07-27-2022 10/11/22 22200 NWX MSP MOD Watercourses and Watercourse Setbacks Public Parks within NWX include lands along Baxter Ditch. City to coordinate with Farmers Canal Company as required for any maintenance that immediately impact the ditch, watercourse banks or water flows. City maintenance practices shall not impact conveyance of water rights and water movement within the water channel. Any obstructions to flows shall be removed as soon as identified and removed off-site. City shall identify preferred access locations for any ditch inspections or maintenance. No piled grass clippings or other landscape maintenance materials shall be placed within watercourse setbacks or within watercourse channel banks. Any required mowing within watercourse setbacks shall not occur in areas over 3:1 slopes or within 3 feet of watercourse top of bank. Do not mow in areas that are too wet that will cause rutting and compacted soils within watercourse setbacks. Best Management Practices for erosion control should be practiced within the watercourse setbacks and any damage repaired within one season to avoid further loss of ground cover. Any significant erosion repairs that impact watercourse channel top of bank or centerline alignment to be coordinated with Farmers Canal Company. Ditch company operations and maintenance shall not negatively impact developed parklands or water course setbacks. Ditch maintenance operations shall not create any dangers to public or City park maintenance staff. If ditch spoils are required to be placed on site, location of placement and timing of any haul off to be coordinated with the City. Any damages to developed park areas by Farmers Canal Company shall be mitigated to an acceptable level by City staff. Farmers Canal Company Post Office Box 10686 Bozeman, Montana 59719 Wildlife Habitat Nests, dens or other critical wildlife resources identified during park maintenance shall remain undisturbed until coordinated with appropriate agencies to determine appropriate course of action to protect habitat. Water Quality Best management practices to maintain water quality shall be implemented in any locations that drain directly into the watercourse. Pesticide and chemical use should be evaluated to confirm it will not have a negative impact on water quality within the watercourse. Resources Best practices references for maintenance of naturalized landscapes: http://dnrc.mt.gov/divisions/forestry/docs/assistance/practices/smzfullcopy.pdf https://www.nrcs.usda.gov/wps/portal/nrcs/mt/water/resources/nrcs144p2_057479/ https://www.xerces.org/pollinator-conservation/habitat-restoration/management 10/11/22 22200 NWX MSP MOD NORTHWEST CROSSING | PARKLAND DEDICATION REVISED: 07 SEPTEMBER 2022 Planning Area Lot/Block(s) Zoning Net Developed Residential Area (AC) Units/AC DU/Ac Estimated Total Land Required Estimated CILP/IILP Required*** Unrestricted Park (AC) 20' Wetland Setback (AC) 30' Wetland Buffer (AC) Wetland (AC) Stormwater (AC) ** ROW (AC) Total Park (AC) A 6,7,8,9,10,11,12 B2-M 0.00 0.00 B 1 B2-M 2.62 0.03 0.00 0.00 0.00 B 2,3,4,5 B2-M 0.00 0.00 C 13 B2-M 7.1 0.03 0.00 0.00 0.00 D,E 14 REMU 5.26 0.03 4.00 0.63 $63,239 0.00 Park P3 East Park 03 PARK 0.63 0.55 0.87 1.16 0.16 0.09 3.46 14.98 0.63 $63,239 0.63 0.55 0.87 1.16 0.16 0.09 3.46 F, G, H, I, J Restricted 1, 2, 3, 4, 5 PARK 26.89 1.93 1.93 Park P3 East (credit from Icon Apts) Park 03 PARK 0.07 0.07 Park P1 East Park 01 PARK 0.40 0.27 0.58 0.23 0.46 0.00 1.94 Park P2 East Park 02 PARK 0.83 0.14 0.49 0.48 1.38 0.14 3.46 26.89 3.23 $323,287 3.23 0.41 1.07 0.71 1.84 0.14 7.40 S, T, U Restricted 13, 14, 15 PARK 13.26 0.29 0.29 Park P1 West (credit from Phase 5)Park 01 PARK 0.30 0.38 0.60 0.23 0.19 0.06 1.76 Park P3 West Park 03 PARK 1.00 0.49 1.02 1.16 0.00 0.09 3.76 13.26 1.59 $159,419 1.59 0.87 1.62 1.39 0.19 0.15 5.81 P, Q, R Restricted 7 (portion of), 11, 12 PARK 7.70 0.42 0.42 Park P2 West Park 02 PARK 0.50 0.36 0.54 1.16 0.31 0.09 2.96 7.70 0.92 $92,574 0.92 1.72 