Loading...
HomeMy WebLinkAbout007.03 L 102 - Park Hardscape & Grading Plan3SIO8'8'WES8'LANLANLANLANSIOSIOSIO+851.4%+861.3%+871.7%+880.6%0.6%2.2%+894785'4785'4780'4785'4785'4785'4785'1311(FUTURE)VAUGHN DRIVEXXPERPETUALWETLAND EASEMENTEXISTINGIRRIGATION DITCHEXISTINGIRRIGATION DITCHBAXTERCREEKBAXTERCREEKALL PROPOSED PLANTINGWITHIN EASEMENT TO BE INSTALLED BY HAND WITH LIMITED DISTURBANCEPERPETUALWETLAND EASEMENTXX3(FUTURE)VAUGHN DRIVE22ALL PROPOSED PLANTINGWITHIN EASEMENT TO BE INSTALLED BY HAND WITH LIMITED DISTURBANCEPROPOSED ROWFOR FUTURE STREET4545XXXX554466KEYNOTES - 1/L102123PARK BOUNDARY46' WIDTH CRUSHER FINES TRAIL5PERPETUAL WETLAND EASEMENT, MINIMIZE DISTURBANCE IN LIMITSAS MUCH AS POSSIBLE, SEE LANDSCAPE NOTES SHEET L00130' WATERCOURSE SETBACK, ZONE 120' WATERCOURSE SETBACK, ZONE 2VAUGHN DRIVE SIDEWALK TO BE CONSTRUCTED IN FUTURE PHASE6LINE TYPE LEGENDPROPERTY LINEPROPOSED MAJOR CONTOURPROPOSED MINOR CONTOUREXISTING MAJOR CONTOUREXISTING MINOR CONTOUR7620'LIMLIMLIMITS OF DISTURBANCEWATERCOURSE SETBACKPERPETUAL WETLAND EASEMENTSYMBOLPRODUCTSITE MATERIAL SCHEDULE - PHASE 1CRUSHERFINES TRAILCONCRETEALL ROUNDWASHED ROCKALUMINUMEDGINGPERPLANSYMBOLPRODUCTSITE AMENITY SCHEDULE - PHASE 16' LENGTHACCESSIBLEPICNICTABLE***BIKE RACK***SHADEPAVILION**IRRIGATIONWELLWPEDESTRIANBRIDGEPRIMARY PARKSIGNAGEDIRECTIONALTOTEMSYMBOLPRODUCTSIGNAGE SCHEDULE - PHASE 1Park Hardscape &Grading PlanL 1022010040N1L1021" = 20'-0"Park Hardscape & Grading PlanMATCHLINE SHEET 1/L101design5la.com406.587.4873dateissuedrawn by:checked by:filename:z:\nwb west park neighborhood\autocad\01_sheets\norton west park-parks-ph1\l000_west-park-parks_landscape_parks-ph1.dwg West Park Phase 1 Park Plan Bozeman, Montana KHM/HU TMS 05/06/22Prelim Plat09/02/22Prelim Plat RC11/11/22Prelim Plat RC01/03/23InfrastructureMATCHLINE SHEET 1/L103