Loading...
HomeMy WebLinkAbout001 - SP000 - COVER SHEETSITE VICINITY & ZONING PLAN 1. NO WETLANDS EXIST ON-SITE 2. THE SITE DOES NOT LIE WITHIN A 100 YEAR FLOODPLAIN 3. THERE ARE NO SIGNIFICANT ROCK OUTCROPPINGS, SLOPES OR SIGNIFICANT TOPOGRAPHIC FEATURES 4. THERE ARE NO UNIQUE NATURAL FEATURES, SIGNIFICANT WILDLIFE AREA OR VEGETATIVE COVER. 5. THERE ARE NO HISTORICAL, CULTURAL OR ARCHEOLOGICAL RESOURCES 6. SEE CIVIL SHEETS FOR ADDITIONAL SITE INFO PROJECT NOTES ACKNOWLEDGEMENT OF ACCESS REQUIREMENTS UNDER FEDERAL AND STATE DISCRIMINATION LAWS (ARM 24.301.902) THIS ACKNOWLEDGES THAT THE FOLLOWING PROJECT WAS DESIGNED WITH THE FULL KNOWLEDGE THAT THE CITY OF BOZEMAN BUILDING DIVISION WILL NOT REVIEW FOR COMPLIANCE WITH, NOR IS RESPONSIBLE FOR ENFORCEMENT OF THE FEDERAL AMERICANS W/ DISABILITIES ACT OF 1990, THE REHABILITATION ACT OF 19733333, THE FAIR HOUSING AMENDMENTS ACT OF 1988, TITLE 49, CHAPTER 2, COMMONLY KNOWN AS THE MONTANA HUMAN RIGHTS ACT, OR OTHER SIMILAR FEDERAL, STATE OR LOCAL LAWS, THAT MANDATE ACCESSIBILITY TO COMMERCIAL CONSTRUCTION OR MULTIFAMILY HOUSING. SITE & BUILDING DATA LEGAL DESCRIPTION SOUTH UNIVERSITY DISTRICT PH 3, S24, T02 S, R05 E, BLOCK 2, Lot 1, ACRES 8.6, PER PLAT J-695 ZONING:REMU (RESIDENTIAL EMPHASIS MIXED-USE DISTRICT) COMMUNITY PLAN FUTURE LAND USE -RESIDENTIAL MIXED USE AREA, COVERAGE, & DENSITY LOT AREA = 374,616 SQ. FT. (8.6 ACRES) TOTAL BUILDING FOOTPRINTS (GROSS): ROWHOUSE (5) UNIT - 4,550 SQ. FT. x (5) = 22,750 SQ.FT. ROWHOUSE (5A) UNIT - 3,840 SQ. FT. X(10) = 38,400 SQ.FT. MOTORCOURT APT. (8) UNIT - 6,110 SQ.FT. X (5) = 30,550 SQ.FT. APARTMENT BUILDING (42) UNIT = 15,893 SQ.FT. TOTAL = 107,593 SQ.FT. (28.7% OF PARCEL) PERCENT LOT COVERAGE = 28.7% (NO MAXIMUM REQUIREMENT) TOTAL BUILDING AREA (GROSS): ROWHOUSE (5) UNIT - 14,010 SQ. FT. x (5) = 70,050 SQ.FT. ROWHOUSE (5A) UNIT - 11,300 SQ. FT. X(10) = 113,000 SQ.FT. MOTORCOURT APT. (8) UNIT - 19,340 SQ.FT. X (5) = 96,700 SQ.FT. APARTMENT BUILDING (42) UNIT = 57,011 SQ.FT. X (1) = 57,011 SQ.FT. TOTAL = 336,761 SQ.FT. FLOOR AREA RATIO (F.A.R.) 336,761 SQ.FT. / 374,616 SQ.F.T = 0.89 TOTAL PARKING & CIRCULATION AREA = 142,440 SQ. FT. (38.1% OF PARCEL) TOTAL LANDSCAPED AREA = 124,583 SQ. FT. (33.2 % OF PARCEL) TOTAL DWELLING UNITS = 162 (1 BD, 2BD, & 3BD UNITS) RESIDENTIAL DENSITY = (162 UNITS / 1.477 ACRES) 18.8 UNITS/ACRE PRIVATE OPEN SPACE REQUIRED RESIDENTIAL: (6) ROWHOUSE (5) UNIT: 2 BEDROOMS - (1,675 SQ.FT.) x (10%) x (18) = 3,015 SQ.FT. 3 BEDROOMS - (2,115 SQ.FT.) x (10%) X (12) = 2,538 