3.18 3.71 0.50 0.09 3.38 K, L, M, N, O Restricted 6, 7 (portion of), 8, 9, 10 PARK 4.60 0.00 Park P1 West Park 01 PARK 0.55 0.38 0.60 0.23 0.19 0.06 2.01 4.60 0.55 $55,304 0.55 0.38 0.60 0.23 0.19 0.06 2.01 67.43 6.93 $693,822 6.93 3.25 6.02 5.93 2.79 0.52 22.05 6.93 6.93 $693,822 ** Stormwater detention within Parks is calculated to include both dedicated temporary and permanent stormwater easements and estimated stormwater areas required for future phases. Where 20' wetland setback overlaps with stormwater detention, 20' setback area is included in stormwater area calculation. *** Based on $2.30/SF as of July 2022, final cost per SF TBD at Final Plat Notes: 1. Phasing indicated on plans is conceptual and subject to change. 2. Potential available land credits are shown conceptually only based on preliminary assessment of timing of phases. Any land credits available at time of next application may be used as a credit by that application. PHASE 3 Phase 3 Subtotal Phase 4 Subtotal PHASE 5 PHASE 4 Phase 5 Subtotal TOTAL Total Land Required/Provided (AC) Total CILP/IILP Required *Note: Phase 1 Plat includes 2.62 acres of B2-M zoned property in Lot 1 to be developed as multi-family residential. Remaining 26.894 acres of B2-M to be developed as commercial. PHASE 1/Icon Apartments * PHASE 2 Phase 2 Subtotal Phase 1 Subtotal NWX Parkland Requirements and Dedication - Master Plan Estimated Parkland Dedication - Master Plan REVISED 07/26/2022 Phasing Key Map MSP 1.5MSP 1.04a BAXTER CREEKP2 P3 HAVENWOOD DRIVEROSA WAYDAYSPRING AVENUETWIN LAKES AVENUETOUCHSTONE LANE WILDWOOD LANE B D C F G J I H K L M O N Q P S T U R BRI ARWO O D L A N E A HARVEST PAR K W A Y WE L L S P R I N G DRIVE PHASE 1 ABIGAIL LANEwest Lot 14 west west east east east P1 PHASE 2 PHASE 4 PHASE 5 PHASE 3 Lot 1 Lot 2 Restricted Lot 1 Restricted Lot 5 Stormwater Tract 1 Stormwater Tract 2 Restricted Lot 3 Restricted Lot 4 Restricted Lot 2 Restricted Lot 15 Restricted Lot 14 Restricted Lot 13 Restricted Lot 7 Restricted Lot 8 Restricted Lot 9 Restricted Lot 10 Restricted Lot 6 Restricted Lot 12 Restricted Lot 11 Lot 3 Lot 5Lot 4 Lot 7 Lot 6 Lot 13 Lot 8 Lot 9 Lot 10 Lot 11Lot 12 70’ PUBLIC ACCESS EASEMENT PARKLAND DEDICATION 10/11/22 22200 NWX MSP MOD NORTHWEST CROSSING | PARKS, OPEN SPACE & TRAILS FRAMEWORK REVISED: 07 SEPTEMBER 2022 100 0 200 SCALE: 1” = 200’ 400 NORTHBAXTER CREEK PARK PROVIDED The Homestead Park boundary includes lands which meet the City’s standard requirements for linear and neighborhood parks, and additional areas of wetlands, wetlands buffers and stormwater detention. A breakdown of which lands are used to meet park dedication requirements is included below. The Master Site Plan documents 6.93 acres of qualifying park land. Remaining qualifying park land deficiency will be achieved through further park land dedication or improvements-in-lieu of park land. Additional parks will be identified and located during subsequent platting and site plan processes to meet total park dedication requirements. Additional parks shall provide a diverse set of amenities to support a high quality of life for neighborhood residents. Developed amenities within parks will be consistent with the PROST Master Plan recommendations for neighborhood, linear and pocket parks. Through on-street and off-street trails, NWX’s park system will be easily accessible to residents and visitors, providing access to Homestead and additional parks within a 5-minute walk (1/4 mile) of all areas in the community. Parking and Connectivity On-street parking adjacent to parks will be provided per City requirements, while still encouraging walk-to and bike-to use of the community’s parks. With NWX’s proximity to the Bozeman Sports Park, NWX’s parks will be focused on spaces that will support passive and active daily recreation, leisure activities and community gathering rather than programmed sports. Park locations and designs should enhance the site’s natural resource values while providing quality