HomeMy WebLinkAbout009_DEQ Approval Infrastructure DE ,Q�,
Montana Department
of Environmental Quality
May 13, 2021
Mr. Tim Staub, P.E.
Mr. Mark A. Chandler, P.E
C&H Engineering and Surveying, Inc.
1091 Stoneridge Drive
Bozeman, MT 59718
RE: Swiss Plaza, Lot 3 Block 4 of Cattail Creek Subdivision Phase 1, Water and Sewer Main
Extensions; EQ#21-2128
Dear Mr. Staub and Mr. Chandler:
The design report, plans, referenced specifications and supporting information for the Swiss
Plaza, Lot 3 Block 4 of Cattail Creek Subdivision Phase 1, Water and Sewer Main Extensions
project were received on February 22, 2021. The design documents were submitted under the
seal of Mark A. Chandler, PE#9518ES. Additional information requested by the Department was
received on April 29, 2021. The submittal was reviewed in accordance with Department of
Environmental Quality design standards in Circular DEQ-1, 2018 edition and Circular DEQ-2, 2018
edition.
The project consists of the installation of approximately: 570 lineal feet of 8-inch DIP water main
and 525 lineal feet of 8-inch SDR 35 PVC sanitary sewer main.The project also includes all fittings,
valves, hydrants, manholes, services and appurtenances as shown on the plans and indicated in
the specifications.
Plans and Specifications for the Swiss Plaza, Lot 3 Block 4 of Cattail Creek Subdivision Phase 1,
Water and Sewer Main Extensions Project are hereby approved. One copy of the plans bearing
the approval stamp of the Department of Environmental Quality is enclosed. A second set will be
retained for Department record. The third set will be provided to the Gallatin City-County Health
Department.
Approval is given with the understanding that any deviation from the approved plans and
specifications will be submitted to the Department for review and approval. The project may not
be placed into service until the project engineer or designer certifies by letter to the Department
that the activated portion of the project was constructed in substantial accordance with the plans
and specifications approved by the Department and there are no deviations from the design
standards other than those previously approved by the department. Within 90 days after the
completion of construction, a complete set of certified "as-built" drawings must be signed and
Greg Gianforte,Governor I Chris Dorrington, Director I P.O. Box 200901 1 Helena, MT 59620-0901 1(406)444-2544 1 www.deq.mt.gov
RE:The Swiss Plaza, Lot 3 Block 4 of Cattail Creek Subdivision Phase 1,Water and Sewer Main Extensions
Project, E.Q.#21-2128
May 13, 2021
Page 2
submitted to the Department.
It is further understood that construction of this project must be completed within three years
of this approval date. If more than three years elapse before completing construction, plans and
specifications must be resubmitted and approved before construction begins.
Department approval of this project covers only those portions of the plans and specifications
that are subject to the Department's review authority under the Public Water Supply Laws (MCA
75-6)and the Administrative Rules promulgated thereunder(ARM 17.38).This approval does not
cover items found within the plans and specifications that are outside of the Department's review
authority, including but not limited to, electrical work, architecture, site grading or water and
sewer service connections.
Thank you for your efforts regarding this submittal. If you have any further questions or concerns,
please feel free to contact me at (406) 595-0491 or angela.pugh@mt.gov.
Sincerely,
Angela k Pugh, PE
DEQ Engineering Bureau
Public Water&Subdivision Section
Enclosures: One set of approved plans
cc: Gallatin City-County Health Department
Swiss Detail, Inc., 3004 North 27th Avenue, Bozeman, MT 59718
File: EQ#21-2128
Greg Gianforte,Governor I Chris Dorrington, Director I P.O.Box 200901 1 Helena,MT 59620-0901 1(406)444-2544 1 www.deq.mt.gov
CONSTRUCTION SPECIFICATIONS
FOR
WATER AND SEWER MAIN
IMPROVEMENTS
SWISS PLAZA MASTER SITE PLAN
LOT 3, BLOCK 4
CATTAIL CREEK SUBDIVISION, PHASE 1
Prepared for:
Swiss Detail, Inc.
3004 North 27th Ave,
Bozeman, MT 59718
Prepared by:
C &- H=
Engineering and Surveying Inc.
1091 Stoneridge Drive • Bozeman, MT 59718
Phone (406) 587-1115 • Fax (406) 587-9768
www.chengineers.com • info@chengineers.com
APPROVED `f"
Montana Department oa �� �;�,.•.�0�
Environmental Quality Project Number: 200203 ;� y << .• C,
w r' Date � ,,::�P/�?H26„ag1��/
EQ 44- 2-1 21 Z 13 March 2021
A
CONSTRUCTION SPECIFICATIONS
This project will be constructed in accordance with Montana Public Works Standard
Specifications (MPWSS), Sixth Edition, April 2010 and City of Bozeman Modifications to
Montana Public Works Standard Specifications, Sixth Edition,March 2011 (Section numbers with
COB Prefix).
