11 Engineering
CODY FLAMMOND
3/23/22 11:52 AM
Markup
9_Engineering Report.pdf
ENG- Water Demand Calculations
The applicant must finish the water design calculations and clearly demonstrate adequate water can be
provided to the development.
BMC 38.220.060
open See attached for the fire flow WaterCAD model Reviewer Response: CODY FLAMMOND - 7/14/22 2:28 PM
The applicant has not demonstrated that the required flows can be provided at the interior
hydrants.
----------------------------------------------------------
Responded by: Nicole Olmstead - 5/18/22 6:13 PM
THE CALCULATIONS HAVE BEEN UPDATED AND ARE INCLUDED WITHIN THE ENGINEERING
REPORT. SEE THE INCLUDED FIRE FLOW CURVE AS WAS PROVIDED BY CITY ENGINEERING.
1 Unresolved
14 Engineering
CODY FLAMMOND
3/23/22 11:52 AM
Markup
9_Engineering Report.pdf
ENG- Sewer Calculations
The applicant must analyze the sewer mains through the site and downstream to the Norton Ranch Lift
Station and demonstrate adequate capacity is available in the proposed and existing sewer mains. Per
DSSP V.B.2, the analysis must include demand from all the area outside of the study area that would be
naturally served through the study area (i.e. potential upstream development).
open See attached for the updated sewer calculations.Reviewer Response: CODY FLAMMOND - 7/14/22 3:59 PM
The sewer demand calculations must be revised per the calculation comments prior to the
Engineering Division reviewing if the applicant has adequately demonstrated sufficient capacity
is provided.
----------------------------------------------------------
Responded by: Nicole Olmstead - 5/18/22 6:13 PM
THE APPLICABLE SEWER MAINS THROUGHOUT THE SITE AND DOWNSTREAM HAVE BEEN
VERIFIED THAT ADEQUATE CAPACITY EXISTS. PLEASE SEE THE UPDATED ENGINEERING REPORT
FOR THAT NARRATIVE AND THE NEWLY INCLUDED FIGURE IN THE APPENDIX E.
1 Unresolved
16 Engineering
CODY FLAMMOND
3/23/22 4:47 PM
Markup
12_Engineering Report Appendix C.pdf
ENG- Reliance Pipe 2
Please verify that this pipe is 15-inch. The infrastructure viewer shows this as a 12-inch pipe.
open See attached sheet C5.3 from Norton East Ranch Phase 3C as-builts.Reviewer Response: CODY FLAMMOND - 7/8/22 2:42 PM
Please provide a copy of the as-built.
----------------------------------------------------------
Responded by: Nicole Olmstead - 5/18/22 6:13 PM
THE PIPE HAS BEEN VERIFIED TO BE A 15 INCH THROUGH AS-BUILT RESEARCH.
1 Unresolved
19 Engineering
CODY FLAMMOND
4/1/22 4:37 PM
Markup
6_CoB Waiver Request Preliminary Plat.pdf
ENG- Waivers from BMC 38.220.060 Information
The applicant must provide the required information for any sections not waived during the pre-
application review.
open See attached for the agreement from NWE showing the joint trench committee and it's partners.Reviewer Response: CODY FLAMMOND - 7/14/22 4:10 PM
The applicant must provide the required information for BMC 220.060.A.12.
----------------------------------------------------------
Responded by: Nicole Olmstead - 5/18/22 6:13 PM
NOTED, SEE BELOW.
1 Unresolved
22 Engineering
CODY FLAMMOND
4/1/22 4:37 PM
Markup
27_ConcurrentConstruction Form.pdf
ENG- Concurrent Construction
Per BMC 38.270.030, the development is not eligible for concurrent construction.
open Responded by: Nicole Olmstead - 5/18/22 6:13 PM
NOTED
1 Info Only
23 Engineering
CODY FLAMMOND
4/1/22 4:37 PM
Markup
6_CoB Waiver Request Preliminary Plat.pdf
ENG- 38.220.060.A.12 Non-Municipal Facilities
This information was not waived during pre-application review. The applicant must provide the
required information.
open See attached for the agreement from NWE showing the joint trench committee and it's partners.Reviewer Response: CODY FLAMMOND - 7/14/22 4:08 PM
Per BMC 220.060.A.12, the applicant must send a copy of the plat to all relevant utility
companies and provide written statements from each that the subdivision can be provided with
service. The applicant has reached out to NWE but must also reach out to and receive
responses from the other non-municipal utility companies.