nature-based recreation, play and leisure opportunities in addition to traditional park amenities. See sheet MSP 1.05 for road frontage calculations. Maintenance Park maintenance responsibility will fall to the Parks Division upon acceptance of parkland dedication (easement or deed) and park staff acceptance of improvements. Phasing Potential phasing is noted on the plan. Sequencing of phases dependent on phasing of overall development and subdivision review of individual planning areas. City shall review and approve individual park designs through the subdivision and site plan review process. Planning Area Lot/Block(s) Zoning Net Developed Residential Area (AC) Units/AC DU/Ac Estimated Total Land Required Estimated CILP/IILP Required*** Unrestricted Park (AC) 20' Wetland Setback (AC) 30' Wetland Buffer (AC) Wetland (AC) Stormwater (AC) ** ROW (AC) Total Park (AC) 14.98 0.63 $63,239 0.63 0.55 0.87 1.16 0.16 0.09 3.46 26.89 3.23 $323,287 3.23 0.41 1.07 0.71 1.84 0.14 7.40 13.26 1.59 $159,419 1.59 0.87 1.62 1.39 0.19 0.15 5.81 7.70 0.92 $92,574 0.92 1.72 3.18 3.71 0.50 0.09 3.38 4.60 0.55 $55,304 0.55 0.38 0.60 0.23 0.19 0.06 2.01 67.43 6.93 $693,822 6.93 3.25 6.02 5.93 2.79 0.52 22.05 6.93 6.93 $693,822 Estimated Parkland Dedication - Master Plan PHASE 1/Icon Apartments * PHASE 2 Phase 2 Subtotal Phase 1 Subtotal PHASE 3 Phase 3 Subtotal Phase 4 Subtotal PHASE 5 PHASE 4 Phase 5 Subtotal TOTAL Total Land Required/Provided (AC) Total CILP/IILP Required MSP 1.04 P2 P3 P1 P2 P3 SEE HOMESTEAD PARK VISION FOR POTENTIAL AMENITIES IN P1, P2, & P3 REGIONAL TRAIL CONNECTION REGIONAL TRAIL CONNECTION LAUREL PARKWAY (90’ ROW)HAVENWOOD DRIVEROSA WAYDAYSPRING AVENUETWIN LAKES AVENUECOTTONWOOD ROAD (120’ ROW)BAXTER LANE (100’ ROW) WEST OAK STREET (125’ ROW) TOUCHSTONE LANE WILDWOOD LANE BOZEMAN SPORTS PARK FLANDERS CREEK SUBDIVISION LAUREL GLEN SUBDIVISION PHASE 2 FUTURE HIGH SCHOOL B D C F G J I H K L M O N Q P S T U R BRI ARWO O D L A N E A HARVEST PAR K W A Y WE L L S P R I N G DRIVE PHASE 1 ABIGAIL LANEwest Lot 14 west west east east east P1 PHASE 2 PHASE 4 PHASE 5 PHASE 3 PARKS, TRAILS AND OPEN SPACE FRAMEWORK NWX will provide a well-connected system of parks, trails and open space, both internally and externally to regional destinations including the future north-south regional trail extension, Bozeman Sports Park, nearby schools and residential development. The focal point of the community is Homestead Park which functions as a linear park connecting multiple neighborhood parks. General locations for east-west connector parks are shown to help achieve connectivity to Bozeman Sports Park and to parks within NWX. Parkland dedication shall be implemented throughout NWX for establishment of Homestead Park and additional park and amenity areas throughout individual development parcels. Any deficiency between provided park land and required park land will be provided via additional parkland with each subdivision reviewed or cash-in-lieu. Improvements-in-Lieu are preferred so that improvements will be made within Homestead Park and other NWX Parks to support the Parks and Open Space Framework documented in the Master Site Plan. Improvements- in-Lieu can include items that improve aesthetic, environmental sustainability or diversify user experiences. Examples include: installation of permeable paving systems in linear trail corridors, upgrading to concrete surfacing in high use areas, or adding educational or interpretive signage along a trail corridor. PHASING Phasing is intended to generally occur as shown, however phases may not occur specifically in the numerical order indicated. Phasing shown is intended to provide guidance as to which portions of Homestead Park should be developed with adjacent lands. Dedication of Parks P1, P2 and P3 shall occur in Phase One. Installation of bridge crossings shall be coordinated through agreements with NWX and individual Phases. Timing of installation of bridges to be documented in improvements agreement and the