Loading...
HomeMy WebLinkAboutStorm Water Design Report 061022 Storm Water Design Report Lots 4 & 5, Block 18, Baxter Meadows Subdivision, Phase IIA Located in the S 1/2 of Section 34, T. 1S., R. 5E., P.M.M. City of Bozeman, Gallatin County, Montana Prepared By: s An, n t�7; 1 � t 7 o Gota73 S cc ENGINEERING& LAND SURVEYING 15 a J Go EE R-\-P June, 2022 STORM WATER OVERVIEW Storm water runoff from the full development of Lots 4 & 5 was accounted for in the sizing of the Baxter Meadows Subdivision storm water infrastructure. The storm water infrastructure installed with the subdivision includes roadway and adjacent parking asphalt, curb and gutter, underground storm sewers, storm water retention/detention facilities. LOT 4 & 5 STORM WATER MANAGEMENT Attached in Appendix A are relevant sections of the Storm Water Design Report prepared for Baxter Meadows Subdivision, Phase 2A. The project site is located within Drainage Basin #3 and highlighted on the "Basin 3 Drainage Area Map". The original Detention Basin #3 calculations are also attached highlighting the post-development runoff coefficient assumed for the site (C=0.60-Commercial Neighborhood). Lots 4 & 5 combined contain a gross area of 11,814 square feet. The proposed development of Lots 4 & 5 will include: Roof Area (C=0.85) = 6,105 sq ft Concrete/Asphalt Area (C=0.90) = 1,827 sq ft Landscaping (C=0.30) = 3,882 sq ft The Composite C coefficient for the proposed developed area is: C = (0.85(6,105) + 0.90(1,827) + 0.30(3,882)) / 11,814 C = 0.68 The proposed site development includes a slightly higher impervious area than that which was assumed with the original Baxter Meadows Phase 2A infrastructure design report (C of 0.68 vs. C of 0.60). To avoid unplanned impacts to the existing storm water infrastructure we are proposing to construct a shallow swale retention area to retain the surface runoff from the portion of the site between the proposed buildings. This area is identified as Drainage Area #1 on the "Drainage Area Exhibit" attached within Appendix A. Attached in Appendix A is a "Storm Water Design Calculations" spreadsheet comparing the 10-year storm water volumes for the assumed site runoff (C=0.60) and the proposed site runoff (C=0.68). The calculations show that a minimum on-site retention volume of 68 cubic feet is required to limit the off-site flows to the original projection. The proposed shallow storm water retention swale will provide a volume of 70 cubic feet which is adequate to handle the minimum of 68 cubic feet required for the project and the calculated 57 cubic feet required to handle all of Drainage Area #1. Although this site is less than 1-acre and this standard is not required to be met, we will also check that the pond is sized to capture the runoff generated from the fire 0.50 inches of rainfall from a 24-hour storm. A half inch of rain falling on Drainage Area #1 (2,037 feet) with a runoff coefficient of 0.41 equates to a total rain volume of 35 cubic feet of water. The 70 cubic feet of storage available within the proposed ponds is more than adequate to capture this volume. The proposed on-site storm water facilities are to be maintained by the Lot 4 & 5 owners. Attached in Appendix A is a copy of the "Storm Water Maintenance