HomeMy WebLinkAbout21_ PreApplication Comment ResponseCycle Department Review Status Comments Additional Reviewer
Comments
Coordinator
Comments Comment Date Changemark
Snapshot
Comment
Status
Applicant Response
No Review Required 1/3/2022 12:17:20 PM
12/17/2021 11:54:56 AM Info Only
Review the comments in this
memorandum.
12/17/2021 2:43:43 PM Info Only
Review Complete 1/3/2022 12:17:20 PM
Review Complete Site layout OK with exception of
18 foot alley, minimum width 20
feet.
1/3/2022 12:17:20 PM
Review Complete No Forestry Division concerns at
this time.
1/3/2022 12:17:20 PM
Alley approaches must be constructed to meet the requirements of
Standard Drawing 2529-7A. The alley approach must be 20 feet wide
excluding the transitions. Including the transitions, the approach will
be 30 feet at the curb line.
1 Building Division babbey@bozeman.net
Review Comments
Engineering CFLAMMOND@BOZEM
AN.NETChangemarks
Review Comments
Fire Department smueller@bozeman.n
etReview Comments
Forestry Division anordquest@bozeman
.netReview Comments
Northwestern
Energy
thomas.stewart@nort
hwestern.com
ProjectFlow - Review Details Report
Project Name: 21431 Urban + Farm PA
Workflow Started: 11/16/2021 3:54 PM
Report Generated: 01/04/2022 03:20 PM
PLAN REVIEW COMMENTS
Reviewer
Department Review
Parks Department mjlee@bozeman.net
Review Comments
NOTED, ALL ALLEYS HAVE BEEN UPDATED TO REFLECT A 20' WIDTH.
Comments from Memo have been added to this spreadsheet.
NOTED, ALL ALLEY APPROACHES HAVE BEEN UPDATED TO MATCH THE STANDARD DRAWING.
ProjectFlow - Review Details Report
Project Name: 21431 Urban + Farm PA
Workflow Started: 11/16/2021 3:54 PM
Report Generated: 01/04/2022 03:20 PM
Review Complete 1/3/2022 12:17:20 PM
Revise and Resubmit 1/3/2022 12:17:20 PM
NorthWestern Energy (NWE) does not allow back or rear lot
installation of utilities as shown with the lots to the north fronting
parks B & C. Lots along S Eldorado Ave, S Laurel Parkway & Fallon
Street have lots fronting each of the streets where gas and electric
can be installed, within the 10-foot easement as shown. The lots
along the north side of the 30-ft alley have the 10-foot utility
easement along the north side of the lots which, does not have a
street access, and therefore does not meet NorthWestern Energy
requirements. Lots PA 26 Lots 7-15 & PA 17 Lots 2-9 do not meet
NWE utility location installation requirements fronting the park areas.
Lots PA 26 Lots 7-15 & PA 17 Lots 2-9 & including lots PA 26 Lots 6
& 16 & PA 17 Lot 1 will need a 10-foot utility easement adjacent to
the 30-foot alley along the inside, south portion of the lots to install
gas and electric utilities. Installing gas and electric utilities along the
north side of these lots, fronting the park, without a street access, is
not acceptable and will not be approved. • Submit a landscaping plan
to NWE for review to assure there will be no landscaping within the
utility easement for gas mains and electric primary or obstruction to
access to maintain electric and gas equipment.
1) A parkland calculation table is required to describe what amounts
of parkland and CILP are required and proposed in accordance with
38.420.020.A.1. - 0.03 acres of parkland must be dedicated per
every dwelling unit proposed up to the density cap. - Net residential
density is used to determine if the number of dwelling units reach
the density cap (see Sec. 38.700.130 for calculating Net Residential
Density). If the density cap has been met (aka maximum required
dedication per acre), no additional parkland dedication is needed
beyond that maximum required. This density cap is dependent on
zoning. - If CILP is proposed, please provide written justification per
Resolution 4784. - Cash-in-lieu of Parkland (CILP) appraisal value is
currently $2.07 PSF (effective June 22, 2021). Final CILP appraisal
value is determined at the time of final plan submittal. - Cash-in-lieu
of Parkland and Improvements-in-lieu of Parkland are used
interchangeably, however IILP provides a greater value to the City.