City, requiring construciton to be completed prior to issuance of occupancy permits for west side Phases. PARKLAND DEDICATION SUMMARY Below is a breakdown of park dedication requirements and provided parkland by phase. A detailed breakdown is provided on sheet MSP 1.04a. Lot 1 Lot 2 Restricted Lot 1 Restricted Lot 5 Stormwater Tract 1 Stormwater Tract 2 Restricted Lot 3 Restricted Lot 4 Restricted Lot 2 Restricted Lot 15 Restricted Lot 14 Restricted Lot 13 Restricted Lot 7 Restricted Lot 8 Restricted Lot 9 Restricted Lot 10 Restricted Lot 6 Restricted Lot 12 Restricted Lot 11 Lot 3 Lot 5Lot 4 Lot 7 Lot 6 Lot 13 Lot 8 Lot 9 Lot 10 Lot 11Lot 12 PARK STREETSCAPE OPEN SPACE CLASS IB TRAIL - TRANSPORTATION PATHWAY CLASS IIA TRAIL - RECREATION PATHWAY DETACHED SIDEWALK WETLANDS BOUNDARY WETLANDS BUFFER ZONE 1 WETLANDS BUFFER ZONE 2 APPROXIMATE CHANNEL CENTERLINE PEDESTRIAN BRIDGE HOMESTEAD PARK EAST/WEST PARK CONNECTOR PHASING LEGEND 70’ PUBLIC ACCESS EASEMENT 10/11/22 22200 NWX MSP MOD NORTHWEST CROSSING | PARKS, OPEN SPACE & TRAILS FRAMEWORK REVISED: 07 SEPTEMBER 2022 100 0 200 SCALE: 1” = 200’ 400 NORTHBAXTER CREEK PARK PROVIDED The Homestead Park boundary includes lands which meet the City’s standard requirements for linear and neighborhood parks, and additional areas of wetlands, wetlands buffers and stormwater detention. A breakdown of which lands are used to meet park dedication requirements is included below. The Master Site Plan documents 6.93 acres of qualifying park land. Remaining qualifying park land deficiency will be achieved through further park land dedication or improvements-in-lieu of park land. Additional parks will be identified and located during subsequent platting and site plan processes to meet total park dedication requirements. Additional parks shall provide a diverse set of amenities to support a high quality of life for neighborhood residents. Developed amenities within parks will be consistent with the PROST Master Plan recommendations for neighborhood, linear and pocket parks. Through on-street and off-street trails, NWX’s park system will be easily accessible to residents and visitors, providing access to Homestead and additional parks within a 5-minute walk (1/4 mile) of all areas in the community. Parking and Connectivity On-street parking adjacent to parks will be provided per City requirements, while still encouraging walk-to and bike-to use of the community’s parks. With NWX’s proximity to the Bozeman Sports Park, NWX’s parks will be focused on spaces that will support passive and active daily recreation, leisure activities and community gathering rather than programmed sports. Park locations and designs should enhance the site’s natural resource values while providing quality nature-based recreation, play and leisure opportunities in addition to traditional park amenities. See sheet MSP 1.05 for road frontage calculations. Maintenance Park maintenance responsibility will fall to the Parks Division upon acceptance of parkland dedication (easement or deed) and park staff acceptance of improvements. Phasing Potential phasing is noted on the plan. Sequencing of phases dependent on phasing of overall development and subdivision review of individual planning areas. City shall review and approve individual park designs through the subdivision and site plan review process. Planning Area Lot/Block(s) Zoning Net Developed Residential Area (AC) Units/AC DU/Ac Estimated Total Land Required Estimated CILP/IILP Required*** Unrestricted Park (AC) 20' Wetland Setback (AC) 30' Wetland Buffer (AC) Wetland (AC) Stormwater (AC) ** ROW (AC) Total Park (AC) 14.98 0.63 $63,239 0.63 0.55 0.87 1.16 0.16 0.09 3.46 26.89 3.23 $323,287 3.23 0.41 1.07 0.71 1.84 0.14 7.40 13.26 1.59 $159,419 1.59 0.87 1.62 1.39 0.19 0.15 5.81 7.70 0.92 $92,574 0.92 1.72 3.18 3.71 0.50 0.09 3.38 4.60 0.55 $55,304 0.55 0.38 0.60 0.23 0.19 0.06 2.01 67.43 6.93 $693,822 6.93 3.25 6.02 5.93 2.79 0.52 22.05 6.93 6.93 $693,822 Estimated Parkland Dedication - Master Plan PHASE 1/Icon Apartments * PHASE 2 Phase 2 Subtotal Phase 1 Subtotal PHASE 3 Phase 3 Subtotal Phase 4 Subtotal PHASE 5 PHASE 4 Phase 5 Subtotal TOTAL Total Land Required/Provided (AC) Total CILP/IILP Required MSP 1.04 P2 P3 P1 P2 P3 SEE HOMESTEAD PARK VISION FOR POTENTIAL AMENITIES IN P1, P2, & P3 REGIONAL TRAIL CONNECTION REGIONAL TRAIL CONNECTION LAUREL PARKWAY (90’ ROW)HAVENWOOD DRIVEROSA WAYDAYSPRING AVENUETWIN LAKES AVENUECOTTONWOOD ROAD (120’ ROW)BAXTER LANE (100’ ROW) WEST OAK STREET (125’ ROW) TOUCHSTONE LANE WILDWOOD LANE BOZEMAN SPORTS PARK FLANDERS CREEK SUBDIVISION LAUREL GLEN SUBDIVISION PHASE 2 FUTURE HIGH SCHOOL B D C F G J I H K L M O N Q P S T U R BRI ARWO O D L A N E A HARVEST PAR K W A Y WE L L S P R I N G DRIVE PHASE 1 ABIGAIL LANEwest Lot 14 west west east east east P1 PHASE 2 PHASE 4 PHASE 5 PHASE 3 PARKS, TRAILS AND OPEN SPACE FRAMEWORK NWX will provide a well-connected system of parks, trails and open space, both internally and externally to regional destinations including the future north-south regional trail extension, Bozeman Sports Park, nearby schools and residential development. The focal point of the community is Homestead Park which functions as a linear park connecting multiple neighborhood parks. General locations for east-west connector parks are shown to help achieve connectivity to Bozeman Sports Park and to parks within NWX. Parkland dedication shall be implemented throughout NWX for establishment of Homestead Park and additional park and amenity areas throughout individual development parcels. Any deficiency between provided park land and required park land will be provided via additional parkland with each subdivision reviewed or cash-in-lieu. Improvements-in-Lieu are preferred so that improvements will be made within Homestead Park and other NWX Parks to support the Parks and Open Space Framework documented in the Master Site Plan. Improvements- in-Lieu can include items that improve aesthetic, environmental sustainability or diversify user experiences. Examples include: installation of permeable paving systems in linear trail corridors, upgrading to concrete surfacing in high use areas, or adding educational or interpretive signage along a trail corridor. PHASING Phasing is intended to generally occur as shown, however phases may not occur specifically in the numerical order indicated. Phasing shown is intended to provide guidance as to which portions of Homestead Park should be developed with adjacent lands. Dedication of Parks P1, P2 and P3 shall occur in Phase One. Installation of bridge crossings shall be coordinated through agreements with NWX and individual Phases. Timing of installation of bridges to be documented in improvements agreement and the City, requiring construciton to be completed prior to issuance of occupancy permits for west side Phases. PARKLAND DEDICATION SUMMARY Below is a breakdown of park dedication requirements and provided parkland by phase. A detailed breakdown is provided on sheet MSP 1.04a. Lot 1 Lot 2 Restricted Lot 1 Restricted Lot 5 Stormwater Tract 1 Stormwater Tract 2 Restricted Lot 3 Restricted Lot 4 Restricted Lot 2 Restricted Lot 15 Restricted Lot 14 Restricted Lot 13 Restricted Lot 7 Restricted Lot 8 Restricted Lot 9 Restricted Lot 10 Restricted Lot 6 Restricted Lot 12 Restricted Lot 11 Lot 3 Lot 5Lot 4 Lot 7 Lot 6 Lot 13 Lot 8 Lot 9 Lot 10 Lot 11Lot 12 PARK STREETSCAPE OPEN SPACE CLASS IB TRAIL - TRANSPORTATION PATHWAY CLASS IIA TRAIL - RECREATION PATHWAY DETACHED SIDEWALK WETLANDS BOUNDARY WETLANDS BUFFER ZONE 1 WETLANDS BUFFER ZONE 2 APPROXIMATE CHANNEL CENTERLINE PEDESTRIAN BRIDGE HOMESTEAD PARK EAST/WEST PARK CONNECTOR PHASING LEGEND 70’ PUBLIC ACCESS EASEMENT 10/11/22 22200 NWX MSP MOD Road Frontage As a combination of linear park what connects multiple neighborhood and pocket parks, Homestead Park spans different standard requirements for road frontage. A large portion of Homestead Park is a linear park which does not require 100% road