Plan" outlining the owners maintenance responsibilities for the on-site retention swale. The existing off-site storm water conveyance and detention facilities are to continue to be maintained by the Baxter Meadows Subdivision property owner's association. The owner's association maintenance responsibilities are spelled out in the subdivision covenants and homeowners association documents. Appendix. A Baxter Meadows Ph2A Drainage Basin 3 Map Baxter Meadows Ph2A Detention Basin 3 Calcs. Lot 4 Storm Water Exhibit Lot 4 Storm Water Design Calculations Lot 4 Storm Water Maintenance Plan 71 It V�l J. ------------- 43 Z6 IMF- F W- - Baxter Meadows-Phase II Detention Basin 3 Design Stom1 Frequency 10 yr Basin Area(Ac) 12.16 Pre0evelopment CoafBdant C Poet Devolopment Coefficient C Area(Ac) C Area(Ac) C Open Space 12.15 0.20 Open Space 0.20 Mod.Rea, 0.35 Mod.Res. 0.35 Dense Res. 0.50 Dense Res. 3.18 0.50 Comm.Neigh. 0.60 Comm.Neigh. 0 0.60 Comm Down 0.80 Comm.Down o.80 Industrial 0.80 Industrial 0.80 Total Area: 12.15 Compoape C: 0.2 Total Area: 12.16 Composite C: 0.57 Pre-Development Posl43evelopment Runoff Distance 1300 Q Runoff Dletance 1900 it Average Slope 0.80 % Average Slops 0.50 % Time of Concentration 67 min Time of Concentration 38 min Average Rainfall intensity 0.60 idhr Averepe Rainfall Intensity 0.68 mr Maximum Runoff 1.45 Cie Maximum Runoff 8.01 ds Storm Intensity Developed Developed Undeveloped Required Duration 10 Yr Flower Runoff Runoff Storage (min) (k tx) (c1s) (d) (on (CO 5 3.22 22.46 8735 434 63W 10 2.05 14:31 8684 869 7715 15 1.58 10.99 9892 1303 8690 Z0 1.31 9.12 109.40 1737 9203 26 1.13 7.89 11829 2171 9868 ;. 30 1.00 7.00 12809 2800 10003 35 0.91 6.34 13308 3040 10258 40 0.83 6.81 13844 3474 10470 45 0.77 ' 8.38 14531 3908 10023 50 0.72 5.03 14077 4343 10734 65 0.68 4.72 155" 4777 10611 80 0.84 4.46 10070 5211 10656 O5 0,$1,, AW, a + �rp mot; 14 i+ib t 70 0.58 4.04 1e981 0080 10582 r 76 0.66 3.86 17376 6614 10662 80 0.53 Wo 17773 69" 10524 86 0.51 3.68 18164 7383.; 10771 90 0.40 3.43 1$521 7817 10704 96 0.47 3.31 18875 8261 10023 100 DA8 3.20 10216 am 10531 106 0.44 3.10 19647 9120 10428 110 0.43 3.01 tons 9654 10314 115 0.42 2.92 20180 9988 10192 x 120 0.41 2.84 20483 10422 10000 r 126 0.40 2.77 20M 10867 9921 130 0.39 2.70 21005 11201 9774 136 0.38 2.64 21346 11725 9620 140 0.37 2.67 211618 12159 9469 145 0.36 2.62 21885 12694 9292 150 0.36 2.46 22147 13028 0119 I i Minimum Basin Area Minimum Volume¢ 10882 d Minimum Area(le"basin depth) 7256 of Actual Area(shaped to drain) 146M of i Minimum Area for Sediment Control->146 of per 1 cis Peak Developed Flow > 4.24 cis Minimum Area= 615 of f �I STORM WATER EXHIBIT LOTS 4 &5, BLOCK 18, BAXTER MEADOWS SUBDIVISION, PHASE IIA --------------..-----J� III ..__._.. _ .....__.. .. ..__.__.. _.._....___..___._. .. ... _.. ... III III yes—r�—au—asn --tise—r+se�ree—rea `—wss —mae---eae�va+---.va�e axe—edr I 1 roe —.rr4---ac.—ees--ev—°u—.nc—rn—aea�.v—e.m —.w I / I III I11 III SD � � 1 • •BIB v i amNEamEws>t 4'SEWER SERVICE 209) ONNECTTO EXISTING 7 4'ONNECT WER ET STIN 4' SEWER SEF'JICE 4'SEWER SERVICE� 1 l j i ra.wli( II F.F.ELEV•2.84 1 l RO FI•B74 1 F.F.ELEV=2.12 Bo—am kLL 'SIDELOPESALE--• ._•_.