Loading...
HomeMy WebLinkAbout038_A2.5 BUILDINGS 3-6 - UPPER FLOOR FRAMINGGENERAL NOTES1. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND JOB SITE CONDITIONS BEFORE COMMENCING WORK AND SHALL REPORT ANY DISCREPANCIES TO THE ARCHITECT.2. GENERAL CONTRACTOR TO COORDINATE ARCHITECTURAL DRAWINGS WITH MECHANICAL, ELECTRICAL, AND PLUMBING.APPLICABLE CODES:2018 INTERNATIONAL BUILDING CODE 2018 UNIFORM PLUMBING CODE 2018 INTERNATIONAL MECHANICAL CODE 2017 NATIONAL ELECTRIC CODE 2018 INTERNATIONAL FUEL GAS CODE2018 INTERNATIONAL ENERGY CONSERVATION CODEDESIGN CRITERIASEISMIC ZONE D01A4.13A4.15A4.1HEADERHEADER2X6 BEARING WALL2X6 BEARING WALL2X6 BEARING WALL5 1/8" X 24" GLULAM (FLUSH)2X6 BEARING WALLBALLOON FRAME WALL2X6 BEARING WALL2X6 BEARING WALL2X6 BEARING WALL2X6 BEARING WALL2X6 BEARING WALL2X6 BEARING WALLHEADERHEADERHEADERHEADER(3) 2X10(2) 2X10HEADERHEADERHEADERHEADERHEADER5 1/8" X 15" G.L.2X6 BEARING WALLHEADERHEADER2X6 BEARING WALLBALLOON FRAME WALLHEADERHEADER2X6 BEARING WALL2X6 BEARING WALL2X6 BEARING WALL9 1/2" TJI @ 16" O.C.16" FLOOR TRUSSES @ 16" O.C.16" FLOOR TRUSSES @ 16" O.C.9 1/2" TJI @ 16" O.C.2X6 BEARING WALL6X66X66X66X615S3.215S3.2TYP.TYP.516S3.116S3.1(3) 2X1013S3.113S3.114S3.1615S3.112S3.112S3.115 1/8" X 15" G.L.25 1/8" X 24" GLULAM (FLUSH)PROVIDE SIMPSON ECC 5 1/4-6, SEE DETAIL 11/3.2PROVIDE SIMPSON ECC 5 1/4-6, SEE DETAIL 11/3.216S3.116S3.114S3.11 3/4" X 16" LVL313S3.113S3.11 3/4" X 16" LVL4FRAMING NOTES1. USE (3) 2X6 POSTS U.N.O.2. USE (2) 2X10 HEADERS U.N.O.(406) 552-4490www.blackmountainarch.comBLACK MOUNTAIN ARCHITECTURE 2020A2.5UPPER FLOORFRAMINGSWISS PLAZA DUPLEXBUILDING XXXXX N. 27th AVENUE, BOZEMAN, MONTANAPERMIT SETJULY 13, 2022200241/4" = 1'-0"1UPPER FLOOR FRAMING