The following sections of Construction Specifications and Standard Drawings as listed below are
according to said Montana Public Works Standard Specifications and Bozeman Modifications to
Montana Public Works Standard Specifications, and are hereby made a part of the Construction
Specifications and Bid Form by reference. The CONTRACTOR is responsible for complying
with all applicable sections of said documents. Sections with COB prefix identify sections of
MPWSS which have been modified by the City of Bozeman. All or part of the corresponding
MPWSS section may apply. A full set of MPWSS and City of Bozeman Modifications to
MPWSS are on file for inspection at the office of the Engineer, C&H Engineering and Surveying,
Inc. 1091 Stoneridge Drive, Bozeman, MT 59718 (406) 587-1115 or are available from the
Montana Contractor's Association, Inc. 1717 111h Avenue, Helena, MT 59604.
BIDDING REQUIREMENTS, CONTRACT FORMS AND CONDITIONS OF THE
CONTRACT
SECTION 00100 Invitation to Bid
SECTION 00200 Instructions to Bidders
SECTION 00300 Bid Form
SECTION 00500 Agreement Form
SECTION 00700 General Conditions for Public Works Projects EJCDC 00700(Reference
only -not included)
SECTION 00810 Supplementary Conditions to the General Conditions
MISCELLANEOUS FORMS(for guidance only)
FORM C-430 Bid Bond
FORM C-510 Notice of Award
FORM C-550 Notice to Proceed
FORM C-610 Performance Bond
FORM C-615 Payment Bond
FORM C-620 Contractor's Application for Payment
FORM C-940 Work Change Directive
FORM C-941 Change Order
FORM C-942 Field Order
DIVISION 1 - GENERAL REQUIREMENTS
SECTION 0 10 10 Summary of Work
SECTION 01041 Project Coordination
SECTION 01050 Field Engineering
SECTION 01090 References
SECTION 01300 Submittals
SECTION 01400 Contractor Quality Control and Owner Quality Assurance
COB 01500 Construction and Temporary Facilities
COB 01570 Construction Traffic Control
COB 01580 Temporary Water Supply
SECTION 01700 Contract Closeout
DIVISION 2 - SITE WORK
SECTIONS 02100- SITE PREPARATION
SECTION 02110 Geotextiles
COB 02112 Removal of Existing Pavement,Concrete Curb, Sidewalk, Driveway and/or
Structures
COB 02113 Adjusting Existing Manholes, Lampholes, Inlets, Water Valve Boxes,
Water Services and Fire Hydrants to Grade
SECTION 02114 Relocating or Removing Utility Poles, Street Signs and Mailboxes
SECTIONS 02200 - EARTHWORK
COB 02221 Trench excavation and backfill for pipelines & appurtenant structures
SECTION 02222 Low permeability trench backfill plugs
SECTION 02225 Flowable fill
SECTION 02230 Street Excavation, backfill and Compaction
SECTION 02234 Sub-base course
COB 02235 Crushed base course
SECTIONS 02500 - PAVING AND SURFACING
COB 02502 Asphalt prime and/or tack coat
COB 02504 Asphalt seal coat
SECTION 02505 Construction seal
COB 02510 Asphalt concrete pavement
SECTION 02515 Portland cement concrete pavement
COB 02528 Concrete Curb and gutter
COB 02529 Concrete sidewalks, driveways, approaches, curb turn fillets, valley gutters
and miscellaneous new concrete construction
COB 02581 Pavement markings and markers (pre-formed plastic, paints and enamels)
COB 02582 Reflective Thermoplastic pavement markings
SECTIONS 02600 - WATER DISTRIBUTION
COB 02660 Water distribution systems
SECTIONS 02700 - SEWERAGE AND DRAINAGE
COB 02720 Storm drain systems
COB 02730 Sanitary sewer collection system
SECTIONS 02900 - LANDSCAPING
SECTION 02910 Seeding
SECTION 02920 Hydraulic seeding
DIVISION 3 - CONCRETE
SECTIONS 03200 - CONCRETE REINFORCEMENT
SECTION 03210 Reinforcing steel
SECTION 03310 Structural Concrete
MISCELLANEOUS
COB 09810 Street Signs
APPENDIX A
LIST OF STANDARD DRAWINGS
COB 01500-1 Vehicle Tracking Control
COB 01570-1 Traffic Control, Minimum Standard, Urban Work Site, 4 Lane Road,