{. OFC•B].BB'._ 1 I ELEV•4890.60 I I INSTALL SHALLOW BIDBWAL #IE=45 ! �t ' .EV.4T- I W14H:1 V SIDE SLOPES F FP I I BOTTOM ELEV•4801.30 TVOLUMOP ELEE^TOV•ISD2 FT.05 w • 1 1 1.55LOT 4 ! �� LOT 5 I i BLOCK 18 BLOCK 18 \ LOT I ,eT B .FLOT 4 s.eo]soCRE FT b aIi 0.14AORooE 0.14A I/X 1 BLOCK 18 5,907 SO.FT a) yl CONN&Y98f DRAINS T } STORMWATER COLLECTION PIPE I nl �TF�ibO IS DRAIN '- ' L�. 1 ATER COLLECTI N P a LOT 3 mI/ I \ w (aEXISTING *'n> K'9.42) .fi B WILDING '.l sIMB 2 STEPS J Ml fie. 2 STEPS 2 E B� fi B GARAGE F.F.ELEV=4.17 . (B as GARAGE �Jiifffl F.F.ELEV 345 � -� � oroeaaz (3 .4 (192 •on I h r B �- 2.80)41.22) i I 'A.n 1f a i na •: 1 II y> e. I �■■eeeeeleeee3� w��n�w�w�w.�n�w�w��w n�.r:� .. •.� .. c II ° ALLEY �.m--- -------------- -- P I N 20 40 • �\\\ \ \ \, \\\ \ \� SCALE IN FEET #22001 Storm Water Design Calculations Project: Lots 4&5 of Block 18, Baxter Meadows Phase 2A Date: 6/10/2022 From City of Bozeman Design Standards: Q=CIA V=7200Q Q=runoff(cfs) C=Weighted C factor I=Rainfall Intesity(in/hr) A=Area(acres) V=Volume(ft) Rainfall Intensities(from figures 1-2&1-3) 110=0.4079 in/hr(10 yr,2 hr event) 125=0.5005 in/hr(25 yr,2 hr event) 150=0.5822 in/hr(50 yr,2 hr event) 1100=0.6348 in/hr(100 yr,2 hr event) Full Site Composite Runoff Coefficient Calculation Area ft2 Area(acres) C factor Hardscape= 1,827 0.0419 0.90 Roof= 6,105 0.1402 0.85 Landscaping= 3,882 0.0891 0.30 Total Area= 11,814 0,2712 Weighted C= 0.68 Full Site Retention(C=0.68) For a 10-year storm event: Area= 11,814 ft2 Q10= 0.0749 cfs Vrqd= 539 ft3 Retention Provided by Underlyina Subdivision(C=0.60) For a 10-year storm event: Area= 11,814 ft2 Q10= 0.0664 cfs Vrqd= 478 ft3 Minimum On Site Retention Required=539 ft3-478 ft3=68 ft3 Drainage Area#1 Calculations Drainage Area#1 Composite Runoff Coefficient Calculation Area ft2 Area(acres) C factor Hardscape= 380 0.0087 0.90 Landscaping= 1,657 0.0380 0.30 Total Area= 2,037 0.0468 Weighted C= 0.41 Area= 2,037 ft2 Q10= 0.0079 cfs Vrqd= 57 ft3 -> On Site Retention Provided=57 ft3 4 Drainage Area#1,and its associated storm water retention swale is large enough to ensure the subdivision design runoff from this lot is not exceeded. The on-site retention provided is also sufficiently sized to handle the runoff from Drainage Area#1. STORM WATER MAINTENANCE PLAN Lot 4, Block 18, Baxter Meadows Subdivision, Phase IIA City of Bozeman, Montana PROPERTY OWNER'S RESPONSIBILITIES FOR ROUTINE INSPECTION AND MAINTENANCE: 1. Routine Maintenance Activities (1-3 month interval) • Designate no cut zones in the bottom of basins • Remove trash, leaves, grass clippings and debris • Establish a chemical free zone in and around the basin • Inspect for uniform ponding, and that water disappears within three days of rain events 2. Annual Maintenance Activities (Annually) • Cut vegetation to 6" and remove clippings • Re-establish vegetation on eroded and barren areas • Remove excess sediment build-up • Update maintenance plan and inspection log 3. Long Term Maintenance Activities (5-10 year interval) • Consult a qualified professional to inspect and return storm water basin back to initial design found on the subdivision and/or site plan engineering plans. • Dredge basin if sediment buildup is greater than 6" • Re-establish vegetation 22001\Storm Water Maintenance PIan.Doc