----------------------------------------------------------
Responded by: Nicole Olmstead - 5/18/22 6:13 PM
NOTED, WE HAVE COORDINATED WITH NWE ON THE PROPOSED SUBDIVISION AND
THEY COORDINATE THROUGH THEIR JOINT TRENCH COMMITTEE TO OTHER PARTIES.
1 Unresolved
33 Engineering
CODY FLAMMOND
4/5/22 12:52 PM
Library Comment
DSSP Plans and Specifications Review Policy A. -Plans, specifications, and submittals for the following
public infrastructure improvements must be submitted to the City Engineering Department
(engsubmittals@bozeman.net) for infrastructure review: streets, water, wastewater, storm, and
lighting.
1 Info Only
34 Engineering
CODY FLAMMOND
4/5/22 1:05 PM
Library Comment
Only the general layout of the public infrastructure improvements was reviewed as part of the
Preliminary Plat review. Detailed review of the improvements design will be performed within the
Engineering Department's infrastructure review process.
1 Info Only
40 Engineering
CODY FLAMMOND
4/5/22 2:33 PM
Markup
21_ PreApplication Comment Response.pdf
ENG- Municipal Infrastructure Mains to the Western Boundary
Per BMC 38.410.070.A.3, Municipal infrastructure mains must be constructed to the boundary lines of
the tract to be developed, unless prevented by topography or other physical conditions. An exception
to this standard may be granted upon written request of the applicant if the applicant demonstrates
during the development review process that more efficient design can be accomplished without
jeopardizing the public's health, safety and welfare, the intent of this chapter, or the intent of the city's
growth policy.
open The water main has been extended to the western property boundary, see sheet C3.1 of the updated construction drawings.Reviewer Response: CODY FLAMMOND - 7/14/22 3:48 PM
The water line must extended to the western boundary.
----------------------------------------------------------
Responded by: Nicole Olmstead - 5/18/22 6:13 PM
NOTED, THROUGH FURTHER DISCUSSIONS WITH LYNN, THE WATER WILL BE EXTENDED
PAST THE TRAIL/SIDEWALK ON THE WEST SIDE OF EL DORADO FOR FUTURE USE, HOWEVER,
THERE IS NO LONGER A NEED FOR SEWER ALONG THAT STRETCH OF EL DORADO, SO NO
SEWER WILL BE EXTENDED WEST. AS WELL, THE ROW WILL BE PROVIDED BUT NOT
CONSTRUCTED AS THE PARK ALONG THE WESTERN BOUNDARY HAS BEEN FOUND TO BE MORE
IMPORTANT.
1 Unresolved
41 Engineering
CODY FLAMMOND
4/5/22 2:33 PM
Markup
21_ PreApplication Comment Response.pdf
ENG- Departures, Deviations, and Modifications
Per BMC 38.220.040.B.2, the applicant must provide a written statement describing any intended
departure, deviation, modification, non-compliance or alternative compliance to any standard
applicable to a subdivision review; providing a BMC citation to the authority authorizing the non-
compliance; and providing the applicable criteria of review.
open The water main has been extended to the western property boundary, see sheet C3.1 of the updated construction drawings.Reviewer Response: CODY FLAMMOND - 7/14/22 3:49 PM
The water line must extended to the western boundary or a deviation must be requested.
----------------------------------------------------------
Responded by: Nicole Olmstead - 5/18/22 6:13 PM
NOTED, HOWEVER IT HAS BEEN DISCUSSED THAT A DEVIATION IS NO LONGER
NECESSARY FOR THE PROJECT, PER DISCUSSIONS WITH LYNN.