frontage. Sufficient parking and convienent access to Homestead Park will be provided in large part by frontage along Rosa Way. Rosa Way and Abigail Lane will include approximately 175 directly adjacent on-street parking spaces. Within Planning Areas P2 and P3, 100% of the developed park amenity areas front a roadway. Additional street frontage may be possible as parcels develop to the east and west of Homestead Park. NORTHWEST CROSSING | PARKLAND DEDICATION REVISED: 07 SEPTEMBER 2022 MSP 1.05 PARK NODE • SHELTER/PAVILION • NATURE-INSPIRED PLAY • PICNIC TABLES •SEATING •SPORT COURT • ACTIVITY LAWN •INTERNAL PATHWAYS •GARDENS PARK NODE •SHELTER/PAVILION •NATURE-INSPIRED PLAY • PICNIC TABLES • SEATING • SPORT COURT • ACTIVITY LAWN •INTERNAL PATHWAYS •GARDENS PARK NODE •SHELTER/PAVILION •ADVENTURE PLAY •PICNIC TABLES •SEATING •SPORT COURT •ACTIVITY LAWN •INTERNAL PATHWAYSON-STREET PARKING • APPROX 175 DIRECTLY ADJACENT SPACES TRAIL WAYSIDE • SEATING/BENCHES • INTERPRETIVE SIGNS • EXERCISE STATIONS • COMMUNITY GAMES TRAIL WAYSIDE • SEATING/BENCHES • INTERPRETIVE SIGNS • EXERCISE STATIONS • COMMUNITY GAMES General Notes: •Potential amenities shown are conceptual and subject to change based on final lot and roadway layout for each phase, site, and project constraints. Homestead park may be phased as parcels are further subdivided and developed. •Additional trails may be added to the west side of the park pending final adjacent lot layout. •Impacts to wetland areas to be mitigated as required. Final limit of disturbance to be determined at final plat or site plan for each planning area. •Trails and other developed amenities to comply with City wetland, floodway and stormwater detention setback requirements. • All trails to be soft surface or concrete and comply with current City design requirements. •25’ public access easement is required along trails within the watercourse setback. CLASS IIA TRAIL - RECREATION PATHWAY PARK AREA BOUNDARY ENHANCED PEDESTRIAN CROSSING, TYP. PROVIDE 10’ RECREATION PATHWAY TO CONNECT EAST AND WEST SIDES OF PARK P2 POTENTIAL STORMWATER DETENTION AREAS, TYP.BAXTER LANEROSA WAY PARK 3 P3 EAST P3 WEST PARK 1 P1 EAST P1 WEST PARK 2 P2 EAST PARKLINEAR PARKHARVEST PARKWAYTOUCHSTONE LANEWEST OAK STREETH O M E S T E A D C R E E K HOMESTEAD PARK VISION Homestead Park, as the heart of the community, is approximately 15 acres and includes wetlands, upland landscape, developed parkland and amenities for both active and passive use. Stormwater detention are also located within the park boundary but are not included in the qualified park acreage. See MSP 1.04 for detailed breakdown of wetland setbacks and unrestricted area within the park. Final park interfaces with adjacent properties is subject to more detailed planning and design of future subdivisions and shall comply with City requirements for setbacks, buffers and building envelope locations. Expansion of Homestead Park to the east or west is also possible depending on final design of adjacent parcels. Homestead Park’s location along Rosa Way, makes this park highly visible and creates an opportunity to showcase a high-quality park environment. Homestead Creek provides the natural open space framework for the park, tying together multiple developed amenity areas. Homestead Creek (currently Baxter Ditch) has perennial stream flows and will be enhanced ABIGAIL LANE ABIGAIL LANE to establish diverse native vegetation and support stabilized bank conditions. Multiple amenity areas are spread throughout the park, providing convenient access to neighbors on each side of the park. Developed amenities are located outside of wetland setbacks. Over 1/2-mile of internal trail loop connects each developed area in the park. Pedestrian bridge crossings of Homestead Creek will support east-west connectivity and create short trail loop options. Developed areas are intended to include a variety of neighborhood park features such as: • Shelters/pavilions • Traditional, nature-based and