Trail and trailside enhancements are recommended to meet
any CILP requirements. - Provide a parkland tracking table on the
project Cover Sheet. 2) Linear parks must be 25’ wide minimum and
act as a corridor for recreation pathways per Sec. 38.420.070. -
Parks B & C are not considered as linear parks because they do not
align with any current or future recreation trails and do not provide
key connections. The prior subdivision to the north did not plan for
any trail adjacency in this location. These parcels would not be
accepted as parkland. - Park A does not meet the 25' minimum
width of a linear park. Parks Department recommends
continuity with the park adjacent to the north by
consolidating Block 1 residential lots into one linear park.
See planning for comments regarding S. El Dorado Ave alignment.
Review Comments
Parks Department mjlee@bozeman.net
Review Comments
Planning lhyde@bozeman.net
1
Northwestern
Energy
1) A Parkland Calculation Table has been added onto the Parks Plan Sheet
CILP is proposed for the difference between proposed dedicated acreage and the obligation
based on density cap. Written justification per Resolution 4784 is included in the submittal.
IILP for trail and trailside enhancements are preferred and will be utilized on mutually
agreeable amenities as outlined in the submittal.
NOTED, THE 'PUBLIC UTILITY EASEMENT' HAS BEEN UPDATED TO BE POSITIONED ALONG THE
ALLEYWAY, AFTER SHOWING NWE THAT ADEQUATE ROOM BETWEEN WATER/SEWER
SERVICES DOES EXIST.
ProjectFlow - Review Details Report
Project Name: 21431 Urban + Farm PA
Workflow Started: 11/16/2021 3:54 PM
Report Generated: 01/04/2022 03:20 PM
12/13/2021 11:23:00 AM Info Only
12/13/2021 11:23:00 AM Info Only
12/13/2021 11:23:00 AM Info Only
12/13/2021 11:26:50 AM Info Only NOTED- Sidewalks are planned throughout the development as specified in code.
12/13/2021 11:26:50 AM Info Only Landscape and irrigation plans for pedestrian ROW are included in submittal.
12/13/2021 11:26:50 AM Info Only Landscape plan for public lands are included in the submittal.
BMC 38.400.080 - Sidewalks. City standard sidewalks (including a
concrete sidewalk section through all private drive approaches) must
be constructed in all developments on all public and private street
frontages, except for alleys. The requirements of the city design
standards and specifications policy and the city modifications to state
public works standard specifications and per the block frontage
standards of division 38.510 apply. Sidewalks adjacent to public
lands. The developer must install sidewalks adjacent to public lands,
including, but not limited to, parks, open space, and the intersection
of alleys and streets or street easements. Applicable sidewalks and
development frontages adjacent to public lands are subject to the
provisions of section 38.510.030.I.
BMC 38.410.040.D - Rights-of-way for pedestrians. Landscape and
irrigation plans must be submitted with the preliminary plat
application for the required landscaping in these rights of ways with
the preliminary plat. This area must provide trees at one per every
fifty feet in place of street trees. Utilize species recommendations for
street trees. Maintenance of these rights of ways is the responsibility
of the property owners association and must be represented in the
POA documents required in BMC 38.220 part 2.
BMC 38.550.070 - Landscaping of public lands. - All perimeter street
boulevard, street trees and landscaping must be installed within one
year of final plat approval. Landscape plans for these areas must be
submitted with the preliminary plat application. Provide provisions
for phased improvements as necessary.
Planning
Changemarks
Checklists
1
NOTED, THE RIGHT OF WAY HAS BEEN EXTENDED TO THE WESTERN PROPERTY LINE AND THE
AREA WILL BE UTILIZED AS OPEN SPACE FOR THE FORESEEABLE FUTURE AND ACT AS PART OF
THE PARK AREA.
