Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
039_A2.6 BUILDINGS 3-6 - TERRACE FLOOR FRAMING
GENERAL NOTES1. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND JOB SITE CONDITIONS BEFORE COMMENCING WORK AND SHALL REPORT ANY DISCREPANCIES TO THE ARCHITECT.2. GENERAL CONTRACTOR TO COORDINATE ARCHITECTURAL DRAWINGS WITH MECHANICAL, ELECTRICAL, AND PLUMBING.APPLICABLE CODES:2018 INTERNATIONAL BUILDING CODE 2018 UNIFORM PLUMBING CODE 2018 INTERNATIONAL MECHANICAL CODE 2017 NATIONAL ELECTRIC CODE 2018 INTERNATIONAL FUEL GAS CODE2018 INTERNATIONAL ENERGY CONSERVATION CODEDESIGN CRITERIASEISMIC ZONE D01A4.1BUILT-IN SLOPE 1/8":1'-0"16" ROOF TRUSSES @ 24" O.C.HEADERHEADERHEADERHEADERHEADERBALLOON FRAME WALL2X6 BEARING WALL2X6 BEARING WALL2X6 BEARING WALLHEADER2X6 BEARING WALL2X6 BEARING WALL2X6 BEARING WALL(2) 2X10(2) 2X10HEADERBALLOON FRAME WALL(3) 1 3/4" X 18" LVL2X6 BEARING WALL2X6 BEARING WALL(2) 2X10BUILT-IN SLOPE 1/8":1'-0"16" ROOF TRUSSES @ 24" O.C.1/8": 12"1/8": 12"2X6 BEARING WALLTRUSSES @ 16" O.C.22" FLOORTRUSSES @ 16" O.C.22" FLOOR25HEADER5S3.27714S3.1(2) 2X1031 3/4" X 18" LVL613S3.110S3.28S3.210S3.26S3.2116S3.14S3.24S3.215S3.1(3) 1 3/4" X 18" LVL16S3.11 3/4" X 18" LVL14S3.113S3.14FRAMING NOTES1. USE (3) 2X6 POSTS U.N.O.2. USE (2) 2X10 HEADERS U.N.O.(406) 552-4490www.blackmountainarch.comBLACK MOUNTAIN ARCHITECTURE 2020A2.6TERRACEFLOORFRAMINGSWISS PLAZA DUPLEXBUILDINGS 3-6N. 27th AVENUE, BOZEMAN, MONTANAPERMIT SETNOVEMBER 15, 2022200241/4" = 1'-0"1TERRACE FLOOR FRAMING