SQ.FT. TOTAL REQUIRED = 5,553 SQ.FT. (10) ROWHOUSE (5A) UNIT: 1 BEDROOMS - (1,098 SQ.FT.) x (10%) x (10) = 1,098 SQ.FT. 2 BEDROOMS (A) - (1,675 SQ.FT.) x (10%) x (30) = 5,025 SQ.FT. 2 BEDROOMS (B) - (1,098 SQ.FT.) x (10%) x (10) = 1,098 SQ.FT. TOTAL REQUIRED = 7,221 SQ.FT. (5) MOTORCOURT APT. (8) UNIT: 2 BEDROOMS (A) - (1,325 SQ.FT.) x (10%) x (10) = 1,325 SQ.FT. 2 BEDROOMS (B) - (1,325 SQ.FT.) x (10%) x (20) = 2,650 SQ.FT. 3 BEDROOMS - (1,840 SQ.FT.) x (10%) x (10) = 1,840 SQ.FT. TOTAL REQUIRED = 5,815 SQ.FT. (1) APARTMENT BUILDING (42) UNIT: 1 BEDROOM - (36) x (100 SQ.FT. = 3,600 SQ.FT. 2 BEDROOM - (6) x (150 SQ.FT.) = 900 SQ.FT. TOTAL REQUIRED = 4,500 SQ.FT. TOTAL REQUIRED = 23,089 SQ. FT. TOTAL OPEN SPACE PROVIDED (PER PHASE): PHASE 1: SITE (DOG PARK) = 3,815 SQ.FT. APT. BUILDING (LOBBY/AMENITY) = 1,918 SQ.FT. ROWHOUSE 5 (985 SQ.FT X 2) = 1,970 SQ.FT. ROWHOUSE 5A (964 SQ.FT X 4) = 3,856 SQ.FT. PHASE 2: ROWHOUSE 5 (985 SQ.FT. X 2) = 1,970 SQ.FT. ROWHOUSE 5A (964 SQ.FT. X 2) = 1,928 SQ.FT. MOTORCOURT APT. (2,230 SQ.FT. X 2) = 4,460 SQ.FT. PHASE 3: ROWHOUSE 5 (985 SQ.FT. X 2 ) = 1,970 SQ.FT. ROWHOUSE 5A (964 SQ.FT. X 2) = 1,928 SQ.FT. MOTORCOURT APT. (2,230 SQ.FT. X 2) = 4,460 SQ.FT. PHASE 4: ROWHOUSE 5A (964 SQ.FT. X 2) = 1,928 SQ.FT. MOTORCOURT APT. (2,230 SQ.FT. X 1) = 2,230 SQ.FT. TOTAL PROVIDED = 32,433 SQ.FT. PARKLAND EQUIVALENT TOTAL REQUIRED: (12 UNITS / ACRE x 8.6 ACRES x .03) = 3.09 ACRES x 43,560 SQ. FT. = 134,600.4 SQ.FT.. TOTAL PROVIDED: QUALIFYING PLATTED PARK LAND - 1.805 ACRES CASH IN LIEU = 1.291 ACRE x $2.30 x 43,560 SQ.FT. = $116,408.44 CASH $ AMOUNT= $129,342.70 PARKING TOTAL PARKING REQUIRED: RESIDENTIAL (1 BEDROOM) - 46 UNITS x 1 = 46 RESIDENTIAL (2 BEDROOM) - 94 UNITS x 2 = 188 RESIDENTIAL (3 BEDROOM) - 22 UNITS x 2 = 44 TOTAL REQUIRED = 251 SPACES (278 - 27 STREET PARKING REDUCTION = 251) *PER BOZEMAN ORDINANCE NO. 2105 TOTAL PARKING PROVIDED (SITE): SITE = 62 SPACES RESIDENTIAL GARAGES = 220 SPACES APT. BUILDING = 21 SPACES TOTAL PROVIDED = 303 SPACES (*INCLUDING 5 ACCESSIBLE SPACES) *ACCESSIBLE PARKING COUNT BASED ON SITE & APT. BUILDING ONLY TOTAL PARKING PROVIDED (PER PHASE): PHASE 1: SITE = 42 SPACES (INCLUD. 4 ACCESSIBLE SPACES) RESIDENTIAL GARAGES = 52 SPACES APT. BUILDING = 21 SPACES (INCLUD. 