Loading...
HomeMy WebLinkAboutCash-in-lieu of water rights email1 mcotterman caddiseng.com From:mcotterman caddiseng.com Sent:Thursday, March 31, 2022 1:02 PM To:Griffin Nielsen Subject:Lot 4, Block 18, Baxter Meadows Ph2A - CIL of water rights confirmation Attachments:C1.0 032822.pdf Hey Griffin, Hope you are doing well! I’m working on a small project on Lot 4, Block 18 of Baxter Meadows Subdivision, Phase 2A for which we need confirmation that the cash-in-lieu of water rights was paid for with the original subdivision. Attached is copy of the site plan…the building will contain ground floor office/commercial space and the upper floor with have 1, 3-bedroom apartment and 2, 1-bedroom apartment. If you can take a look in your records and send me a confirmation email it would be much appreciated. Thanks, Matt Cotterman, P.E., P.L.S. Caddis Engineering & Land Surveying 226 Timberline Drive Bozeman, MT 59718 (406)581-4097 mcotterman@caddiseng.com www.caddiseng.com PRIVILEGED AND CONFIDENTIAL: This electronic message and any attachments are confidential property of the sender. The information is intended only for the use of the person to whom it was addressed. Any other interception, copying , accessing, or disclosure of this message is prohibited. The sender takes no responsibility for any unauthorized reliance on this message. If you have received this message in error, please notify the sender and purge the message you received. Do not forward this message without permission.