HomeMy WebLinkAbout004 D2.1 - DEMO_BASEMENT FLOOR PLANSLOAD BEARING WALL TO REMAIN
REMOVE AND SALVAGE
KITCHEN APPLIANCES
EXISTING PLUMBING PIPE -
TO REMAIN
EXISTING FLOOR DRAIN -
TO REMAIN
DEMO EXISTING WINDOW,
FRAME AND HARDWARE TO ALL
EXTENTS.
INSTALL NEW EGRESS WINDOW
DEMO EXISTING WINDOW,
FRAME AND HARDWARE TO ALL
EXTENTS.
INSTALL NEW WINDOW -
MAINTAIN EXISTING SIZE
DEMO EXISTING WINDOW,
FRAME AND HARDWARE TO ALL
EXTENTS.
INSTALL NEW ENTRY DOOR
DEMO EXISTING STAIRS, FLOOR FINISH,
STORAGE WALLS AND DOORS
DEMO EXISTING WINDOW, FRAME AND
HARDWARE TO ALL EXTENTS.
INSTALL NEW EGRESS WINDOW
DEMO EXISTING WINDOW, FRAME
AND HARDWARE TO ALL EXTENTS.
INSTALL NEW WINDOW -MAINTAIN
EXISTING SIZE
EXISTING FLOOR DRAIN -TO
REMAIN3' - 6"+/-1' - 9 3/4"DEMO PORTION OF
FOUNDATION WALL FOR
NEW ENTRY -CONFIRM
MEASURMENTS ON-SITE
OPEN JOIST CEILING
WITH DUCTS
GENERAL FLOOR PLAN DEMO NOTES
1. DIMENSIONS ARE TAKEN FROM INTERIOR FINISH FACE OF
WALL
2. TOLERANCES FOR INTERIOR DIMENSIONS ARE +/-0'-2"
3. REMOVE, SALVAGE AND RE-INSTALL IN NEW PLAN
TOILET, VANITY, WASHER, DRYER, FRIDGE AND RANGE.
4. DASHED LINES DENOTE DEMOLITION
DEMO REFLECTED CEILING PLAN LEGEND:
1. DEMO ALL CEILING TILE c/w GRID
2. DETERMINE EXTENTS OF GYPSUM WALL BOARD DEMOLITION -MAINTAIN IF POSSIBLE
3. DETERMINE EXTENTS OF DUCT DEMOLITION ONSITE -CONSULT WITH HVAC
GYPSUM BOARD
1'-0" x 1'-0" CEILING TILE c/w GRID
MECHANICAL DUCTS
AND/OR BULKHEAD
SCALE:
DRAWN:
PROJECT NO:Contractor Note: All site conditions and dimensions to be varified on-site. Inform Architect of design discrepancies.DATE:
As indicated
1/6/2023 10:50:37 AM
D2.1
22-019
DEMO_BASEMENT
FLOOR PLANS5TH AVE BASEMENT RENOVATIONMAHONEY HOLDINGS1222 5th AVE,BOZEMAN MONTANA1/4" = 1'-0"1 Basement_Demo
1/4" = 1'-0"2 Basement Reflected Ceiling Plan