Loading...
HomeMy WebLinkAbout018 Appendix J - DEQ Draft MFE Application and letter ■ Morrison ■■ � Maierle 2880 TECHNOLOGY BLVD.W. • BOZEMAN,MT 59718 engineers . surveyors planners scientists 406,587.0721 • www.n1-m.net May 6, 2022 City of Bozeman City of Bozeman 20 East Olive Street PO Box 1230 Bozeman, MT 59771 RE: West Park Subdivision DEQ Exemptions Request We request that the West Park Subdivision be processed through the Municipal Facilities Exclusion process. The MDEQ form is included as an attachment to the is letter. As part of the application materials for the Preliminary Plat there are the following items in support of this request: • Copy of the Preliminary Plat • Vicinity Map • Storm Drainage Plan • Extent of water, sewer, and stormwater infrastructure is shown on the Preliminary Plat Sincerely, Morrison-Maierle, Inc. James Nickelson, PE Project Manager We create solutions that build better communities AN EMPLOYEE-OWNED COMPANY • AN EQUAL OPPORTUNITY EMPLOYER—MINORITIES/FEMALES/DISABLED/VETERANS MONTANA DEPARTMENT OF ENVIRONMENTAL QUALITY MUNICIPAL FACILITIES EXCLUSION Montana Cepxtrrent o�Ervironrmn,at(,Xwitt Subdivision Name: West Park Subdivision Number of lots/parcels/units: 4 / I Geocode: 06-0798-09-1-01-20-0000 (this can be found at http://svc.mt.gov/msl/mtcadastral) Are main extensions necessary to serve the subdivision? X Yes No If yes, have plans for the mains been submitted for review? _Yes X_No How will construction of the facilities be financed? Private financing Also Geocode 06-0798-09-1-01-30-000, 06-0798-09-1-01-40-0000, and 06-0798-09-1-01-50-0000 Owner Information: Owner(s) Name: 8FC, LLC . 07 Print name of owner(s) Signature of all owners of record Address. PO Box 11388 Bozeman, MT 59719 Street or PO Box, City, State, Zip Code Email: peibsk9yahoo.com Phone: 406-539-1366 Consultant Information: Company and Address: Morrison Maierle POB 1113 Bozeman, MT 59718 Email: jnickelson@m-m . net 406-922-6824 Phone. Eligibility Requirements: All of the following criteria must be met: F&/� The project must be provided with adequate municipal water and sewer, solid waste disposal and the municipality must review storm water plans. ❑✓ All the mains necessary to serve the subdivision must be municipality owned, operated and maintained. Privately owned mains or lift stations make the project ineligible for this exemption. Wl The municipality must be a 1 St or 2nd class municipality as described in MCA 7-4-111 or covered under a growth policy pursuant to Title 76, chapter 1. The project must be one of the following (check applicable box): ✓ A new division subject to review under the Montana Subdivision and Platting Act, or Previously divided parcels recorded with Sanitary Restrictions prior to July 1 , 1973 or Divisions or parcels of land that are exempt from Montana Subdivision and Platting Act review under 76-3-203 or 76-3-207 (1) (a), (b), (d), (e), or(f) Form continues on next page _ 10 Submittal Requirements: All of the following items must be submitted: ✓ This form, signed by the property owner, and the municipalities' representative. ✓ Copy of Preliminary Plat, COS, Amended Plat or Unit Declaration. The Plat, COS, Am Plat or Unit Declaration must contain the exemption 76-4-125 (1)(d)(i), (ii) or (iii). If using item (iii), the Plat, COS, Am Plat or Unit Declaration must also contain the appropriate Platting Act exemption. Fv-1 Vicinity map showing project location. F-1 Applicable zoning ordinances in effect Fvlon file F-1 Copy of growth policy, if applicable F&—/Ion file Fv-1 $120 processing fee Certification: I hereby certify that I am licensed to practice engineering in the State of Montana, I am employed directly or retained by the municipality providing service and am authorized to sign on behalf of the municipality. In addition, I hereby certify that: 1. The existing water and wastewater systems are in compliance with the provisions of Title 75, chapters 5 and 6, and 2. The water and wastewater systems have adequate capacity to meet the needs of the project, and 3. The municipality has or will review plans to ensure adequate storm water drainage and adequate solid waste disposal X / r (Signature of Professional Engineer) (Date Signed) Montana P.E. Number PE Stamp Send to: MTDEQ Subdivisions PO Box 200901 Helena MT 59620-0901