adventure play • Picnic tables and seating • Sport courts (pickleball, half-court basketball, volleyball) • Activity lawns • Educational gardens (pollinator, grassland, low water, etc.) • Community/lawn games (bocce ball, bag toss, horseshoes, etc.) Park Area Park Perimeter (LF) % Frontage Approx Developed Park Area (Ac) Approx On- Street Parking Spaces Approx Parking Capacity P1 1320 50.6% ** 1.2 15 37.5 P2 2241 61.8% 1.3 65 162.5 P3 2776 67.8% 1.6 85 212.5 TOTAL 4.1 160 412.5 **Note: Most of the south portion of P1 is functioning as a linear park. The qualified park located in P1 is provided with a large amount of direct road frontage. PROVIDE TRAIL CONNECTION TO NEIGHBORHOOD PARK/ OPEN SPACE IN AREA P. FINAL LOCATION TBD. P2 WEST ACTIVITY LAWN ENHANCED NATIVE LANDSCAPE SHELTER/PAVILION TRAIL WAYSIDE TRAILS/PATHWAYS PEDESTRIAN BRIDGE SIGNATURE BRIDGE TREATMENT LEGEND 0 80 160 FT NORTH 40 KEYMAP LAUREL PARKWAYCOTTONWOOD ROADBAXTER LANE WEST OAK STREET TREES WETLANDS BOUNDARY WETLANDS BUFFER ZONE 1 WETLANDS BUFFER ZONE 2 APPROXIMATE CREEK CENTERLINE PARK AREA BOUNDARY J restricted lot 5 K restricted lot 6 O restricted lot 10 P restricted lot 11 stormwater tract 1 stormwater tract 2 H I S restricted lot 13 T restricted lot 15 C/D 10’ RECREATION PATHWAY CONNECTION FROM P2 EAST TO WEST 10/11/22 22200 NWX MSP MOD Road Frontage As a combination of linear park what connects multiple neighborhood and pocket parks, Homestead Park spans different standard requirements for road frontage. A large portion of Homestead Park is a linear park which does not require 100% road frontage. Sufficient parking and convienent access to Homestead Park will be provided in large part by frontage along Rosa Way. Rosa Way and Abigail Lane will include approximately 175 directly adjacent on-street parking spaces. Within Planning Areas P2 and P3, 100% of the developed park amenity areas front a roadway. Additional street frontage may be possible as parcels develop to the east and west of Homestead Park. NORTHWEST CROSSING | PARKLAND DEDICATION REVISED: 07 SEPTEMBER 2022 MSP 1.05 PARK NODE • SHELTER/PAVILION • NATURE-INSPIRED PLAY • PICNIC TABLES •SEATING •SPORT COURT • ACTIVITY LAWN •INTERNAL PATHWAYS •GARDENS PARK NODE •SHELTER/PAVILION •NATURE-INSPIRED PLAY • PICNIC TABLES • SEATING • SPORT COURT • ACTIVITY LAWN •INTERNAL PATHWAYS •GARDENS PARK NODE •SHELTER/PAVILION •ADVENTURE PLAY •PICNIC TABLES •SEATING •SPORT COURT •ACTIVITY LAWN •INTERNAL PATHWAYSON-STREET PARKING • APPROX 175 DIRECTLY ADJACENT SPACES TRAIL WAYSIDE • SEATING/BENCHES • INTERPRETIVE SIGNS • EXERCISE STATIONS • COMMUNITY GAMES TRAIL WAYSIDE • SEATING/BENCHES • INTERPRETIVE SIGNS • EXERCISE STATIONS • COMMUNITY GAMES General Notes: •Potential amenities shown are conceptual and subject to change based on final lot and roadway layout for each phase, site, and project constraints. Homestead park may be phased as parcels are further subdivided and developed. •Additional trails may be added to the west side of the park pending final adjacent lot layout. •Impacts to wetland areas to be mitigated as required. Final limit of disturbance to be determined at final plat or site plan for each planning area. •Trails and other developed amenities to comply with City wetland, floodway and stormwater detention setback requirements. • All trails to be soft surface or concrete and comply with current City design requirements. •25’ public access easement is required along trails within the watercourse setback. CLASS IIA TRAIL - RECREATION PATHWAY PARK AREA BOUNDARY ENHANCED PEDESTRIAN CROSSING, TYP. PROVIDE 10’ RECREATION PATHWAY TO CONNECT EAST AND WEST SIDES OF PARK P2 POTENTIAL STORMWATER DETENTION AREAS, TYP.BAXTER LANEROSA WAY PARK 3 P3 EAST P3 WEST PARK 1 P1 EAST P1 WEST PARK 2 P2 EAST PARKLINEAR PARKHARVEST PARKWAYTOUCHSTONE LANEWEST OAK STREETH O M E S T E A D C R E E K HOMESTEAD PARK VISION Homestead Park, as the heart of the community, is approximately 15 acres and includes wetlands, upland landscape, developed