Loading...
HomeMy WebLinkAbout32_E001_SITE LIGHTING PLANSBLOCK 1LOT 1BLOCK 1LOT 2BLOCK 1LOT 3BLOCK 1LOT 4BLOCK 1LOT 5BLOCK 1LOT 6BLOCK 1LOT 7BLOCK 1LOT 8BLOCK 1LOT 9BLOCK 1LOT 10BLOCK 1LOT 20BLOCK 1LOT 21BLOCK 1LOT 19BLOCK 1LOT 18BLOCK 1LOT 17BLOCK 1LOT 16BLOCK 1LOT 15BLOCK 1LOT 14BLOCK 1LOT 13BLOCK 1LOT 12BLOCK 1LOT 11BLOCK 2LOT 1BLOCK 2LOT 2BLOCK 2LOT 3BLOCK 2LOT 4BLOCK 2LOT 5BLOCK 2LOT 10BLOCK 2LOT 9BLOCK 2LOT 8BLOCK 2LOT 7BLOCK 2LOT 6OPENSPACEDOPENSPACEBOPENSPACE COPENSPACE APARK A18,984 SF0.44 AC#10 AWG,#10 GND IN1" CONDUITT#10 AWG,#10 GND IN2" CONDUIT#10 AWG,#10 GND IN2" CONDUIT213TYP221.UNDERGROUND FEED - SCHEDULE 80 PVC. REFER TO FIGURE 1 SHEET E002FOR ALL CITY OF BOZEMAN SPECIFICATIONS.2.FIXTURE LOCATION TYPICAL - REFER TO FIGURES 2,3 AND 4 SHEET E002 FORALL CITY OF BOZEMAN REQUIREMENTS AND SPECIFICATIONS.3.LIGHTING CONTROL CENTER CABINET REFER TO DETAILS 2,3,7A AND 7BSHEET E002 FOR ALL CITY OF BOZEMAN REQUIREMENTS ANDSPECIFICATIONS. CONSULT WITH CITY OF BOZEMAN ENGINEERING DEPT FORLOCATION OF PANEL AND PANEL LABELING REQUIREMENTS. FINAL LOCATIONOF UTILITY TRANSFORMER AND CONTROL CENTER CABINET TO BEDETERMINED AND COORDINATED WITH NWE. FINAL CONDUIT ROUTING TO BEDETERMINED UPON DETERMINATION OF UTILITY TRANSFORER AND CONTROLCABINET LOCATION.SHEET WORK NOTES?A.COMPLY WITH LATEST VERSION ON NEC AND ALL APPLICABLE CODES ANDSTANDARDS.GENERAL NOTESLIGHT FIXTURE SCHEDULETypeManufacturerCatalog NumberLocationTypeHeightLampFinishVoltageWattageRemarksS1AALUCM2 ANG 36L 260 3K7 3 DL HS DF UNVSITElll15'-0"LEDBLACK24038 NOTE 1AALRSS-A-14-1-ULPOLEBLACK NOTE 1S2AALUCL2 ANG 72L 480 3K7 3 DL HS DF UNVSITEIII25'-0"LEDBLACK24059 NOTE 1AALRSS-A-25-1-ULPOLEBLACK NOTE 1B1LITHONIADSXB LED 12C 350 30K ASY 240 DMG DF H30SITEASY30"LEDBLACK24016NOTES1. PROVIDE POLE AND FIXTURE MOUNTING ARMS - COORDINATE ALL REQUIREMENTS AND SPECIFICATIONS PER SECTIONS XVI OF THE DESIGN STANDARDS AND SPECIFICATIONS POLICY -CITY OF BOZEMAN MT.PANEL 'SITE'LOCATION:SITE LIGHTING CONTROL CABINETAMPS:100MINIMUM AIC:22 KAICTYPE OF MAIN:VOLTS:120/240MOUNT:SURFACEMANUFACTURER:PHASE1WIRE3NOTES:3RTYPE:LOAD CIRCUIT DESCRIPTIONCKTPBRKRVOLTABVOLTBRKRPCKT CIRCUIT DESCRIPTIONLOADTYPENOAMPAMPSAMPSAMPNOTYPEFIXTURES - CROSS WALK & INTERSECTION12202382382022SPARE****3***238238***4****FIXTURES - BOLLARDS522016162026SPARE7***1616***8****SPARE9220110SPACE11***112SPACESPARE13220114SPACE15***116SPACE254254CONNECTED PHASE VA2.1A2.1ACONNECTED PHASE AMPSPANEL 'SITE'2/25/2022 1:28 PMDRAWN BY |REVISIONS©| ALL RIGHTS RESERVEDCHECKED BY |®PROJECT #|URBAN + FARM MP - PHASE 1 OUTLAW PARTNERS, BIG SKY, MONTANA BOZEMAN, MONTANAPRELIMINARY PLAT02.28.20222022OUTLAW_UFMP1E001LIGHTING SITE PLANNTS06.29.17 11:09 PM | L:\OUTLAW_UFMP\BIMCAD\Elec\OUTLAW_UFMP_E001.dwgE001SITE LIGHTING PLANS & SCHEDULESERICKSONRev 2 - 09.15.2022GIESER