HomeMy WebLinkAbout008_C5.3-PH 3-CONSTRUCTION DETAILS 415.75"15.75"33.86"28.15"
28.15"33.86"15.75"28.15"15.75"17.32"28.15"17.32"LENGTH = 28.15 IN. (715 MM)
WIDTH = 15.75 IN. (400 MM)
HEIGHT = 33.86 IN. (860 MM)
TANK VOLUME = 8.69 CF
STORAGE VOLUME = 8.25 CF
VOID INTERNAL VOLUME: 95%
VOID SURFACE AREA: 90%
GEOMETRY:33.4 PSI, (MODULE ONLY)
HS25, (WITH ACF COVER SYSTEM)
100% RECYCLED
POLYPROPYLENE
5/10
LOAD RATING:
MATERIAL:
SMALL PLATES PER
SEGMENT/TOTAL:
LENGTH = 28.15 IN. (715 MM)
WIDTH = 15.75 IN. (400 MM)
HEIGHT = 17.32 IN. (440 MM)
TANK VOLUME = 4.44 CF
STORAGE VOLUME = 4.22 CF
VOID INTERNAL VOLUME: 95%
VOID SURFACE AREA: 90%
GEOMETRY:
MODULE DATA
33.4 PSI, (MODULE ONLY)
HS25, (WITH ACF COVER SYSTEM)
100% RECYCLED
POLYPROPYLENE
5/5
LOAD RATING:
MATERIAL:
SMALL PLATES PER
SEGMENT/TOTAL:
NOTES
·THIS PORT IS USED TO PUMP WATER INTO THE SYSTEM
AND RE-SUSPEND ACCUMULATED SEDIMENT SO THAT IT
MAY BE PUMPED OUT.
·MINIMUM REQUIRED MAINTENANCE INCLUDES A
QUARTERLY INSPECTION DURING THE FIRST YEAR OF
OPERATION AND A YEARLY INSPECTION THEREAFTER.
FLUSH AS NEEDED.
·ONLY R-TANKHD, R-TANKSD, R-TANKUD, AND R-TANKXD MAY
BE USED IN TRAFFIC APPLICATIONS.
·IF MAINTENANCE PORT IS LOCATED IN A NON-TRAFFIC
AREA, A PLASTIC CAP CAN BE USED IN LEU OF A FRAME
AND COVER WITH CONCRETE COLLAR.
16.25" FRAME AND
COVER
PAVED SURFACE
BACKFILL COMPACTED TO
95% STANDARD PROCTOR
DENSITY
B
GEOGRID
(REQUIRED IN TRAFFIC AREAS)A
GEOTEXTILE
NOTCH BOTTOM OF
PIPE SEE PATTERN
NON-CORROSIVE SOLID PLATE
PLASTIC, SLATE OR EQUIVALENT
(EXCEPT XD)
1" +/- VENTING PERFORATIONS
PIPE NOTCHING
PATTERN
8" NOTCHES CUT IN SHADED
AREAS (8 OPENINGS TOTAL)
1.5"
3.5"
R-TANK
DEPTH SUMMARY
TYPE A B
R-TANKLD 12" MIN - 36" MAX AS SHOWN
ON PLANS
R-TANKHD 20" MIN - 6.99' MAX 12"
R-TANKSD 18" MIN - 9.99' MAX 12"
R-TANKUD 12" MIN - 5.00' MAX 12"
R-TANKXD 6" MIN - 16.67' MAX N/A
12" DIA. PVC
MAINTENANCE
PORT
REINFORCED CONCRETE COLLAR
(WHERE REQUIRED),
MIN.1" CLEARANCE FROM PVC
R-TANK
GEOGRID (TENSAR BX-1200 OR EQUAL)
PAVED
SURFACE
R-TANKᴴᴰ UNITS WRAPPED IN
PROPEX 117F (OR EQUAL) ON TOP,
BOTTOM AND ALL SIDES
EXCAVATION LINE
AND ACF M200 (OR EQUAL)
4" UNCOMPACTED BASE MATERIALS
BACKFILL COMPACTED TO 95%
MODIFIED PROCTOR DENSITY
4" MIN.
INLET PIPE
OPTIONAL OUTLET PIPE
OPTIONAL
OVERFLOW
PIPE
36" MIN.
24" MIN
NOTE:
PRE-TREATMENT
STRUCTURES
NOT SHOWN
MODULE DATA
ISOMETRIC VIEW
SECTION VIEW
PLAN VIEW
FRONT VIEW
ISOMETRIC VIEW
SECTION VIEW
PLAN VIEW
FRONT VIEW
ISOMETRIC VIEW
SECTION VIEW
PLAN VIEW
FRONT VIEW
11/15/22