Work Site Closing One Lane
COB 01570-2 Traffic Control, Minimum Standard, Urban Work Site, 2 Lane Road,
Work Site on Centerline
COB 01570-3 Traffic Control, Minimum Standard, Urban Work Site, 4 Lane Road,
Work Site on Centerline Partially Blocking Inside Lanes
COB 01570-4 Traffic Control, Minimum Standard, Urban Work Site, 2 Lane Road, 1
Lane Partially or Fully Closed By Work Area
COB 01570-5 Traffic Control, Minimum Standard, Rural Work Site, Work Adjacent to
the Present Traveled Way
COB 01570-6 Traffic Control, Minimum Standard, Rural Work Site, Utility Work On or
Across the Present Traveled Way
COB 01570-7 Pedestrian Traffic Control for Temporary Sidewalk Closure
COB 01570-8 Sidewalk Closure with Detour
COB 02213-1 Manhole Adjustment Detail
COB 02213-2 Water Valve Adjustment
MPW 02221-1 Typical Utility Trench Detail
MPW 02221-2 Pipe Bedding Alternative
MPW 02222-1 Trench Plug Excavation
COB 02528-1 Integral Curb& Gutter
MPW 02528-2 Drive Over Curb& Gutter
COB 02529-5 Driveway Approach With Sidewalk Adjacent to Curb
MPW 02529-5A Boulevard Drive Approach
MPW 02529-513 Curb Walk Drive Approach
MPW 02529-6 Retrofit Drive Approach
MPW 02529-7A Boulevard Alley Approach
COB 02529-713 Curb Walk Alley Approach
MPW 02529-8 Accessibility Ramp
COB 02529-8 Pedestrian Ramp
COB 02529-8A Blended Transition Pedestrian Ramp
MPW 02529-10 Mail Box Mounting for Curbline Delivery
COB 02529-11 Residential Driveway Approach and Sidewalk Details
COB 02529-12 Non-Residential Driveway Approach
COB 02529-14 Concrete Storm Drainage Outlet and Inlet Chases
COB 02529-15 Publicly-Maintained Sidewalk
COB 02529-16 Asphalt Pathway Typical Section
COB 02529-17 Concrete Class 1 Trail Typical Section
COB 02529-18 Class 2 Trail Typical Section
COB 02581-1 Typical Pavement Markings for Pedestrian Crossings(Type"A"Crossings)
COB 02581-2 Typical Pavement Markings for School Crossings (Type `B" Crossings)
MPW 02660-1 Thrust Blocking for Water Main Fittings
MPW 02660-2 Water and Sewer Main Separation
COB 02660-3 Thrust Blocking for Water Main Valves
COB 02660-4 Fire Hydrant Setting
COB 02660-5 Hydrant Location Detail
COB 02660-6 Water Service Line
COB 02660-7 Blowoff Valve
COB 02660-8 Hydrant Barrier Posts
COB 02660-10 Typical Valve/Tee Restraint
COB 02660-11 Water Main Crossing Below Existing Sewer Main
COB 02660-12 Standard Domestic Service Line Installation for Sizes 4" and Larger
COB 02660-13 Standard Fire Service Line Installation For Class 1, 11 and III Systems
COB 02660-14 Standard Fire Service Line Installation For Class IV and V Systems
COB 02660-15 Water Service Line from Curb Stop to Building (Lines 2" and Smaller)
COB 02660-16 Water and Sewer Main and Services Location Standards
COB 02660-17 Water Service Interior Clearances
COB 02720-1 36" Standard Storm Drain Inlet
COB 02720-1 A Standard Square Storm Drain Inlet
COB 02720-1B Combination Manhole and Curb Inlet
MPW 02720-2 24" Standard Riser Inlet
COB 02720-3 Sanitary Sewer and Storm Drain Manhole
COB 02720-4 Standard Straight Manhole
MPW 02720-5 48" Standard Manhole Showing 2 types of cone details
MPW 02720-6 Precast Manhole Bases
MPW 02720-7 Typical Manhole Channel Details
MPW 02720-8 Standard Cast Iron Cover
MPW 02720-9 Standard 24" Cast Iron Ring Manhole Frame
MPW 02720-10 Storm Drain Service Line
COB 02720-11 Storm Drain Debris Rack
MPW 02730-1 Nomograph for Air Testing Gravity Sewer Mains
COB 02730-2 Sanitary Sewer Service Line
MPW 02730-3 Deep Sanitary Sewer Service Line
COB 02730-4 Sanitary Sewer Cleanout
COB 09810-1 Sign Installation Standards
COB 09810-4 Standard Street Marker Sign Location
G:\C&H\20\200203\APPLICATIONS\MAIN EXTENSION INFRASTRUCTURE\WORKING