Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
18.1_Mayfly Groundwater Monitoring data
URBAN + FARM PHASE 1 Groundwater Monitoring Date: 5/18/2022 By: Miguel Ley, EI Project #: 203430 DATE MAYFLY MW#1 (ft) MAYFLY MW#2 (ft) 23-Apr-22 3.25 2.84 1-May-22 3.32 2.94 4-May-22 2.92 2.49 11-May-22 3.11 2.74 18-May-22 3.34 3.00 L:\203430\Computations\GROUNDWATER MONITORING\Groundwater Monitoring.xlsx