1 ACCESSIBLE SPACE) PHASE 2: SITE = 4 SPACES RESIDENTIAL GARAGES = 68 SPACES PHASE 3: SITE = 4 SPACES RESIDENTIAL GARAGES = 68 SPACES PHASE 4: SITE = 12 SPACES RESIDENTIAL GARAGES = 32 SPACES TOTAL PROVIDED = 303 BIKE PARKING TOTAL REQUIRED: (278) PARKING SPACES x 10% = 28 SPACES TOTAL PROVIDED: (32) INTERIOR + (54) EXTERIOR = 86 SPACES 1PARKLAND TRACKING TABLE (LOT 1 / BLOCK 2) 1 1 1 2 PROVIDED RESIDENTIAL: (6) ROWHOUSE (5) UNIT (PRIVATE PATIO/BALCONY): 2 BEDROOMS - (185 SQ.FT.) x (18) = 3,330 SQ.FT. 3 BEDROOMS - (215) SQ.FT.) x (12) = 2,580 SQ.FT. TOTAL PROVIDED = 5,910 SQ.FT. (10) ROWHOUSE (5A) UNIT (PRIVATE PATIO/BALCONY): 1 BEDROOMS - (197 SQ.FT.) x (10) = 1,970 SQ.FT. 2 BEDROOMS (A) - (190 SQ.FT.) x (30) = 5,700 SQ.FT. 2 BEDROOMS (B) - (197 SQ.FT.) x (10) = 1,970 SQ.FT. TOTAL PROVIDED = 9,640 SQ.FT. (5) MOTORCOURT APT. (8) UNIT (PRIVATE PATIO/BALCONY): 2 BEDROOMS (A) - (350 SQ.FT.) x (10) = 3,500 SQ.FT. 2 BEDROOMS (B) - (260 SQ.FT.) x (20) = 5,200 SQ.FT. 3 BEDROOMS - (245 SQ.FT.) x (10) = 2,450 SQ.FT. TOTAL PROVIDED = 11,150 SQ.FT. (1) APARTMENT BUILDING (42) UNIT: LOBBY/AMENITY SPACE = 1,918 SQ.FT. ONSITE = 3,815 SQ.FT. TOTAL PROVIDED = 5,733 SQ.FT. TOTAL PROVIDED = 32,433 SQ.FT. (8.7 % OF PARCEL) 2 2 2 2 2 2 SHEET NUMBER PROJECT CODE PROJECT ADDRESS ARCHITECT RETAINS COPYRIGHT TO THESE DRAWINGS. DRAWINGS ARE ONLY FOR USE FOR PROJECT NAMED ON DRAWING SHEET AND MAY NOT BE REPRODUCED OR USED FOR OTHER PURPOSES WITHOUT WRITTEN PERMISSION FROM ARCHITECT. 106 EAST BABCOCK STREET SUITE 1A BOZEMAN, MT 59715 SHEET NAME PROJECT NAME DRAWING REVISIONS DRAWING ISSUE DATE DRAWING ISSUED FOR PHONE: (406) 582-8988 SP000 WPM WENTWORTH COVER SHEET SOUTH UNIVERSITY DISTRICT / PHASE 3 / BLOCK 2 PERMIT REVIEW 2022-10-07 106 East Babcock Street Suite 1A Bozeman, Montana 59715 Ph. (406) 582-8988 www.intrinsikarchitecture.com 802 North 3rd Avenue Phoenix, Arizona 85003 CV QOZP Stucky Bozeman, LLC South University District / Phase 3 / Block 2 Intrinsik Architecture, Inc.Architect Owner South University District - Block Two 851 Brider Drive, Suite 1 Bozeman, Montana 59715 Ph. (406) 522-9526 www.seaeng.com Stahly & Associates, Inc.Civil Engineer Design.5 Landscape ArchitectureLandscape Architect 111 North Tracy Avenue Bozeman Montana 59715 Ph. (406) 587-4873 www.design5la.com MEP Engineer 7540 Churchill Road Manhattan, Montana 59741 Ph. (406) 282-7082 www.cdsiengineering.com Consulting Design Solutions, Inc. JUNE 23, 2022 ISSUED FOR: SITE PLAN REVIEW DRAWING INDEX ARCHITECTURE SHEET NO. SHEET TITLE DATE SP000 COVER SHEET 11/28/22 SP001 ARCHITECTURAL SITE PLAN 09/16/22 SP002 SITE DIAGRAMS 09/16/22 SP003 SITE DIAGRAMS 11/28/22 SP004 SITE DETAILS 06/23/22 SP005 SITE DETAILS 06/23/22 SP006 SITE DETAILS 06/23/22 SP101A ROWHOUSE (5) UNIT - FIRST FLOOR