Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
18.2_Norton Phase 4 Groundwater Data
Project Engineer:Matt H Project: Well Information:bgs = below ground surface ags = above ground surface MW-1 MW-2 MW-3 MW-4 10'10'10'10' 0.58 1.71 0.71 0.92 Groundwater Information: MW-1 MW-2 MW-3 MW-4 02/14/18 6.81 6.29 4.20 4.38 03/13/18 6.94 6.39 4.20 4.34 04/13/18 6.10 5.10 3.12 3.30 05/11/18 6.87 6.36 4.20 4.35 05/25/18 6.78 6.18 4.14 4.31 06/08/18 6.99 6.62 4.37 4.54 06/22/18 6.30 6.51 4.48 4.60 07/06/18 8.64 8.21 5.91 6.10 07/20/18 7.49 7.32 4.85 5.10 08/03/18 7.47 7.32 4.85 5.21 08/17/18 7.57 7.10 5.00 5.21 08/30/18 7.15 6.82 4.50 4.70 09/14/18 7.25 6.85 4.65 4.80 Monitor Well Data Project Number:161140 Norton East Ranch Subdivision, Phase 4 Project Location:Bozeman Well ID Well Depth (feet-bgs) Top of Well (feet-ags) Date Depth to Ground Water (feet-bgs) BB+z z2:1 Δσ EtBqH DCompressible soil layerRigid soil layer