Sec. 38.420.070 - Linear parks. If consistent with the growth policy
or citywide park plan, and if reviewed and approved by the review
authority, linear parks must be dedicated to the city to provide
corridors for recreation pathways. The development review
committee discussed the proposed linear parks and found they are
not consistent with the goals of the City. The linear parks are
intended to connect destinations, which these corridors are not
connecting destinations. In addition, the properties to the north have
already developed this as their back yard with 6' tall privacy fencing.
This does not meet the 4' fence requirement. Once the sidewalk is
provided with connections to the proposed lots to the south, there
will not be sufficient green space remaining to act as a linear park.
BMC 38.400.010.A.1 Relation to undeveloped areas. When a
proposed development adjoins undeveloped land, and access to the
undeveloped land would reasonably pass through the new
development, streets and alleys within the proposed development
must be arranged to allow suitable development of the adjoining
undeveloped land. Extend Fallon St right of way to the edge of the
west property to connect to adjacent properties. While it does not
necessarily need to be developed at this date, the right of way does
need to be provided with the subdivision.
Consider straightening up the alignment of S Eldorado Ave to
provide true north/south alignment.
THE ALIGNMENT OF S EL DORADO WILL BE CONTINUED TO COINCIDE WITH THE EXISTING
ALIGNMENT/PHASE TO THE NORTH AND WILL BE REALIGNED WITH THE NEXT PHASE TO THE
SOUTH TO ALIGN WITH THE WESTERN PROPERTY BOUNDARY, PROVIDING A CONSISTENT
WESTERN LOT DEPTH.
The proposed park spaces that are not consistent with city goals were removed from the City
dedicated parkland area and will be maintained privately.
ProjectFlow - Review Details Report
Project Name: 21431 Urban + Farm PA
Workflow Started: 11/16/2021 3:54 PM
Report Generated: 01/04/2022 03:20 PM
12/17/2021 2:53:46 PM Info Only Surface Water information is included in the submittal
12/17/2021 2:59:18 PM Info Only
Review Complete 1/3/2022 12:17:20 PM
Review Complete with the use of individual
residential totes Solid Waste is ok
with this plan.
1/3/2022 12:17:20 PM
12/14/2021 11:55:47 AM Info Only
Review Complete 1/3/2022 12:17:20 PM
1/3/2022 12:17:20 PM
Review Complete 1/3/2022 12:17:20 PM
2 Parks Department mjlee@bozeman.net
BMC 38.220.030 - Subdivision pre-application materials. Required
materials for submittal. The waivers listed below are approved
(floodplains, vegetation, wildlife, historical features, agriculture, and
agricultural water user facilities). NOT APPROVED - Surface water.
Due to what appears to be a ditch on the east side of the site, we
are not approving the surface water waiver as additional information
is needed. Refer to engineering comments.
38.220.030 Subdivision pre-application plan. Note that items 13
(wildlife), 14 (waivers of right to protest), and 15 (water rights)
were not submitted as is required for the subdivision pre app.
Because these items were not submitted, staff has not provided a
review or comment on them. If you would like pre app comments on
these items prior to submitting for preliminary plat, please provide
additional information for staff to review.
Streets Division jvandelinder@bozema
n.netReview Comments
Water and Sewer
Division
jalston@bozeman.net
Review Comments
Solid Waste rward@bozeman.net
Review Comments
Stormwater Division AOliver@bozeman.ne
Changemarks
Review Comments
Planning Checklists
Review Comments
1
NOTED, THE INFORMATION PROVIDED WAS THAT WHICH WAS REQUESTED BY THE PRE-
APPLICATION PROCESS IN THE MUNICODE. FURTHER INFORMATION ON THE STORMWATER
SIDE IS INCLUDED WITH THE PRELIMINARY PLAT APPLICATION, SEE THE INCLUDED PLAN SET
AND STORMWATER ENGINEERING REPORT
Individual residential totes will be utilized in this subdivision
BMC 38.220.030.A.3 The provided stormwater utility information is
insufficient to determine if capacity exists offsite or if impoundment
would be required within this subdivision. Also consider BMC Sec.
38.220.120 and Sec. 38.430.090 for requirements related to
stormwater that will be required beyond the pre-app stage of
review.
Additional waiver requests are included in this submittal.
