HomeMy WebLinkAbout007.02 L 101 - Park Hardscape & Grading PlanSIOLAN8'8'WESSIOWESWES8'LANSIOSIO11+900.6%+91+90.50.6%0.6%+97+96+95+94+93+922.9%2.9%2.9%2.9%2.9%2.9%2.0%+90.7+90.3+90.54790'4785'4795'4790'4790'4790'37894555123(FUTURE)VAUGHN DRIVE
XXXX4790'EXISTINGIRRIGATION DITCHPERPETUALWETLAND EASEMENTBAXTERCREEKPERPETUALWETLAND EASEMENTALL PROPOSED PLANTINGWITHIN EASEMENT TO BE INSTALLED BY HAND WITH LIMITED DISTURBANCE6610111011121313KEYNOTES - 1/L101123PARK BOUNDARYRECONSTRUCTED POND, SEE CIVIL46' WIDTH CRUSHER FINES TRAILRECONSTRUCTED/EMERGENT WETLAND AREA; SEE CIVIL FOR ALL CROSSSECTIONS, DETAILS, & SOILS INFORMATION5NATIVE PLANTING AT RECONSTRUCTED WETLAND, FINAL PLACEMENT TBDBASED ON CIVIL GRADING & SOIL ANALYSIS6PERPETUAL WETLAND EASEMENT, MINIMIZE DISTURBANCE IN LIMITSAS MUCH AS POSSIBLE, SEE LANDSCAPE NOTES SHEET L001789STEEL SHADE PAVILION(2) PICNIC TABLES, SURFACE MOUNT TO CONCRETE(3) BIKE RACKS, SURFACE MOUNT TO CONCRETE1030' WATERCOURSE SETBACK, ZONE 11120' WATERCOURSE SETBACK, ZONE 212ALUMINUM EDGING AT ROCK BARK BED13VAUGHN DRIVE SIDEWALK TO BE CONSTRUCTED IN FUTURE PHASELINE TYPE LEGENDPROPERTY LINEPROPOSED MAJOR CONTOURPROPOSED MINOR CONTOUREXISTING MAJOR CONTOUREXISTING MINOR CONTOUR7620'LIMLIMLIMITS OF DISTURBANCEWATERCOURSE SETBACKPERPETUAL WETLAND EASEMENTSYMBOLPRODUCTSITE MATERIAL SCHEDULE - PHASE 1CRUSHERFINES TRAILCONCRETEALL ROUNDWASHED ROCKALUMINUMEDGINGPERPLANSYMBOLPRODUCTSITE AMENITY SCHEDULE - PHASE 16' LENGTHACCESSIBLEPICNICTABLE***BIKE RACK***SHADEPAVILION**IRRIGATIONWELLWPEDESTRIANBRIDGEPRIMARY PARKSIGNAGEDIRECTIONALTOTEMSYMBOLPRODUCTSIGNAGE SCHEDULE - PHASE 120
'
6'-
1
0
"10'-6"15'9'-6"27'8'11
'
-
6
"
4'-
3
"
4'-
3
"6'MAINTAIN 30"X48"CLEAR FOR ADASEATING SPACEPark Hardscape& Grading PlanL 1012010040N1L1011" = 20'-0"Park Hardscape & Grading PlanMATCHLINE SHEET 1/L100design5la.com406.587.4873dateissuedrawn by:checked by:filename:z:\nwb west park neighborhood\autocad\01_sheets\norton west park-parks-ph1\l000_west-park-parks_landscape_parks-ph1.dwg
West Park
Phase 1 Park Plan
Bozeman, Montana
KHM/HU TMS
05/06/22Prelim Plat09/02/22Prelim Plat RC11/11/22Prelim Plat RC01/03/23InfrastructureMATCHLINE SHEET 1/L102105020N2L1011" = 10'-0"Park Hardscape Enlargement