1 Unresolved
42 Engineering
CODY FLAMMOND
4/5/22 2:33 PM
Markup
21_ PreApplication Comment Response.pdf
ENG- BMC 38.400.010.A.1 Variance
A variance from the requirements of BMC 38.400.010.A.1 is considered a subdivision variance and as
such must be requested and reviewed per the requirements in BMC 38.250.080.
open Fallon will be constructed to the boundary line, see sheet C5.0 of the updated construction drawings.Reviewer Response: CODY FLAMMOND - 7/14/22 3:51 PM
The variance must be requested if Fallon Street is not constructed to the western boundary.
----------------------------------------------------------
Responded by: Nicole Olmstead - 5/18/22 6:13 PM
NOTED, HOWEVER IT HAS BEEN DISCUSSED THAT A VARIANCE IS NO LONGER NECESSARY
FOR THE PROJECT, PER DISCUSSIONS WITH LYNN.
1 Unresolved
55 Engineering
CODY FLAMMOND
4/7/22 3:07 PM
Markup
20_UF Phase 1_Traffic Memo.pdf
ENG- Traffic Information
The information provided by the applicant is not adequate. The applicant must provide all the
information required in BMC 38.220.060.A.11.f through j.
open See attached for the preliminary traffic study that was completed for the entire 100ac subdivision build out.Reviewer Response: CODY FLAMMOND - 7/12/22 12:12 PM
The applicant has not provided the required information. The applicant must review the
referenced code section and provide all of the required information for the proposed
subdivision. Provision of this information has not been waived; therefore, it must be provided.
The proposed subdivision is a stand alone subdivision; therefore, the report must be for this
subdivision alone. When addressing subsection j, please note that if the choice between
38.270.030.B.1.b.1 and 38.270.030.B.1.b.2 is not designated at this stage, then the
requirements of 38.270.030.B.1.b.1 will be required prior to final plat.
----------------------------------------------------------
Responded by: Nicole Olmstead - 5/18/22 6:13 PM
THE TRAFFIC MEMO HAS BEEN FURTHER UPDATED TO REFLECT THE CURRENT
CONDITIONS, PROJECTED PEAK HOUR TRIPS (WHICH FALLS UNDER THE TYPICAL TIS REQUIRED
THRESHOLD) AND ALSO NOTES THAT THIS PHASE 1 IS PART OF A MUCH BIGGER TIS THAT
ENCOMPASSES PHASE 2 OF THE DEVELOPMENT AND THAT DRAFT TIS IS INCLUDED FOR YOUR
REVIEW.
1 Unresolved
61 Engineering
CODY FLAMMOND
4/13/22 3:07 PM
Markup
9_Engineering Report.pdf
ENG- Sewer Capacity in Norton Ranch Lift Station
The applicant must demonstrate that the sewer demands of the site fit within the sewer demand
allocated for this site in the most recent version of the Norton Ranch Lift Station Analysis.
open See attached for the updated sewer calculations Reviewer Response: CODY FLAMMOND - 7/14/22 4:00 PM
The sewer demand calculations must be revised per the calculation comments prior to the
Engineering Division reviewing if the applicant has adequately demonstrated sufficient capacity
is provided.
----------------------------------------------------------
Responded by: Nicole Olmstead - 5/18/22 6:13 PM
NOTED, WE ARE CURRENTLY WORKING WITH HDR/NORTON/STRATTON TO UPDATE
THE APPLICABLE REPORT, FLOW NUMBERS AND NECESSARY UPGRADES FOR THE LIFT STATION
TO HANDLE THE INCREASED AMOUNT OF FLOW FROM ALL THE APPROPRIATE PROJECTS.
