Loading...
HomeMy WebLinkAbout20_UF Phase 1_Traffic Memo 2304 N. 7TH AVENUE | SUITE L | BOZEMAN, MT 59715 | (406) 587-2781 Professional Consulting Engineers and Land Surveyors Equal Opportunity Employer | www.hyaliteeng.com February 25, 2022 City of Bozeman Engineering Alfred M. Stiff Professional Building PO Box 1230 Attn: Cody Flammond RE: Urban + Farm Subdivision Phase 1 Traffic Memorandum Bozeman, Gallatin County, Montana Dear Cody: Hyalite Engineers performed a trip generation estimate for the lots included in the PA 17 and PA 26 areas of the Urban + Farm Subdivision. PA 17 and PA 26 will be constructed in phase 1 of this development and include 46 single-family detached housing units. Enclosed with this memorandum in Appendix A is a set of figures to display the project location and the subdivision layout for PA 17 and PA 26. Below is a list of the figures enclosed: Figure 1: Site Location Figure 2: Subdivision Layout The trip generation analysis was performed using generation rates found in the Trip Generation; 10th Edition published by the Institute of Transportation Engineers (ITE) for estimating average vehicle trip ends based on Land Use Cod 210 – Single-Family Detached Housing. PA 17 and PA 26 are projected to generate a total of 460 average weekday trips as well as 35 weekday AM and 46 weekday PM peak hour trips. The results of this analysis are included in Appendix B. Phase 1 of the Urban + Farm Subdivision will have minimal impacts on the transportation system in the area of the development and will not require a traffic study to investigate the impacts. PA 17 and PA 26 will be included in a full traffic study for the entire Urban + Farm Development, which will analyze all of the impacts that traffic from this development will have on the transportation system as a whole. Let me know if you have any questions regarding this traffic memorandum, or if anything else needs to be provided or clarified. Please give me a call or send an email to bmegaard@hyaliteeng.com with any questions. Sincerely, Brett Megaard, P.E. Project Manager Enclosed: Appendix A: FIGURES Appendix B: TRIP GENERATION ESTIMATE U R B A N + F A R M S U B D I V I S I O N P H A S E 1 F E B R U A R Y 2 0 2 2 A P P E N D I X APPENDIX A FIGURES M:\203430\Traffic Impact Study\PA 17 + 26.dwgSITE LOCATION FIGURE 1 JOB NUMBER : SHEET : SCALE :1" = 1000' 1 OF 101000'2000' DATE : W E B : w w w . h y a l i t e e n g . c o m 2304 NORTH 7TH AVENUE STE. L B O Z E M A N , M T 5 9 7 1 8 P H O N E : ( 4 0 6) 5 8 7 - 2 7 8 1 F A X : ( 4 0 6 ) 5 2 2 - 9 2 2 5 PROJECT LOCATION COTTONWOOD ROADFEB 2022 203430 URBAN + FARM SUBDIVISION PHASE 1 HUFFINE LANE FALLON STREET BABCOCK STREET GOOCH HILL ROADLAUREL PKWYELDORADO AVE M:\203430\Traffic Impact Study\PA 17 + 26.dwgSUBDIVISION LAYOUT FIGURE 2 JOB NUMBER : SHEET : SCALE :NTS 1 OF 1 DATE : W E B : w w w . h y a l i t e e n g . c o m 2304 NORTH 7TH AVENUE STE. L B O Z E M A N , M T 5 9 7 1 8 P H O N E : ( 4 0 6) 5 8 7 - 2 7 8 1 F A X : ( 4 0 6 ) 5 2 2 - 9 2 2 5 203430 FEB 2022URBAN + FARM SUBDIVISION PHASE 1 U R B A N + F A R M S U B D I V I S I O N P H A S E 1 F E B R U A R Y 2 0 2 2 A P P E N D I X APPENDIX B TRIP GENERATION ESTIMATE ITE Quantity In Out Total In Out Total In Out LUC Land Use 25%75%63%37%50%50% 210 Single-Family Detached Housing 21 4 12 16 13 8 21 105 105 210 PA 17 Rate:Rate:Rate: 210 Single-Family Detached Housing 25 5 14 19 16 9 25 125 125 250 PA 26 Rate:Rate:Rate: TOTALS:46 9 26 35 29 17 46 230 230 460 0.74 / UNIT 0.99 / UNIT 9.94 / UNIT 0.74 / UNIT 0.99 / UNIT 9.94 / UNIT Urban + Farm Subdivision Phase 1 Traffic Impact Study Trip Generation Estimate - Single-Family Detached Housing Weekday Morning Peak Hour Weekday Evening Peak Hour Daily Trips