Loading...
HomeMy WebLinkAbout28_Stormwater Maintenance PlanStormwater Maintenance Plan Urban + Farm Phase 1 Major Subdivision All stormwater maintenance is the responsibility of the homeowner’s association. The maintenance required is as follows: 1. Clear catch basins, storm drain inlets, stormwater mains, outlet structures, gutters, of rocks, sediment, and debris as necessary. 2. Maintenance and inspection shall be completed annually and after large rain events. 3. Reference Norton Ranch Phases 5 and 1 for pond maintenance.