PLAN 11/28/22 SP101B ROWHOUSE (5) UNIT - ENLARGED PATIO PLAN 09/16/22 SP102 ROWHOUSE (5) UNIT - SECOND FLOOR PLAN 06/23/22 SP103 ROWHOUSE (5) UNIT - THIRD FLOOR PLAN 06/23/22 SP104 ROWHOUSE (5) UNIT - ROOF PLAN 06/23/22 SP105 ROWHOUSE (5) UNIT - EXT. ELEVATIONS 06/23/22 SP106 ROWHOUSE (5) UNIT - EXT. ELEVATIONS 06/23/22 SP107 ROWHOUSE (5) UNIT - EXT. PERSPECTIVES 09/16/22 SP108A ROWHOUSE (5A) UNIT - FIRST FLOOR PLAN 11/28/22 SP108B ROWHOUSE (5A) UNIT - ENLARGED PATIO PLAN 09/16/22 SP109 ROWHOUSE (5A) UNIT - SECOND FLOOR PLAN 06/23/22 SP110 ROWHOUSE (5A) UNIT - THIRD FLOOR PLAN 06/23/22 SP111 ROWHOUSE (5A) UNIT - ROOF PLAN 09/16/22 SP112 ROWHOUSE (5A) UNIT - EXT. ELEVATIONS 09/16/22 SP113 ROWHOUSE (5A) UNIT - EXT. ELEVATIONS 09/16/22 SP114 ROWHOUSE (5A) UNIT - EXT. PERSPECTIVES 09/16/22 SP115 MOTORCOURT APT. (8) UNIT - FIRST FLOOR PLAN 11/28/22 SP116 MOTORCOURT APT. (8) UNIT - SECOND FLOOR PLAN 06/23/22 SP117 MOTORCOURT APT. (8) UNIT - THIRD FLOOR PLAN 06/23/22 SP118 MOTORCOURT APT. (8) UNIT - ROOF PLAN 06/23/22 SP119 MOTORCOURT APT. (8) UNIT - EXT. ELEVATIONS 06/23/22 SP120 MOTORCOURT APT. (8) UNIT - EXT. ELEVATIONS 06/23/22 SP121 MOTORCOURT APT. (8) UNIT - EXT. ELEVATIONS 06/23/22 SP122 MOTORCOURT APT. (8) UNIT - EXT. PERSPECTIVES 09/16/22 SP123 APT. BUILDING (42) UNIT - FIRST FLOOR PLAN 09/16/22 SP124 APT. BUILDING (42) UNIT - SECOND FLOOR PLAN 09/16/22 SP125 APT. BUILDING (42) UNIT - THIRD FLOOR PLAN 09/16/22 SP126 APT. BUILDING (42) UNIT - FOURTH FLOOR PLAN 09/16/22 SP127 APT. BUILDING (42) UNIT - ROOF PLAN 09/16/22 SP128 APT. BUILDING (42) UNIT - EXT. ELEVATIONS 09/16/22 SP129 APT. BUILDING (42) UNIT - EXT. ELEVATIONS 09/16/22 SP130 APT. BUILDING (42) UNIT - EXT. PERSPECTIVES 09/16/22 CIVIL SHEET NO. SHEET TITLE DATE C0.0 TITLE SHEET 09/16/22 C0.1 OVERALL SITE PLAN 09/16/22 C0.2 EXISTING CONDITIONS PLAN 09/16/22 C0.3 EASEMENT PLAN 09/16/22 C0.4 CONSTRUCTION FACILITIES PLAN 09/16/22 C1.0 SITE PLAN 11/28/22 C1.1 CIVIL SITE PLAN 09/16/22 C1.1A ENLARGED CIVIL SITE PLAN (EAST)11/28/22 C1.1B ENLARGED CIVIL SITE PLAN (WEST)11/28/22 C1.4 SHALLOW UTILITY PLAN 09/16/22 C2.0 WATER PLAN 09/16/22 C2.1 WATER DETAILS 09/16/22 C3.0 SEWER PLAN 09/16/22 C3.1 SEWER DETAILS 09/16/22 C4.0 GRADING & DRAINAGE PLAN 09/16/22 C4.0A ENLARGED GRADING PLAN (EAST)11/28/22 C4.0B ENLARGED GRADING PLAN (WEST)11/28/22 C4.0C ENLARGED DRAINAGE PLAN (EAST)11/28/22 C4.0D ENLARGED DRAINAGE PLAN (WEST)11/28/22 C4.1 DRAINAGE DETAILS 09/16/22 C5.0 PAVING PLAN 09/16/22 C5.1 SITE DETAILS 09/16/22 C5.2 SITE DETAILS 