1 Unresolved
79 Engineering
CODY FLAMMOND
7/8/22 5:02 PM
Markup
9.5_ Overall Sewer Main Analysis-NRLS.pdf
ENG-Sewer Calculation Area
The applicant must use the entire area in the sewer calculations and not discount right-of-way area
from the calculations. The applicant must update the calculations.
open See attached for the updated sewer calculations 3 Unresolved
80 Engineering
CODY FLAMMOND
7/12/22 2:42 PM
Markup
3_PRELIMINARY PLAT.pdf
ENG- Right-of-Way Width
Local streets must have 60 feet of right-of-way. The applicant must provide the full right-of-way width
for El Dorado Avenue.
open See the included prelimiary plat for the updated 60' right-of-way for Eldorado Avenue.3 Unresolved
81 Engineering
CODY FLAMMOND
7/14/22 4:17 PM
Markup
27_C5.5-STRIPING AND SIGNAGE PLAN.pdf
ENG- Alley Path Crossings
The applicant must provide striping for the pedestrian crossings in the alleys. The applicant should
consider providing pedestrian lighting at these locations, as well.
open 3 Info Only
82 Engineering
CODY FLAMMOND
7/14/22 4:33 PM
Markup
6_C1.0-OVERALL SITE PLAN.pdf
ENG- Radius on Alley Approach
The applicant should consider a whether a radius approach at this alley approach is warranted to
accommodate solid waste truck traffic turning right onto Eldorado Avenue.
open 3 Info Only
83 Engineering
CODY FLAMMOND
7/14/22 4:48 PM
Markup
31_L101 LANDSCAPE AND PARK PLAN.pdf
ENG- Trees in Street Vision Triangles
The applicant is encouraged to consider the street vision triangles during the placement of trees
adjacent to intersections and alley accesses.
open 3 Info Only
65 Fire Department
Scott Mueller
4/1/22 12:32 PM
Comment
As proposed Fire has no concerns at this time.
1 Info Only1
64 Forestry Division
Alex Nordquest
4/13/22 9:09 AM
Comment
No Forestry Division concerns at this time.
1 Info Only1
66 Northwestern Energy
Thomas Stewart
3/10/22 2:29 PM
Comment
See changemark comments.
1 Info Only1
67 Northwestern Energy
Matt Tilstra
3/11/22 12:07 PM
Comment
See changemark comments.
1 Info Only1
4 Northwestern Energy
Matt Tilstra
3/11/22 12:06 PM
Markup
3_PRELIMINARY PLAT.pdf
NWE - BL1 LT 5 Easement
NWE requires 10-foot PUE on all property lines adjacent to road R.O.W.
open 1 Info Only
70 Parks Department
Matthew Lee
6/27/22 12:13 PM
Comment
Update parkland tracking table on document 31_L101 to show net lot area, net density, required
parkland, provided parkland, and the remaining parkland to be provided as CILP.
Parkland Tracking Table has been updated to reflect current parkland dedication 3 Unresolved
71 Parks Department
Matthew Lee
6/27/22 12:16 PM
Comment
BMC 38.220.060.A.14.d. - Clarify if remaining parkland will be provided as CILP or IILP. Provide a
justification responding to review factors in Resolution 4784 for providing the remaining parkland as
CILP/IILP.
See new document with response to Resolution 4784 criteria 3 Unresolved
72 Parks Department
Matthew Lee
6/27/22 1:05 PM
Comment
BMC 38.220.060.A.14.b and 38.220.060.A.14.a.(6) - Provide irrigation information including but not
limited to main lines, lateral lines, heads, valves, GPM/PSI requirements, and well information.
Minimize the amount of irrigation lines that cross perpendicularly to the PUE. This is to minimize
amount of irrigation line that would need to be cut if works occurs in the PUE.
Irrigation information is found on sheet IR-1 3 Unresolved
74 Parks Department
Matthew Lee
6/27/22 1:29 PM
Comment
38.220.060.A.14.a.(13) and (14) - Include these two descriptions.
See Park Comment Response Letter.3 Unresolved
75 Parks Department
Matthew Lee
6/27/22 1:36 PM
Comment
Demonstrate that well used as water source will have enough capacity to irrigate all parks using it as a
source while also fitting within the city's current water conservation irrigation schedule.
See irrigation information on sheet IR-1 3 Unresolved