ProjectFlow - Review Details Report
Project Name: 21431 Urban + Farm PA
Workflow Started: 11/16/2021 3:54 PM
Report Generated: 01/04/2022 03:20 PM
Review Complete 1/4/2022 11:35:50 AM
NOTED, AN UPDATED LIST OF WAIVER REQUESTS HAS BEEN UPDATED AND INCLUDED WITH
THE PRELIMINARY PLAT APPLICATION, IN REFERENCE TO THE UPDATED ORDINANCE 2089.
ADDITIONAL WAIVERS ARE BEING SOUGHT NOW WITH THE NEW LIST AND CLARIFICATIONS
ON PREVIOUS QUESTIONS.
NOTED, DOCUMENTS FOR THE DRAIN TILE SYSTEM HAVE BEEN RECEIVED AND ARE SHOWN
ON THE APPLICABLE PLAN SHEETS AND PLAT (EASEMENT). THE DEVELOPMENT WILL NOT
AFFECT THE DRAIN TILE SYSTEM, HOWEVER, DEPENDING ON THE ACTUAL IN-FIELD LOCATION,
A SLIGHT UPDATE MAY BE NECESSARY.
A RESPONSE TO THESE HAVE BEEN INCLUDED WITH THE ADDITIONAL WAIVER REQUESTS THAT
WERE MISSED DURING THE PRE-APPLICATION PHASE.
NOTED.
2 Parks Department
Review Comments • Proposed parks are currently non compliant. Linear parks must be
25’ wide minimum and act as a corridor for recreation pathways per
Sec. 38.420.070. a) Park A does not meet the 25' width. b) Parks B
and C do not connect to any existing or proposed trail corridors and
would not be counted. • Staff recommends removing parcel lots
west of El Dorado and consolidating all parkland at this location to
provide a large enough area for recreation activities per Sec.
38.420.050. a) This also provides enough space for the N/S trail
connection that will connect to the Urban + Farm subdivision to the
south per Sec. 38.420.070. • Per Resolution 4784, staff recommends
using IILP for the park trail corridor. Please contact park planning
staff for potential IILP.
Proposed linear park has been widened to comply with the 25 ft minimum. The additional
areas have been removed from the land dedication. As recommended by staff, IILP are under
consideration for the park trail corridor.
Cody FlammondEngineering 1. BMC 38.220.030.A‐ The applicant did not provide the following
with the pre‐application plan; therefore, comment has not been
provided for these items.
a. Item 13‐ Wildlife
b. Item 14‐ Waivers of right to protest
c. Item 15‐ Water rights
Engineering does not support granting waivers from the
requirements of BMC 38.220.060 for the surface water and
agricultural water user facilities supplements.
2. The applicant is advised that a drain tile system and easement
associated with the Norton East Ranch Phase 4 Subdivision is
present on the property. The applicant must show the location of
drain tile system and easement on the plans. The applicant’s
development must not negatively impact the drain tile system.
Applicant must show all existing easements on the plat.
ProjectFlow - Review Details Report
Project Name: 21431 Urban + Farm PA
Workflow Started: 11/16/2021 3:54 PM
Report Generated: 01/04/2022 03:20 PM
A DRAINAGE PLAN AND STORMWATER CALCULATIONS ARE INCLUDED WITH THE
PRELIMINARY PLAT APPLICATION.
A DRAINAGE PLAN AND STORMWATER CALCULATIONS ARE INCLUDED WITH THE
PRELIMINARY PLAT APPLICATION, INCLUDING THE EXISTING NORTON RANCH STORMWATER
POND.
NOTED, THE GROUNDWATER IS NOT ANTICIPATED TO IMPACT THE PROPOSED STORMWATER
UTILITIES AS THE EXISTING INFRASTRUCTURE INSTALLED WITH PREVIOUS PHASES OF NORTON
RANCH WILL BE UTILIZED. GROUNDWATER MONITORING DATA IS INCLUDED WITH THIS
APPLICATION FOR THE ENTIRE 100 ACRES.
NOTED, THE GROUNDWATER LEVELS HAVE BEEN MONITORED ON THE ENTIRE REMAINING
PARCEL OVER THE LAST YEAR AND THE RESULTS ARE INCLUDED WITH THE PRELIMINARY PLAT
APPLICATION.