09/16/22 C6.0 SIGNAGE & STRIPING PLAN 09/16/22 LANDSCAPE SHEET NO. SHEET TITLE DATE L000 OVERALL SITE PLAN 11/28/22 L001 NOTES & LEGENDS 11/28/22 L002 NOTES & LEGENDS 11/28/22 L300 BOULEVARD & PARKING LOT PLANTINGS 11/28/22 L301 LANDSCAPE PLAN NORTHWEST 11/28/22 L302 LANDSCAPE PLAN NORTHEAST 11/28/22 L303 LANDSCAPE PLAN SOUTHWEST 11/28/22 L304 LANDSCAPE PLAN SOUTHEAST 11/28/22 L500 LANDSCAPE DETAILS 11/28/22 L502 LANDSCAPE DETAILS 11/28/22 L600 IRRIGATION WATER US CALCULATIONS 11/28/22 ELECTRICAL SHEET NO. SHEET TITLE DATE ES1.1 NORTHWEST - SITE LIGHTING 09/16/22 ES1.2 NORTHEAST - SITE LIGHTING 09/16/22 ES1.3 SOUTHWEST - SITE LIGHTING 09/16/22 ES1.4 SOUTHEAST - SITE LIGHTING 09/16/22 ES1.5 ELECTRICAL DETAILS 06/23/22 ES1.6 LIGHTING CUT SHEETS 06/23/22 ES1.7 NORTHWEST SITE PHOTOMETRICS 06/23/22 ES1.8 NORTHEAST SITE PHOTOMETRICS 06/23/22 ES1.9 SOUTHWEST SITE PHOTOMETRICS 06/23/22 ES1.10 SOUTHEAST SITE PHOTOMETRICS 06/23/22 ES1.11 BUILDING (A) EXT. PHOTOMETRICS 06/23/22 ES1.12 BUILDING (A) COURTYARD EXT. PHOTOMETRICS 06/23/22 ES1.13 BUILDING (B) EXT. PHOTOMETRICS 06/23/22 ES1.14 BUILDING (B) COURTYARD EXT. PHOTOMETRICS 06/23/22 ES1.15 BUILDING (C) EXT. PHOTOMETRICS 06/23/22 ES1.16 BUILDING (D) EXT. PHOTOMETRICS 06/23/22 ES1.17 BUILDING (E) EXT. PHOTOMETRICS 06/23/22 ES1.18 BUILDING (F) EXT. PHOTOMETRICS 06/23/22 ES1.19 BUILDING (G) EXT. PHOTOMETRICS 06/23/22 ES1.20 BUILDING (H) EXT. PHOTOMETRICS 06/23/22 ES1.21 BUILDING (I) EXT. PHOTOMETRICS 06/23/22 ES1.22 BUILDING (J) EXT. PHOTOMETRICS 06/23/22 ES1.23 BUILDING (K) EXT. PHOTOMETRICS 06/23/22 ES1.24 BUILDING (L) EXT. PHOTOMETRICS 06/23/22 ES1.25 BUILDING (M) EXT. PHOTOMETRICS 06/23/22 ES1.26 BUILDING (N) EXT. PHOTOMETRICS 06/23/22 ES1.27 BUILDING (O) EXT. PHOTOMETRICS 06/23/22 ES1.28 BUILDING (P) EXT. PHOTOMETRICS 06/23/22 ES1.29 BUILDING (Q) EXT. PHOTOMETRICS 06/23/22 ES1.30 BUILDING (Q) COURTYARD EXT. PHOTOMETRICS 06/23/22 ES1.31 BUILDING (R) EXT. PHOTOMETRICS 06/23/22 ES1.32 BUILDING (R) COURTYARD EXT. PHOTOMETRICS 06/23/22 ES1.33 BUILDING (S) EXT. PHOTOMETRICS 06/23/22 ES1.34 BUILDING (T) EXT. PHOTOMETRICS 06/23/22 ES1.35 BUILDING (U) EXT. PHOTOMETRICS 06/23/22 ES1.36 BUILDING (U) COURTYARD EXT. PHOTOMETRICS 06/23/22 ES1.37 BUILDING (42) EXT. PHOTOMETRICS 06/23/22 ES2.1 EXISTING STREET LIGHTING 06/23/22 ES2.2 NEW STREET LIGHTING 06/23/22 ES2.3 STREET LIGHTING DETAILS 06/23/22 ES2.4 STREET LIGHTING DETAILS 06/23/22 ES2.5 STREET LIGHTING PHOTOMETRICS 06/23/22 2 1 1 1 1 1 1 1 1 RC #01 2022-09-16 2 RC #02 2022-11-28 2 2 2 2 2 2 2 2 2