parkland and amenities for both active and passive use. Stormwater detention are also located within the park boundary but are not included in the qualified park acreage. See MSP 1.04 for detailed breakdown of wetland setbacks and unrestricted area within the park. Final park interfaces with adjacent properties is subject to more detailed planning and design of future subdivisions and shall comply with City requirements for setbacks, buffers and building envelope locations. Expansion of Homestead Park to the east or west is also possible depending on final design of adjacent parcels. Homestead Park’s location along Rosa Way, makes this park highly visible and creates an opportunity to showcase a high-quality park environment. Homestead Creek provides the natural open space framework for the park, tying together multiple developed amenity areas. Homestead Creek (currently Baxter Ditch) has perennial stream flows and will be enhanced ABIGAIL LANE ABIGAIL LANE to establish diverse native vegetation and support stabilized bank conditions. Multiple amenity areas are spread throughout the park, providing convenient access to neighbors on each side of the park. Developed amenities are located outside of wetland setbacks. Over 1/2-mile of internal trail loop connects each developed area in the park. Pedestrian bridge crossings of Homestead Creek will support east-west connectivity and create short trail loop options. Developed areas are intended to include a variety of neighborhood park features such as: • Shelters/pavilions • Traditional, nature-based and adventure play • Picnic tables and seating • Sport courts (pickleball, half-court basketball, volleyball) • Activity lawns • Educational gardens (pollinator, grassland, low water, etc.) • Community/lawn games (bocce ball, bag toss, horseshoes, etc.) Park Area Park Perimeter (LF) % Frontage Approx Developed Park Area (Ac) Approx On- Street Parking Spaces Approx Parking Capacity P1 1320 50.6% ** 1.2 15 37.5 P2 2241 61.8% 1.3 65 162.5 P3 2776 67.8% 1.6 85 212.5 TOTAL 4.1 160 412.5 **Note: Most of the south portion of P1 is functioning as a linear park. The qualified park located in P1 is provided with a large amount of direct road frontage. PROVIDE TRAIL CONNECTION TO NEIGHBORHOOD PARK/ OPEN SPACE IN AREA P. FINAL LOCATION TBD. P2 WEST ACTIVITY LAWN ENHANCED NATIVE LANDSCAPE SHELTER/PAVILION TRAIL WAYSIDE TRAILS/PATHWAYS PEDESTRIAN BRIDGE SIGNATURE BRIDGE TREATMENT LEGEND 0 80 160 FT NORTH 40 KEYMAP LAUREL PARKWAYCOTTONWOOD ROADBAXTER LANE WEST OAK STREET TREES WETLANDS BOUNDARY WETLANDS BUFFER ZONE 1 WETLANDS BUFFER ZONE 2 APPROXIMATE CREEK CENTERLINE PARK AREA BOUNDARY J restricted lot 5 K restricted lot 6 O restricted lot 10 P restricted lot 11 stormwater tract 1 stormwater tract 2 H I S restricted lot 13 T restricted lot 15 C/D 10’ RECREATION PATHWAY CONNECTION FROM P2 EAST TO WEST 10/11/22 22200 NWX MSP MOD NWX MSP 19440 Park P2 Mitigation Exhibit 09-07-2022 Per the previously approved NWX MSP, the Park P2 area included the amenities and features shown below: 10/11/22 22200 NWX MSP MOD Although slightly smaller in overall area, the proposed revisions to Park P2 area (shown below) includes the same amenities and will offer a similar experience to the current approved plan. The revision maintains the main components of the park to include a picnic shelter, playground, trails and multi-use lawn space. In addition, the expansion of the park area on the west side of Homestead Creek adds improved trail connectivity to the north and south, and to the linear park system along Harvest Parkway. The adjacent stormwater tract 1, although not developed park, will support open views into the Homestead Creek corridor and enhance the overall naturalistic character of Park P2. The developed east park amenities will all be highly visible and accessible from both Rosa Way and Touchstone Drive, providing central access within the NWX community. Proposed Park P2 Revisions: 10/11/22 22200 NWX MSP MOD