NOTED, CILWR WILL BE CALCULATED & PAID PRIOR TO FINAL PLAT APPROVAL.
THIS PARCEL WAS ORIGINALLY ALLOCATED CAPACITY (PER NORTON RANCH) AND THE
DEVELOPMENT GROUP IS WORKING WITH HDR/STRATTON/PH6 FOR THE APPROPRIATE
UPGRADES TO THE NRLS PRIOR TO FINAL PLATTING ANY OF THE NEARBY PROJECTS.
Cody FlammondEngineering
1. BMC 38.410.070.A ‐ As presented, wastewater generated from
the subject property will flow into the existing Norton Ranch Lift
Station (NRLS). The subject property was not originally allocated
capacity at the lift station. The NRLS does not currently meet DEQ
firm capacity requirements. A lift station design report has been
completed by HDR Engineering, Inc. to allow for phased upgrades to
the NRLS including the subject property. The lift station must be
upgraded in accordance with the HDR design report prior to Final
Plat approval.
1. DSSP Section II (A.4) ‐ Water Quality ‐ The applicant must include
a drainage plan with post‐ construction storm water management
controls that are designed to infiltrate, evapotranspire, and/or
capture for reuse the post‐construction runoff generated from the
first 0.5 inches of rainfall from a 24‐hour storm preceded by 48
hours of no measurable precipitation. For projects that cannot meet
100% of the runoff reduction requirement, the remainder of the
runoff from the first 0.5 inches of rainfall must be either: a. Treated
onsite using post‐construction storm water management control(s)
expected to remove 80 percent total suspended solids (TSS); b.
Managed offsite within the same sub‐watershed using
post‐construction storm water management control(s) that are
designed to infiltrate, evapotranspire, and/or capture for reuse; or
c. Treated offsite within the same subwatershed using
post‐construction storm water management control(s) expected to
remove 80 percent TSS.
2. DSSP Section II.C ‐ Water Quantity ‐ The applicant must provide
on‐site detention with release rates limited to predevelopment
runoff rates. Retention features must be sized based on a 10‐ year,
2‐hour storm intensity.
3. Montana Post‐Construction Storm Water BMP Design Guidance
Manual ‐ Seasonal High Groundwater ‐ The proposed project is
located in an area that is known to have seasonally high
groundwater. The applicant must demonstrate that seasonal high
groundwater will not impact the function or maintenance of the
proposed facilities. Industry guidance recommends a three‐ foot
minimum separation from the bottom of the proposed facility to
the underlying groundwater table.
4. The applicant is advised that with the preliminary plat
application, the applicant must establish the seasonal minimum and
maximum depth to the water table, dates on which these depths
were determined, and the location and depth of all known aquifers
which may be affected by the proposed subdivision.
BMC 38.410.130 (A) (1) Water rights ‐ The applicant must contact
Griffin Nielsen with the City Engineering Department to obtain a
determination of cash‐in‐lieu of water rights (CILWR). CILWR must
be paid prior to final plat approval.
ProjectFlow - Review Details Report
Project Name: 21431 Urban + Farm PA
Workflow Started: 11/16/2021 3:54 PM
Report Generated: 01/04/2022 03:20 PM
NOTED AND AGREED, THE WATER/SEWER MAINS ARE SHOWN WITH 10' MIN OF SPACING
BETWEEN LINES.
THE PROPOSED WATER & SEWER MAINS ARE CURENTLY SHOWN TO EXTEND TO THE WESTERN
EDGE OF THE EL DORADO ROW, NOT TO THE PROPERTY LINE, AS THE PROPERTY TO THE WEST
IS UNDER A CONSERVATION EASEMENT AND THE DEVELOPER WOULD LIKE TO RESPECT THAT
AND NOT INSTALL UNDERGROUND INFRASTRUCTURE RIGHT UP TO THE BOUNDARY.
HOWEVER, THESE MAINS ARE IN THE FALLON ROW AND COULD BE EXTENDED AT ANY TIME,
ONCE THE CONSERVATION DISTRICT IS DISSOLVED.
NOTED AND AGREED, THE CORROSION POTENTIAL HAS BEEN ESTABLISHED BY THE CRITERIA
SET FORTH BY DIRPA, AND THE DATA TO SUPPORT DIRPA RECOMMENDATION #2 IS INCLUDED
WITH THE APPLICATION, THE V-BIO ENHANCED POLYETHYLENE ENCASEMENT.
Cody FlammondEngineering
2. DSSP Section V (D) – Water and sanitary sewer mains and services
shall be arranged so that there is a minimum of ten feet of
horizontal separation between these lines.
3. BMC 38.410.070.A.3 ‐ When a proposed development adjoins
undeveloped land, and municipal infrastructure mains would
reasonably pass through the new development to the undeveloped
land, municipal infrastructure mains must be arranged to allow the
suitable development of the adjoining undeveloped land. Municipal
infrastructure mains within the proposed development must be
constructed to the boundary lines of the tract to be developed,
unless prevented by topography or other physical conditions. An
exception to this standard may be granted upon written request of
the applicant if the applicant demonstrates during the development
review process that more efficient design can be accomplished
without jeopardizing the public's health, safety and welfare, the
intent of this chapter, or the intent of the city's growth policy.
a. Water and wastewater mains must be extended to the
development’s west boundary.
4. The applicant is advised that due to the known high groundwater
and soil conditions within the proposed area of development an
increased rate of corrosion has been observed with ductile iron
water mains, thus decreasing the longevity of publicly owned and
maintained infrastructure. The applicant must provide corrosion
protection for all future water mains within the development and
identify how the mains will be protected with future infrastructure
submittal. Acceptable protection methods include zinc coated
ductile iron or v‐bio enhanced polyethylene encasement of the
main.
Corrosion protection can be waived, if the applicant can
demonstrate that corrosion protection is not applicable for the
proposed development. Typically, in order for a waiver to be
granted, the applicant must consult the latest American Water
Works Association and Ductile Iron Pipe Research Association
(DIRPA) documentation for testing\evaluation procedures and
provide an analysis demonstrating that corrosion protection is not
needed throughout the entire development.
ProjectFlow - Review Details Report
Project Name: 21431 Urban + Farm PA
Workflow Started: 11/16/2021 3:54 PM
Report Generated: 01/04/2022 03:20 PM
NOTED, AND WE ARE REQUESTING, AS NOTED ABOVE, THAT THE ROW WILL BE PROVIDED TO
THE WESTERN PROPERTY BOUNDARY, HOWEVER THE ROADWAY WILL NOT BE BUILT AND THE
LAND WILL BE UTILIZED AS PRIVATE OPEN SPACE UNTIL THE DAY THE CONSERVATION
EASEMENT IS DEVELOPED/DISSOLVED.
NOTED AND AGREED, THE MINIMUM WIDTH HAS BEEN UPDATED.
NOTED, THE STREET LIGHTING PLANS HAVE BEEN INCLUDED WITH THE APPLICATION.
Cody Flammond
2. The applicant is advised that alleys to be used for fire access
must have a minimum paved width of 20 feet and allow for turn
movements with 28‐foot turn radii.
3. BMC 38.400.070 Street Lighting ‐ City standard street lights are
required at the street intersections and mid‐block crossings.
Infrastructure plans for the construction for the street lights must
be submitted to the City Engineering Department per the Design
Standards and Specifications Policy Manual. The street lights must
be part of an SILD prior to final plat approval.
Engineering
1. BMC 38.400.010 (A) (1) Relation to undeveloped areas ‐ When a
proposed development adjoins undeveloped land, and access to the
undeveloped land would reasonably pass through the new
development, streets and alleys within the proposed development
must be arranged to allow the suitable development of the
adjoining undeveloped land. Streets and alleys within the proposed
development must be constructed to the boundary lines of the tract
to be developed, unless prevented by topography or other physical
conditions. If the development being reviewed is a subdivision, a
request for an alteration of this standard must be processed as a
subdivision variance.
a. Fallon Street must be extended to development’s west boundary.